Plan Review Details - Permit 13110136
Plan Review Stops For Permit 13110136
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2014-01-06 Cont ID  
Sent By jgomez Date 2014-01-06 Time 17:56 Rev Time 0.00
Received By jgomez Date 2014-01-06 Time 17:56 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2013-12-09 Cont ID  
Sent By jgomez Date 2013-12-09 Time 14:17 Rev Time 0.00
Received By jgomez Date 2013-12-09 Time 14:17 Sent To  
Notes
2013-12-09 15:06:39NEW RESIDENTIAL SHED, BUILDING REVIEW COMMENTS.
 CODE: 2010 FBC.
  
 1- SHEET S.1:
 A) DESIGN PARAMETERS: *(1) CLARIFY IF THE WIND SPEED OF
 170 MPH IS THE ULTIMATE OR THE OR NOMINAL DESIGN WIND
 SPEED. SEC. R301.2.1.3 OF 2010 FBC-RESIDENTIAL.
  
 **(2) CLARIFY IF WIND EXPOSURE IS "D" OR "C". DESIGN
 PARAMETERS CALL FOR "D", WHILE STRUCTURAL NOTE 2(C) ON
 SAME PAGE CALLS FOR EXPOSURE "C". SEC. 107.2.1 CITY
 AMENDMENTS TO FBC.
  
 ***(3) CLARIFY WHY THE ROOF LIVE LOAD IS ONLY 10PSF.
 WHAT SECTION OF THE CODE IS USED TO DETERMINE THIS ROOF
 LIVE LOAD?. ALSO, COORDINATE WITH "ADDED ROOF DESIGN
 LOADS" SHOWN ON SHEET S.2. SEC. 07.2.1 CITY AMENDMENTS
 TO FBC.
  
 ****(4) CLARIFY WHY THE BOTTOM CHORD DEAD LOAD IS
 30PSF. SEC. R301.1 OF 2010 FBC-RESIDENTIAL.
  
 B) REVISE THE DOORS AND WINDOWS DESIGN PRESSURES TO
 MATCH THE CORRECT EXPOSURE AS SPECIFIED ON ITEM # A)(2)
 ABOVE. SEC. R301.1 OF 2010 FBC-RESIDENTIAL.
  
 C) SPECIFY SAFETY GLASS FOR THE WINDOW IN THE STORAGE
 AREA AS REQUIRED BY SEC. R308.4(2) OF 2010
 FBC-RESIDENTIAL.
  
 D) TYP. WOOD FRAME WALL DETAIL: SPECIFY THE HEADER
 SIZES. SEC. R301.1 OF 2010 FBC-RESIDENTIAL.
  
 E) SPECIFY TWO LAYERS OF ROOF UNDERLAYMENT AS REQUIRED
 BY SEC. R905.2.2 OF 2010 FBC-RESIDENTIAL
  
 2- SHEET S.2:
 A) NEW ROOF FRAMING PLAN. SPECIFY CONNECTORS TOP AND
 BOTTOM FOR (3)2X6 STUDS SUPPORTING THE RIDGE BEAM. SEC.
 R301.1 OF 2010 FBC-RESIDENTIAL.
  
 B) PROVIDE GABLE END FRAMING DETAIL THAT MATCHES
 PROPOSED ROOF FRAMING PLAN SHOWN. SEC. R301.1 OF 2010
 FBC-RESIDENTIAL.
 DETAIL PROVIDE ON SAME SHEET DOESN'T MATCH PROPOSED
 ROOF FRAMING PLAN.
  
 C) COMPONENT AND CLADDING PRESSURES ZONES CHART:
 *(1) REVISE NAIL SPACING. ROOF ZONE 3 REQUIRES NAIL
 SPACING TO BE AT 4"O.C. AND, ROOF ZONE 1 AND 2 REQUIRES
 NAIL SPACING TO BE 6"O.C.
  
 **(2) REVISE PLAN FOR GABLE ROOF SHEATHING. GABLE IS
 ROOF ZONE 3 ONLY AND FOR 5'-0" MIN. SEE FIGURE
 R803.2.3.1 OF 2010 FBC-RESIDENTIAL.
  
 D) SECTION "A-A": REVISE THE ROOF SHEATHING
 SPECIFICATIONS TO MATCH COMPONENT AND CLADDING PRESSURE
 ZONES CHART AND ITEM C) ABOVE. SEC. 107.2.1 CITY
 AMENDMENTS TO FBC.
  
 3- PROVIDE PRODUCT APPROVAL (2 COPIES) AS REQUIRED BY
 DCA RULE 9N-3 FOR:
 A) VINYL SIDING PRODUCT APPROVAL AS SHOWN ON PLANS.
 FLORIDA PRODUCT APPROVAL FL705-R3 SUBMITTED IS FOR
 STRUCTURAL WALL PANELS NOT FOR VINYL SIDING.
  
 B) ALL SIMPSON STRUCTURAL CONNECTORS SPECIFIED ON
 FRAMING PLANS, DETAILS AND SECTIONS. NOTE: PROVIDE ONLY
 THE PRODUCT APPROVAL COVER PAGE AND PAGE SHOWING THE
 SPECIFIED CONNECTOR.
  
 4- ENGINEER OF RECORD TO REVIEW AND APPROVE IN WRITING
 ALL PRODUCT APPROVALS AS REQUIRED BY SEC. 107.3.4.1 OF
 CITY AMENDMENTS. ***NOTE: PRODUCT APPROVALS SUBMITTED
 HAVE THE REVIEW STAMP, BUT THEY ARE MISSING THE
 SIGNATURE OF THE ENGINEER OF RECORD.
  
 5- HURRICANE STORM SHUTTERS: PROVIDE COMPLETE
 INSTALLATION SCHEDULE. SPECIFY MOUNTING CONDITIONS AND
 SPECIFIC ANCHOR AND SPACING. SEE CITY SAMPLE ON CITY
 WEBSITE OR OBTAIN ONE FROM THE LOBBY FRONT DESK. SEC.
 107.2.1 CITY AMENDMENTS TO FBC.
  
 6- VALUATION DECLARED IN THE PERMIT APPLICATION IS TOO
 LOW. FOR THE PURPOSE OF PERMITTING VALUATION INCLUDES
 ALL LABOR, MATERIALS, CONTRACTOR'S OVERHEAD AND PROFIT
 AND DESIGN PROFESSIONAL FEES. SEC. 109.3 CITY
 AMENDMENTS TO FBC. VALUATION WAS UPDATED TO $11,776.
 THE NEW PERMIT FEE BALANCE IS $406.59.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CALL
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561)805-6712

Review Stop E ELECTRICAL
Rev No 2 Status N Date 2014-01-06 Cont ID  
Sent By jgomez Date 2014-01-06 Time 18:31 Rev Time 0.00
Received By jgomez Date 2014-01-06 Time 18:31 Sent To  
Notes
2014-01-06 18:32:38NO ELECTRICAL WORK. NO REVIEW REQUIRED. CHANGED FOR
 PREFABRICATED SHED. ANY ELECTRICAL WORK NEED TO BE
 SUBMITTED UNDER SEPARATE PERMITS. JG.

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2013-12-12 Cont ID  
Sent By albarran Date 2013-12-12 Time 14:39 Rev Time 0.00
Received By albarran Date 2013-12-12 Time 14:07 Sent To I
Notes
2013-12-12 14:44:47THE FOLLOWING ELECTRICAL CORRECTIONS SHALL BE MADE TO
 THE SUBMITTED PLANS FOR A SUCCESSFUL ELECTRICAL REVIEW:
 1. THE PANEL SCHEDULE AS SHOWN ON THE PLANS, DOES NOT
 MATCH THE RISER DIAGRAM OR THE ELECTRICAL LAYOUT AS
 SHOWN ON THE FLOOR PLAN. YOU ARE INDICATING TWO
 DIFFERENT METHODS TO SUPPLY ELECTRIC POWER TO THE SHED.
 WHICHEVER METHOD YOU DECIDE TO USE, ALL THE DRAWINGS
 HAVE TO COINCIDE.
 2. REMOVE OR CORRECT THE ELECTRICAL NOTE ON THE
 SUBMITTED PLANS, AS A NEW METER IS BEYOND THE SCOPE OF
 THIS PERMIT.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2014-01-06 Cont ID  
Sent By jgomez Date 2014-01-06 Time 18:25 Rev Time 0.00
Received By jgomez Date 2013-12-19 Time 13:57 Sent To  
Notes
2013-12-23 13:58:07RESUBMITTAL SENT TO ZONING SHELF FOR L. LOUIE"S REVIEW.
 JG.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2013-12-13 Cont ID  
Sent By shill Date 2013-12-13 Time 18:23 Rev Time 0.00
Received By shill Date 2013-11-06 Time 17:11 Sent To  
Notes
2013-12-12 14:45:52SENT TO SH DESK
2013-11-06 17:11:28R11

Review Stop P PLUMBING
Rev No 2 Status N Date 2014-01-06 Cont ID  
Sent By jgomez Date 2014-01-06 Time 18:30 Rev Time 0.00
Received By jgomez Date 2014-01-06 Time 18:30 Sent To  
Notes
2014-01-06 18:30:50NO PLUMBING. CHANGED FOR PREFABRICATED SHED. JG.

Review Stop P PLUMBING
Rev No 1 Status P Date 2013-12-10 Cont ID  
Sent By jgomez Date 2013-12-10 Time 09:53 Rev Time 0.00
Received By jgomez Date 2013-12-10 Time 09:53 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2013-12-26 Cont ID  
Sent By llouie Date 2013-12-26 Time 10:58 Rev Time 0.00
Received By llouie Date 2013-12-26 Time 10:58 Sent To  
Notes
2013-12-26 10:58:5612/26/13 - ZONING PASSED. HANDED PLANS TO JULIO GOMEZ.
 LL

Review Stop Z ZONING
Rev No 1 Status F Date 2013-11-14 Cont ID  
Sent By llouie Date 2013-11-14 Time 11:30 Rev Time 0.00
Received By llouie Date 2013-11-14 Time 11:30 Sent To  
Notes
2013-11-14 11:32:32** FAILED **
  
 PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE
 COMMENTS IN WRITING AND/OR ON THE PLANS WHERE
 APPLICABLE:
  
 1.) PROVIDE SURVEY.
  
 PLEASE NOTE THAT ANY REVISIONS MAY RESULT IN ADDITIONAL
 COMMENTS. CONTACT LINDA LOUIE @ (561) 822-1442 IF YOU
 HAVE QUESTIONS.
  
2013-11-13 15:24:0711/13/13