| Plan Review Stops For Permit 13100921 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2013-11-09 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2013-11-09 |
Time |
12:00 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2013-11-09 |
Time |
10:08 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2013-11-09 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2013-10-30 |
Time |
07:23 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2013-10-29 |
Time |
18:26 |
Sent To |
|
|
| Notes |
| 2013-10-30 07:33:31 | REVISED SHEETS A-1, A-2, A-5 AND A-6 ARE APPROVED AS | | | RED-LINED. | | | | | | THE PRODUCT APPROVAL THAT WAS SUBMITTED FOR STEEL | | | STRUCTURAL ROOF PANEL (NOA NO. 08-0827.20) IS DENIED. | | | THE DESIGNER OF RECORD IS REQUIRED TO REVIEW AND | | | APPROVE THE PRODUCT APPROVAL IN WRITING. THIS PRODUCT | | | IS DESIGNED AND TESTED TO BE INSTALLED OVER A METAL | | | FRAME ROOF AS A STRUCTURAL COMPONENT OF THE MAIN WIND | | | FORCE RESISTING SYSTEM, RATHER THAN CLADDING. THE PLANS | | | INDICATE THAT THIS STRUCTURE HAS WOOD TRUSSES COVERED | | | WITH A PLYWOOD DECK. SINCE IT WILL NOT BE INSTALLED PER | | | THE MANUFACTURER'S INSTALLATION INSTRUCTIONS, IF YOU | | | WISH TO USE THIS PRODUCT YOU WILL NEED TO SUBMIT IT AS | | | ALLOWED BY CITY AMENDMENT 104.11 ALTERNATIVE | | | MATERIALS,DESIGN AND METHODS OF CONSTRUCTION FOR THE | | | BUILDING OFFICIALS APPROVAL. THE FASTENER SIZE,TYPE, | | | SPACING, SPANS AND ROW SPACING WILL NEED TO BE | | | SPECIFIED AND SHOWN TO BE COMPLIANT WITH THE APPLICABLE | | | CODE. (2007 FBC W/2009 REVISIONS) |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2013-11-09 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2013-11-09 |
Time |
12:00 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2013-11-09 |
Time |
10:08 |
Sent To |
|
|
| Notes |
| 2013-11-09 12:04:11 | | | | | | | RED-LINED PLANS | | 2013-11-07 16:41:40 | NEW SHEETS SUBMITTED. JG. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2013-10-30 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2013-10-30 |
Time |
08:33 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2013-10-30 |
Time |
08:33 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
HIST |
HISTORICAL |
| Rev No |
2 |
Status |
N |
Date |
2013-11-09 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2013-11-09 |
Time |
12:02 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2013-11-09 |
Time |
12:03 |
Sent To |
|
|
| Notes |
| 2013-11-09 12:03:20 | METAL ROOF WAS APPROVED ON PREVIOUS REVIEW. |
|
|
| Review Stop |
HIST |
HISTORICAL |
| Rev No |
1 |
Status |
P |
Date |
2013-10-24 |
|
|
Cont ID |
|
| Sent By |
fmittner |
Date |
2013-10-24 |
Time |
16:30 |
Rev Time |
0.00 |
| Received By |
fmittner |
Date |
2013-10-24 |
Time |
16:30 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2013-11-09 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2013-11-09 |
Time |
12:03 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2013-11-07 |
Time |
16:39 |
Sent To |
|
|
| Notes |
| 2013-11-07 16:40:35 | SENT TO ZONING FOR HISTORICAL REVIEW. JG. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2013-10-30 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2013-10-30 |
Time |
08:33 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2013-10-24 |
Time |
18:21 |
Sent To |
|
|
| Notes |
| 2013-10-24 18:22:08 | SENT R MCDOUGAL |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
N |
Date |
2013-10-30 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2013-10-30 |
Time |
06:52 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2013-10-30 |
Time |
06:52 |
Sent To |
|
|
| Notes |
| 2013-10-30 07:00:07 | NO REVISED MECHANICAL PLANS WERE SUBMITTED. |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2013-11-09 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2013-11-09 |
Time |
12:01 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2013-11-09 |
Time |
10:07 |
Sent To |
|
|
| Notes |
| 2013-11-09 12:02:30 | APPROVED WITH EXCEPTION. RED-LINED PLANS. |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2013-10-29 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2013-10-29 |
Time |
19:33 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2013-10-29 |
Time |
18:26 |
Sent To |
|
|
| Notes |
| 2013-10-29 19:34:16 | 2007 FBC WITH 2009 REVISIONS | | | | | | DENIED BY PLUMBING | | | | | | 1) THE PLUMBING RISER DIAGRAM ON REVISED SHEET E-1 DOES | | | NOT MATCH THE FLOOR PLAN. THE MASTER BATH HAS A SINGLE | | | BOWL VANITY, A SHOWER IS SHOWN AT THE 1/2 BATH AND THE | | | KITCHEN SINK IS LABELED AS A VANITY. PLEASE CORRECT. | | | CITY AMENDMENTS 107.2.1 | | | | | | 2) THE SHOWER AND TUB IN THE MASTER BATH AND THE | | | WATERCLOSET AND TUB IN THE FULL BATH ARE NOT PROPERLY | | | VENTED. P3108.2 VENT CONNECTIONS. THE DRY VENT | | | CONNECTION TO THE WET VENT SHALL BE AN INDIVIDUAL VENT | | | OR COMMON VENT TO THE LAVATORY, BIDET, SHOWER OR | | | BATHTUB. IN VERTICAL WET VENT SYSTEMS, THE MOST | | | UPSTREAM FIXTURE DRAIN CONNECTION SHALL BE A DRY-VENTED | | | FIXTURE DRAIN CONNECTION. IN HORIZONTAL WET-VENT | | | SYSTEMS, NOT MORE THAN ONE WET-VENTED FIXTURE DRAIN | | | SHALL DISCHARGE UPSTREAM OF THE DRY-VENTED FIXTURE | | | DRAIN CONNECTION. | | | | | | ROBERT MCDOUGAL | | | BLDG. PLAN REVIEW | | | (561)805-6714 | | | [email protected] |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2013-10-24 |
|
|
Cont ID |
|
| Sent By |
fmittner |
Date |
2013-10-24 |
Time |
16:29 |
Rev Time |
0.00 |
| Received By |
fmittner |
Date |
2013-10-24 |
Time |
16:29 |
Sent To |
|
|
| Notes |
|
|