| Plan Review Stops For Permit 13100500 |
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2013-10-31 |
|
|
Cont ID |
|
| Sent By |
albarran |
Date |
2013-10-31 |
Time |
10:23 |
Rev Time |
0.00 |
| Received By |
albarran |
Date |
2013-10-31 |
Time |
10:20 |
Sent To |
PC |
|
| Notes |
| 2013-10-31 10:26:23 | THE SCOPE OF THIS PERMIT IS LIMITED TO THE INSTALLATION | | | OF THE DOWN PIPE AND SWEEP, ALONG WITH MAKING CERTAIN | | | THAT THE GROUNDING MEETS THE REQUIREMENTS OF THE | | | CURRENT EDITION OF THE NEC. | | | SERVICE CONDUCTORS PROVIDED AND INSTALLED BY FPL. | | | | | | GIVEN TOI JAIME | | 2013-10-31 10:20:54 | ELECTRICAL CONTRACTOR CAME TO THE OFFICE TO EXPLAIN THE | | | SCOPE OF WORK AND CORRECT THE DRAWING ACCORDINGLY |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2013-10-22 |
|
|
Cont ID |
|
| Sent By |
albarran |
Date |
2013-10-22 |
Time |
11:08 |
Rev Time |
|
| Received By |
albarran |
Date |
|
Time |
|
Sent To |
I |
|
| Notes |
| 2013-10-22 11:05:41 | THE DRAWING SUBMITTED FOR THIS PERMIT IS UNACCEPTABLE. | | | YOU WILL NEED TO PROVIDE A SINGLE LINE DRAWING OF THE | | | SERVICE (RISER DIAGRAM) ALONG WITH LOAD CALCS FOR THE | | | HOME. | | | SENT TO SH DESK |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2013-10-24 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2013-10-24 |
Time |
12:29 |
Rev Time |
0.00 |
| Received By |
jlmitch |
Date |
2013-10-16 |
Time |
10:58 |
Sent To |
|
|
| Notes |
| 2013-10-16 10:59:16 | INCOMING SENT TO<$5K ELECTRIC BOX. JWITMER |
|
|
|