Plan Review Details - Permit 13090405
Plan Review Stops For Permit 13090405
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2013-10-24 Cont ID  
Sent By rmcdouga Date 2013-10-22 Time 09:55 Rev Time 0.00
Received By rmcdouga Date 2013-10-21 Time 18:56 Sent To Z
Notes
2013-10-22 09:55:37BUILDING PROVISO
  
 1) SUBMIT TWO COPIES OF THE ICC EVALUATION REPORT FOR
 THE ICYNENE SPRAY FOAM INSULATION THAT WILL BE
 INSTALLED. FBC R316
  
 2) THE RAS 117 CALCULATIONS FOR THE FLAT ROOF BASE
 SHEET FASTENING FROM DANIEL J. MOSS, P.E. DO NOT HAVE
 HIS HANDWRITTEN SIGNATURE (FACSIMILES ARE NOT
 ACCEPTABLE) AS REQUIRED BY FAC 61G15-23.002. SUBMIT RAS
 117 CALCULATIONS WITH ORIGINAL SIGNATURES. ALSO THE
 ADDRESS FOR THE CITY OF WEST PALM BEACH IS INCORRECT ON
 THE DOCUMENT. PLEASE CORRECT THE ADDRESS TO 401
 CLEMATIS STREET WEST PALM BEACH FL 33401.
  
 3) THE ENERGY CALCULATIONS THAT WERE SUBMITTED STILL
 APPEAR TO BE IN ERROR. A 2 FT. OVERHANG IS STILL LISTED
 AND THE STRUCTURE HAS NO OVERHANG. ALSO THE GLAZED AREA
 AT THE NORTH ELEVATION DOES NOT APPEAR TO INCLUDE THE
 TOTAL AREA OF THE (2) 5' X 8' GLAZED FRENCH DOORS AND
 THE SPECIFIED AREAS ARE UNCLEAR. PLEASE SUBMIT TWO
 REVISED SIGNED SETS. 2010 FBC ENERGY CONSERVATION
 SECTIONS 405.5.1, 405.5.2 AND 405.5.3
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2013-09-27 Cont ID  
Sent By rmcdouga Date 2013-09-27 Time 11:26 Rev Time 0.00
Received By rmcdouga Date 2013-09-24 Time 18:50 Sent To  
Notes
2013-09-27 11:26:002010 FBC
  
 DENIED BY BUILDING
  
 1) THE ENERGY CALCULATIONS CONTAIN SEVERAL ERRORS.
 ENERGY CALCULATIONS ARE REQUIRED TO BE SPECIFIC TO THE
 ORIENTATION OF THE BUILDING. WORST CASE CAN NOT BE
 USED. THE FORM USES AN OVERHANG OF 2 FEET WHEN THERE
 ISN'T ANY. A 50 GAL. WATER HEATER IS SPECIFIED ON THE
 FORM AND THE PLANS SHOW A 30 GALLON. THE OWNER/AGENT IS
 REQUIRED TO SIGN THE ENERGY FORMS. 2010 FBC ENERGY
 CONSERVATION SECTION 405.
  
 2) SHOW COMPLIANCE WITH FBC 318.6 WHICH REQUIRES
 GUTTERS WITH DOWNSPOUTS THAT DISCHARGE ONE FOOT AWAY
 FROM THE STRUCTURE WALLS FOR BUILDINGS WITH LESS THAN 6
 INCHES OF HORIZONTAL EAVE PROJECTION.
  
 3) SHOW COMPLIANCE WITH FBC 806.1 FOR ATTIC / ROOF
 VENTILATION.
  
 4) SPECIFY THE FASTENING OPTION AND MAXIMUM DESIGN
 PRESSURE FOR THE ASSEMBLY ON PAGE 29 OF THE GAF
 RUBEROID PRODUCT APPROVAL (NOA NO. 09-0224.01) THAT
 WILL BE USED. SUBMIT TWO COPIES OF SIGNED AND SEALED
 RAS 117 CALCULATIONS FOR ENHANCED FASTENING AT
 PERIMETER AND CORNER AREAS IN COMPLIANCE WITH
 LIMITATION NUMBER 7 OF THE NOA. FBC R301.2.1
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2013-09-27 Cont ID  
Sent By rmcdouga Date 2013-09-27 Time 09:27 Rev Time 0.00
Received By rmcdouga Date 2013-09-24 Time 18:50 Sent To  
Notes
2013-09-27 09:50:01APPROVED PROVISIONALLY. PLANS HAVE BEEN RED-LINED.

Review Stop HIST HISTORICAL
Rev No 2 Status P Date 2013-10-24 Cont ID  
Sent By fmittner Date 2013-10-24 Time 11:21 Rev Time 0.00
Received By fmittner Date 2013-10-24 Time 11:21 Sent To  
Notes
2013-10-24 11:22:33GAVE TO R. MCDOUGAL

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2013-09-17 Cont ID  
Sent By fmittner Date 2013-09-17 Time 16:07 Rev Time 0.00
Received By fmittner Date 2013-09-17 Time 16:07 Sent To B
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2013-10-24 Cont ID  
Sent By rmcdouga Date 2013-10-24 Time 15:37 Rev Time 0.00
Received By rmcdouga Date 2013-10-10 Time 18:55 Sent To  
Notes
2013-10-10 18:55:39SENT TO R MCDOUGAL

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2013-09-27 Cont ID  
Sent By rmcdouga Date 2013-09-27 Time 11:26 Rev Time 0.00
Received By rmcdouga Date 2013-09-13 Time 07:38 Sent To  
Notes
2013-09-20 07:40:04R07

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status N Date 2013-09-24 Cont ID  
Sent By rmcdouga Date 2013-09-24 Time 18:51 Rev Time 0.00
Received By rmcdouga Date 2013-09-24 Time 18:50 Sent To  
Notes
2013-10-25 12:47:55PLANS RETURNED WITH IMPACT STAMP
2013-09-24 18:51:41IMPACT FEE REVIEW REQUIRED.

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2013-10-22 Cont ID  
Sent By rmcdouga Date 2013-10-22 Time 07:28 Rev Time 0.00
Received By rmcdouga Date 2013-10-21 Time 18:56 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2013-09-27 Cont ID  
Sent By rmcdouga Date 2013-09-27 Time 09:53 Rev Time 0.00
Received By rmcdouga Date 2013-09-24 Time 18:50 Sent To  
Notes
2013-09-27 10:46:332010 FBC
  
 DENIED BY MECHANICAL
  
 1) SUBMIT TWO SETS OF MECHANICAL PLANS THAT SHOW THE
 LOCATION OF THE EQUIPMENT AND THE DUCT SYSTEM. SPECIFY
 THE SUPPLY / RETURN DUCT AND GRILL LOCATIONS AND SIZES.
 INDICATE THE CFMS AT EACH SUPPLY OUTLET. FBCR M1601.1
 AND CITY AMENDMENTS 107.3.5
  
 2) PROVIDE AN EQUIPMENT SCHEDULE ON THE MECHANICAL PLAN
 THAT CORRESPONDS WITH THE EQUIPMENT SIZING
 CALCULATIONS. FBCR M1401.3
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]

Review Stop P PLUMBING
Rev No 2 Status P Date 2013-10-22 Cont ID  
Sent By rmcdouga Date 2013-10-22 Time 07:29 Rev Time 0.00
Received By rmcdouga Date 2013-10-22 Time 07:29 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2013-09-27 Cont ID  
Sent By rmcdouga Date 2013-09-27 Time 06:31 Rev Time 0.00
Received By rmcdouga Date 2013-09-27 Time 06:31 Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status N Date 2013-09-27 Cont ID  
Sent By rmcdouga Date 2013-09-27 Time 09:50 Rev Time 0.00
Received By rmcdouga Date 2013-09-27 Time 09:50 Sent To  
Notes
2013-09-27 09:53:41ROOFING PRODUCT APPROVAL NOA NO.09-0224.01 GAF RUBEROID
 MODIFIED BITUMEN WAS SUBMITTED. SIGNED AND SEALED RAS
 117 CALCULATIONS ARE REQUIRED.

Review Stop Z ZONING
Rev No 2 Status P Date 2013-10-24 Cont ID  
Sent By rmcdouga Date 2013-10-24 Time 15:38 Rev Time 0.00
Received By fmittner Date 2013-10-24 Time 11:21 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2013-09-17 Cont ID  
Sent By fmittner Date 2013-09-17 Time 16:07 Rev Time 0.00
Received By fmittner Date 2013-09-17 Time 16:07 Sent To  
Notes
***NONE***