| Plan Review Stops For Permit 13081200 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2013-09-04 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2013-09-04 |
Time |
15:58 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2013-09-04 |
Time |
15:58 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2013-08-31 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2013-08-31 |
Time |
14:35 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2013-08-31 |
Time |
14:35 |
Sent To |
|
|
| Notes |
| 2013-08-31 14:40:43 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL, BUILDING PLANS EXAMINER | | | 561-805-6724 | | | [email protected] | | | | | | FBC FLORIDA BUILDING CODE 2010 | | | | | | 1. AS DISCUSSED, PROVIDE A PLAN WHICH SHOWS WHICH | | | PORTION OF THE ROOF IS TO BE COVERED UNDER THIS PERMIT. | | | | | | 2. STEEL DECK MODIFIED AND CONCRETE DECK MODIFIED | | | PRODUCT APPROVALS PROPOSED. MY UNDERSTANDING WAS THAT | | | THE STEEL DECK WAS RELATED TO NEW | | | CONSTRUCTION/RENOVATION UNDER A MASTER PERMIT. PLEASE | | | REMOVE AND SUBMIT AS A REVISION TO THE MASTER WITH THE | | | ENGINEERING REQUIRED RAS117 (FBC 1609) AND SHOP DRAWING | | | REVIEW STAMP FROM DESIGNER OF RECORD FBC 107. | | | | | | 3. IF THE CONCRETE DECK IS A REROOF, PROVIDE A MOISTURE | | | SURVEY FBC 1609. | | | |
|
|
|