| Plan Review Stops For Permit 13081099 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
6 |
Status |
P |
Date |
2014-01-16 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2014-01-16 |
Time |
19:39 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2014-01-16 |
Time |
19:39 |
Sent To |
|
|
| Notes |
| 2014-01-16 19:49:51 | ****PROVISOS**** | | | | | | 1. FINISHED CONSTRUCTION ELEVATION CERTIFICATE | | | (REQUIRED PRIOR TO FINAL INSPECTION) IS TO BE A SIGNED, | | | SEALED DATED ORIGINAL PER FLORIDA STATUTE 472.025. | | | SECOND PAGE IS TO INCLUDE AN ORIGINAL SIGNATURE. NOT | | | PHOTOCOPIES OR STAMPS WILL BE ACCEPTED. | | | | | | 2. ITEM C2 E, MACHINERY OR EQUIPMENT SERVICING THE | | | BUILDING, IS TO BE AT A MINIMUM ELEVATION OF 7'6". | | | | | | 3. IN ORDER TO AVOID C.O. DELAYS, SUBMIT THE "FINISHED | | | CONSTRUCTION" SURVEY AS A SUBMITTAL TO PLAN REVIEW | | | AFTER THE FOLLOWING HAS BEEN COMPLETED, BUT BEFORE A | | | FINAL INSPECTION HAS BEEN SCHEDULED: | | | | | | ALL MACHINERY AND/OR EQUIPMENT SUCH AS FURNACES, WATER | | | HEATERS, HEAT PUMPS, AIR CONDITIONERS AND THEIR | | | ASSOCIAED EQUIPMENT HAVE BEEN INSTALLED | | | | | | THE GRADING AROUND THE BUILDING HAS BEEN COMPLETED | | | | | | | | | | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
5 |
Status |
F |
Date |
2014-01-13 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2014-01-13 |
Time |
14:24 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2014-01-13 |
Time |
14:24 |
Sent To |
|
|
| Notes |
| 2014-01-13 14:51:55 | ****CORRECTIONS**** | | | ****ELEVATION CERTIFICATE PREPARED BY ROBERT A BUGGEE | | | DATED 1/8/14, "BUILDING UNDER CONSTRUCTION" **** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | 1. REVISE EC TO REFERENCE THE STRUCTURE THAT IT | | | REPRESENTS. PHOTOS SHOW THE EXISTING HOUSE AS WELL AS | | | THE BUILDING UNDER CONSTRUCTION. SEE EC INSTRUCTIONS; | | | ALL REFERENCES ARE TO "THE BUILDING" SINGULAR. | | | THEREFORE, THE ELEVATION CERTIFICATE SHOULD BE FOR ONE | | | STRUCTURE ONLY. THIS EC SHOULD BE FOR THE BUILDING | | | UNDER CONSTRUCTION (CABANA). PLEASE REVISE, INCLUDING | | | THE ITEMS IN C2. | | | | | | 2. A7 BUILDING DIAGRAM NUMBER IS 1A, BUT 1A IS SLAB ON | | | GRADE; ISN'T THIS A STEM WALL? REVISE EC OR EXPLAIN. | | | | | | 3. A9 INDICATES A GARAGE; SEE ITEM 1. IT APPEARS THAT | | | THIS IS FOR THE MAIN HOUSE. CABANA PLANS DO NOT SHOW A | | | GARAGE. | | | | | | 4. B1, INCLUDE COMMUNITY NUMBER. | | | | | | 5. MECHANICAL EQUIPMENT IN SECTION C2 MUST BE 7.5' | | | MINIMUM. NOTE THAT THIS IS TO BE THE ELEVATION OF THE | | | MECHANICAL EQUIPMENT, NOT THE SLAB. IF STANDS ARE | | | PROPOSED, THIS CAN BE EXPLAINED IN THE "COMMENTS" | | | SECTION. | | | | | | 6. SECTION D, PLEASE CHECK APPLICABLE BOXES. AS | | | LAT/LONG WERE PROVIDED BY A SURVEYOR, THE SOURCE IS TO | | | BE NOTED IN THE "COMMENTS" SECTION PER INSTRUCTIONS. | | | | | | 7. PAGE 2, INCORRECT JOB ADDRESS, PLEASE REVISE. | | | | | | 8. B4 IS TO INCLUDE MAP NUMBER AS WELL AS PANEL NUMBER. | | | | | | | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
N |
Date |
2014-01-02 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2014-01-02 |
Time |
15:33 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2013-11-06 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2013-11-06 |
Time |
15:06 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2013-11-06 |
Time |
15:06 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2013-10-24 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2013-10-23 |
Time |
17:56 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2013-10-23 |
Time |
17:55 |
Sent To |
|
|
| Notes |
| 2013-10-25 09:13:56 | 10-25/13 TALKED TO ANTHONY SABA. HE SAID OK TO DO | | | PROVISO. JG. | | 2013-10-23 18:02:16 | | | | BUILDING REVIEW APPROVED WITH PROVISO: | | | * 1- SURVEY SUBMITTED: NEED SURVEYOR'S ORIGINAL | | | SIGNATURE, NOT COPY. CHAPTER 472 FL. ST. | | | ** 2- REVISE ENERGY CALCULATIONS SUBMITTED AND | | | COORDINATE WITH FLOOR PLANS: *A)PROVIDE LEGIBLE FRONT | | | PAGE. **B)THERE IS NOT CRAWL SPACE. ***C)ROOF DECK IS | | | NOT INSULATED. ****D)THERE IS AN ATTIC (SEE DEFINITION | | | OF ATTIC). *****E) WHY GABLE AREA ON PAGE 2 OF 5 IS | | | 24FT IF THIS IS A FLAT ROOF?. ******F)REVISE THE | | | WINDOWS OVERHANG SEPARATION ON PAGE 3 OF 5 TO MATCH | | | PLANS. | | | ***3- REVISE TYPICAL WALL SECTION TO SHOW WALL | | | INSULATION VALUE AS SPECIFIED ON THE ENERGY | | | CALCULATIONS(R-5). | | | ****4- SUBMIT ENGINEER RAS 117 CALCULATIONS WITH | | | ENGINEER'S ORIGINAL SEAL AND SIGNATURE. CHAPTER 471 FL. | | | ST. | | | *****5- PROVIDE PRODUCT APPROVAL FOR WINDOW MULLION FOR | | | DOUBLE SLIDING WINDOWS ON SOUTH ELEVATION. | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2013-09-16 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2013-09-16 |
Time |
17:41 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2013-09-16 |
Time |
17:40 |
Sent To |
|
|
| Notes |
| 2013-09-16 17:55:40 | RESIDENTIAL (R3) ADDITION, BUILDING REVIEW COMMENTS. | | | CODE: 2010 FBC. | | | | | | 1- A) PROVIDE COMPLETE DETAILS AND SPECIFICATIONS FOR | | | FIRE RATED WALLS AND ROOF OVERHANGS AS REQUIRED BY | | | TABLE R302.1 OF 2010 FBC-RESIDENTIAL FOR PROPOSED | | | BUILDING THAT IS LOCATED @2'-0" FROM PROPERTY LINE. | | | | | | B) OPENINGS NOT ALLOWED IF DISTANCE TO PROPERTY LINE IS | | | LESS THAN 3'-0". REVISE PLANS AS REQUIRED. TABLE R302.1 | | | | | | 2- AFTER PLANS ARE REVISED, BRING THEM TO PALM BEACH | | | COUNTY (2300 N. JOG RD.) TO VERIFY IF IMPACT FEES ARE | | | REQUIRED. BRING BACK COUNTY STAMPED PLANS AND COPY OF | | | PAID RECEIPT IF FEES ARE DUE. REQUIRED BY THE COUNTY | | | IMPACT FEE ORDINANCE OF THE UNIFIED LAND DEVELOPMENT | | | CODE. | | | | | | 3- SHEET SP: REVISE THE FLOOD ZONE. BUILDING IS LOCATED | | | IN FLOOD ZONE "A5" NOT "AE". SEC. R322.1. | | | | | | 4- SURVEY SUBMITTED: | | | A) REVISE FLOOD ZONE. BUILDING SI LOCATED IN FLOOD ZONE | | | "A5" NOT "AE". | | | B) NEED SURVEYOR ORIGINAL SIGNATURE, NOT COPY AS | | | REQUIRED BY CHAPTER 472 FLORIDA STATUTE. | | | | | | 5- SHEET #1: A) SPECIFY SIZE OF ROOF DRAINS (SCUPPERS) | | | AND RAIN LEADERS. SEC. 107.2.1 CITY AMENDMENTS TO FBC. | | | | | | B) LOCATION OF ROOF DRAINAGE (SCUPPERS) SHOWN ON THE | | | PROPOSED ROOF FRAMING PLAN IS ON THE OPPOSITE SIDE OF | | | THE ROOF SLOPE SHOWN ON THE PROPOSED ROOF PLAN. REVISE | | | AS REQUIRED TO MATCH. SEC. R903.4. | | | | | | C) NEED TO SPECIFY OVERFLOW SCUPPERS AS REQUIRED BY | | | SEC. R903.4.1 AND SPECIFY SIZE. | | | | | | D) SPECIFY SIZE OF GOOSE-NECK ROOF VENTS. SEC. R806. | | | | | | E) SPECIFY CONNECTORS FOR ROOF TRUSSES. SEC. 107.2.1 | | | CITY AMENDMENTS. | | | | | | 6- SHEET #2: A) PROVIDE SPECIFICATIONS FOR ROOF | | | SHEATHING FASTENING AS REQUIRED BY SEC. R803.2.3.1. | | | SPECIFY 8D RING SHANK NAILS MIN. AND ROOF ZONE TO HAVE | | | 8D RING SHANK NAILS AT 4"O.C. | | | | | | B) PROVIDE COMPLETE SPECIFICATIONS AND DETAILS | | | (INCLUDING SIZES) FOR ALL LINTELS ABOVE WINDOWS AND | | | DOORS. SEC. R606.10 | | | | | | C) CLARIFY WHERE ARE THE RAIN LEADERS LEADING TO. | | | ELEVATIONS SHOW LIKE RAIN LEADERS ARE BURIED. RAIN | | | LEADERS NEED TO DISCHARGE AT LEAST 1 FOOT AWAY FROM | | | WALL. SEE SEC. R318.6 | | | | | | 7- ENGINEER OF RECORD TO UPDATE THE FIRM CERTIFICATE OF | | | AUTHORIZATION #26154 WITH THE FLORIDA DEPARTMENT OF | | | BUSINESS & PROFESSIONAL REGULATION AS REQUIRED BY | | | CHAPTER 471 OF FLORIDA STATUTE. | | | | | | 8- ENERGY CALCULATIONS SUBMITTED: | | | A) NEED TO BE CERTIFIED AND DATED BY THE PERSON WHO | | | PREPARED THEM AT THE BOTTOM OF FORM. | | | | | | B) NEED TO BE CERTIFIED AND DATED BY THE OWNER/AGENT AT | | | THE BOTTOM OF FORM. | | | | | | C) REVISE THE AREA WEIGHTED AVERAGE OVERHANG DEPTH TO | | | MATCH PLANS. DOORS ARE CONSIDERED GLASS ALSO AND THERE | | | IS NO OVERHANG ABOVE DOORS. SEE ELEVATIONS AND PRODUCT | | | APPROVALS SUBMITTED. | | | | | | D) THERE IS NOT KITCHEN IN THIS CABANA. SEE PLANS AND | | | REVISE PAGE 2 OF 5. | | | | | | E) REVISE ROOF MATERIAL SHOWN ON PAGE 2 OF 5 TO MATCH | | | PLANS. FLAT ROOF NOT SHINGLES. | | | | | | F) REVISE DOOR TYPE AND SIZES ON PAGE 3 OF 5 TO MATCH | | | PLANS AND PRODUCT APPROVALS. THERE ARE NO WOOD DOORS. | | | | | | 9- PROVIDE PRODUCT APPROVAL (2 COPIES) AS REQUIRED BY | | | DCA RULE 9N-3 FOR: | | | A) FLAT ROOF ASSEMBLY TO BE INSTALLED. AND, CLEARLY | | | IDENTIFY WHICH APPROVED ASSEMBLY IS GOING TO BE | | | INSTALLED AND PROVIDE SIGNED AND SEALED RAS 117 | | | CALCULATIONS FOR NAIL ENHANCING AT PERIMETER AND CORNER | | | AREAS AS REQUIRED TO MEET THE DESIGN PRESSURES OF SEC. | | | R301. | | | | | | B) ALL STRUCTURAL CONNECTORS (SIMPSON OR USP) SPECIFIED | | | FOR ROOF TRUSSES. ***NOTE; PROVIDE ONLY THE PRODUCT | | | APPROVAL COVER PAGE AND PAGE SHOWING THE SPECIFIED | | | CONNECTOR. | | | | | | 10- ENGINEER OF RECORD TO REVIEW AND APPROVE IN WRITING | | | (NOT SIGNING AND SEALING) ALL PRODUCT APPROVALS AS | | | REQUIRED BY SEC. 107.3.4.1 OF CITY AMENDMENTS. | | | | | | ***NOTE: PROPERTY IS LOCATED IN FLOOD ZONE A5. | | | ELEVATION CERTIFICATES ARE REQUIRED DURING CONSTRUCTION | | | FOR BUILDING AND EQUIPMENT. MIN. FINISH FLOOR ELEVATION | | | REQUIRED IS 7'-6". | | | | | | ***PLEASE PROVIDE RESPONSE LETTER ADDRESSING EACH | | | COMMENT TO EXPEDITE THE REVIEW PROCESS. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE CALL | | | JULIO GOMEZ | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561)805-6712 |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
N |
Date |
2014-01-02 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2014-01-02 |
Time |
15:33 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2013-11-04 |
|
|
Cont ID |
|
| Sent By |
albarran |
Date |
2013-11-04 |
Time |
14:21 |
Rev Time |
0.00 |
| Received By |
albarran |
Date |
2013-11-04 |
Time |
13:38 |
Sent To |
I |
|
| Notes |
| 2013-11-04 14:21:49 | SENT TO SH DESK | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2013-10-16 |
|
|
Cont ID |
|
| Sent By |
dharvey |
Date |
2013-10-16 |
Time |
10:42 |
Rev Time |
0.00 |
| Received By |
dharvey |
Date |
2013-10-16 |
Time |
10:07 |
Sent To |
|
|
| Notes |
| 2013-10-16 11:15:57 | THE FOLLOWING ITEMS SHALL BE ADDRESSED FOR A SUCCESSFUL | | | ELECTRICAL PLANS REVIEW: | | | 1. PROVIDE AN ELECTRICAL RISER DIAGRAM SHOWING PROPER | | | WIRE SIZE AND GROUNDING. | | | 2. INDICATE ON THE DRAWINGS THE LOCATION OF BOTH, THE | | | ELECTRIC METER AND THE ELECTRICAL PANEL. | | | 3. INCLUDE ON THE DRAWING THE LOCATION OF THE REQUIRED | | | SMOKE DETECTORS. | | | 4. THE ELECTRICAL LOAD CALCS DUE SHOW A DRYER, BUT THEY | | | FAIL TO SHOW THE WASHER CIRCUIT OR LOAD. | | | 5. SHOW THE LOCATION OF THE WASHER & DRYER ON THE PLANS | | | 6. LOAD CALCS INDICATE THE LOAD AND CIRCUIT FOUR THE | | | WATER HEATER BUT THE LOCATION OF SAME IS NOT ON THE | | | PLANS. | | | 7. NEC 210.52, REQUIRES THAT EVERY USABLE WALL SPACE | | | GREATER THEN 24" HAVE AN ELECTRICAL OUTLET. | | | | | | SENT BACK TO BIN WAITING FOR CORRECTIONS BY: MA |
|
|
| Review Stop |
HIST |
HISTORICAL |
| Rev No |
2 |
Status |
P |
Date |
2013-10-24 |
|
|
Cont ID |
|
| Sent By |
fmittner |
Date |
2013-10-24 |
Time |
16:43 |
Rev Time |
0.00 |
| Received By |
fmittner |
Date |
2013-10-24 |
Time |
16:43 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
HIST |
HISTORICAL |
| Rev No |
1 |
Status |
P |
Date |
2013-08-28 |
|
|
Cont ID |
|
| Sent By |
fmittner |
Date |
2013-08-28 |
Time |
13:51 |
Rev Time |
0.00 |
| Received By |
fmittner |
Date |
2013-08-28 |
Time |
13:51 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2014-07-23 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2014-01-16 |
Time |
15:07 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2014-01-16 |
Time |
19:39 |
Sent To |
|
|
| Notes |
| 2014-01-16 19:39:44 | SURVEY SUBMITTED | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2014-01-02 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2014-01-02 |
Time |
15:33 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2014-01-02 |
Time |
15:32 |
Sent To |
|
|
| Notes |
| 2014-01-02 15:34:43 | B, E, & I STOPS ENTERED IN ERROR, SEE 14010024. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2013-11-06 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2013-11-06 |
Time |
18:06 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2013-10-18 |
Time |
06:24 |
Sent To |
|
|
| Notes |
| 2013-10-21 13:54:32 | | | | 10/21/13 SENT TO R7 SHELF FOR REVIEW. JG. | | 2013-10-19 06:26:05 | SENT TO J GOMEZ |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2013-10-18 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2013-10-16 |
Time |
10:50 |
Rev Time |
0.00 |
| Received By |
rbrown |
Date |
2013-08-28 |
Time |
14:22 |
Sent To |
|
|
| Notes |
| 2013-08-28 14:26:39 | INCOMING SENT TO R18 . JW |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
2 |
Status |
P |
Date |
2013-10-23 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2013-10-23 |
Time |
18:13 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2013-10-23 |
Time |
18:13 |
Sent To |
|
|
| Notes |
| 2013-10-23 18:14:14 | NO FEES. MU-2013-22438. JG. |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
1 |
Status |
F |
Date |
2013-09-16 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2013-09-16 |
Time |
18:23 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2013-09-16 |
Time |
18:23 |
Sent To |
|
|
| Notes |
| 2013-09-16 18:23:31 | 2- AFTER PLANS ARE REVISED, BRING THEM TO PALM BEACH | | | COUNTY (2300 N. JOG RD.) TO VERIFY IF IMPACT FEES ARE | | | REQUIRED. BRING BACK COUNTY STAMPED PLANS AND COPY OF | | | PAID RECEIPT IF FEES ARE DUE. |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2013-10-24 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2013-10-24 |
Time |
16:20 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2013-10-24 |
Time |
16:20 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2013-09-18 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2013-09-18 |
Time |
08:35 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2013-09-18 |
Time |
08:34 |
Sent To |
|
|
| Notes |
| 2013-09-18 08:36:32 | RESIDENTIAL (R3) ADDITION, MECHANICAL REVIEW COMMENTS. | | | CODE: 2010 FBC. | | | | | | 1- EQUIPMENT SIZING CALCULATIONS TO INCLUDE THE | | | EQUIPMENT MANUFACTURER AND MODEL NUMBER. SEC. 403.6 OF | | | 2010 FBC-ENERGY CONSERVATION. | | | | | | 2- EQUIPMENT INFORMATION TO BE INCLUDED IN THE A/C | | | PLAN. SEC. 107.3.5.3(10) OF CITY AMENDMENTS TO FBC. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE CALL | | | JULIO GOMEZ | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561)805-6712 |
|
|
| Review Stop |
NFIP |
NFIP REVIEW ACTIVITY |
| Rev No |
3 |
Status |
P |
Date |
2014-08-01 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2014-08-01 |
Time |
10:50 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2014-08-01 |
Time |
10:50 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
NFIP |
NFIP REVIEW ACTIVITY |
| Rev No |
2 |
Status |
F |
Date |
2014-07-28 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2014-07-28 |
Time |
10:19 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2014-07-28 |
Time |
10:19 |
Sent To |
|
|
| Notes |
| 2014-07-28 10:27:07 | ****CORRECTIONS**** | | | ****ELEVATION CERTIFICATE PREPARED BY ROBERT A BUGGEE | | | DATED 4/10/14, "FINISHED CONSTRUCTION" **** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | 1. SEE COMMENTS SECTION, PAGE 2. THE COMMENTS STATE (IN | | | PART) "BUILDING UNDER CONSTRUCTION FINISHED FL | | | ELEVATION: 7.70'. MECHANICAL EQUIPMENT NOT INSTALLED." | | | MECHANICAL EQUIPMENT IS TO BE INSTALLED PRIOR TO FINAL | | | EC. | | | | | | 2. AS THIS EC NEEDS TO BE REVISED, PLEASE ALSO CORRECT | | | ITEM B4, WHICH WSHOULD INCLUDE THE MAP NUMBER. THIS | | | COMMENT WAS IN THE EC REVIEW PREVIOUSLY. | | | | | | 3. AS THE EC COMMENTS SECTION NEEDS TO BE REVISED, | | | PLEASE INCLUDE THE INFORMATION AS TO HOW THE LAT/LONG | | | WAS DETERMINED AS PER EC INSTRUCTIONS. | | | |
|
|
| Review Stop |
NFIP |
NFIP REVIEW ACTIVITY |
| Rev No |
1 |
Status |
F |
Date |
2014-07-23 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2014-07-23 |
Time |
14:55 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2014-07-23 |
Time |
14:55 |
Sent To |
|
|
| Notes |
| 2014-07-23 15:07:01 | ****CORRECTIONS**** | | | ****ELEVATION CERTIFICATE PREPARED BY ROBERT A BUGGEE | | | DATED 4/10/14, "FINISHED CONSTRUCTION" **** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | 1. MECHANICAL EQUIPMENT IN SECTION C2 MUST BE 7.5' | | | MINIMUM. NOTE THAT THIS IS TO BE THE ELEVATION OF THE | | | MECHANICAL EQUIPMENT, NOT THE SLAB. IF STANDS ARE | | | PROPOSED, THIS CAN BE EXPLAINED IN THE "COMMENTS" | | | SECTION. | | | | | | THE MECHANICAL EQUIPMENT IS NOTED AS "NA" BUT THE | | | "FINISHED CONSTRUCTION" IS NOT TO BE DONE UNTIL ALL | | | EQUIPMENT IS INSTALLED. PHOTOGRAPHS SHOW AN ELEVATED | | | (ON STAND) A/C UNIT. | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2013-09-18 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2013-09-17 |
Time |
18:45 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2013-09-17 |
Time |
18:36 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
2 |
Status |
P |
Date |
2013-10-24 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2013-10-24 |
Time |
10:25 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2013-10-24 |
Time |
10:25 |
Sent To |
|
|
| Notes |
| 2013-10-24 10:26:32 | FLAT ROOF FL16429 SUBMITTED. JG. |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
1 |
Status |
F |
Date |
2013-09-17 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2013-09-17 |
Time |
18:35 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2013-09-17 |
Time |
18:35 |
Sent To |
|
|
| Notes |
| 2013-09-17 18:36:37 | NEED PRODUCT APPROVAL FOR FLAT ROOF AND RAS 117 | | | CALCULATIONS. JG. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2013-10-24 |
|
|
Cont ID |
|
| Sent By |
fmittner |
Date |
2013-10-24 |
Time |
16:44 |
Rev Time |
0.00 |
| Received By |
fmittner |
Date |
2013-10-24 |
Time |
16:44 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2013-08-28 |
|
|
Cont ID |
|
| Sent By |
fmittner |
Date |
2013-08-28 |
Time |
13:51 |
Rev Time |
0.00 |
| Received By |
fmittner |
Date |
2013-08-28 |
Time |
13:51 |
Sent To |
|
|
| Notes |
|
|