| 2013-08-24 14:41:01 | 1. ELECTRICAL OUTLET SPACING DOES NOT APPEAR TO FULLY |
| | MEET 210.52. RECEPTACLE SPACING TO MEET THE |
| | REQUIREMENTS OF THE NEC AT THE TIME OF INSTALLATION. |
| | ALL UNITS, ALL DESIGNS |
| | 2. SMOKE/CO ALARMS ARE TO BE LOCATED PER MANUFACTURERS |
| | INSTRUCTIONS FOR BEST AND MOST EFFICIENT OPERATION FOR |
| | EARLY WARNING, NOT AS SHOWN ON THE PLANS. ALL UNITS, |
| | ALL DESIGNS |
| | 3. PLEASE INCLUDE PROVISO NOTE FOR EASEMENTS AND THE |
| | REQUIREMENT FOR RECORDING OF UTILITY EASEMENTS: |
| | A. THE LOCATION OF UNDERGROUND ELECTRICAL SERVICES, |
| | FEEDERS, CIRCUITS, ?HOUSE? CIRCUITS, ALL CONDUITS, AND |
| | OTHER APPURTENANCES, ASSOCIATED WITH THE PREMISE SYSTEM |
| | AND INSTALLED AT THE TIME OF THE FORMBOARD SURVEY, |
| | SHALL BE SHOWN ON THE FORMBOARD SURVEY. |
| | B. UTILITY AND PREMISE EASEMENTS, EASEMENT LOCATIONS, |
| | AND ASSOCIATED RESTRICTIVE PROPERTY COVENANTS ARE TO BE |
| | SUBMITTED TO THE BUILDING OFFICIAL FOR REVIEW AND |
| | APPROVAL PRIOR TO RECORDING. SAID DOCUMENTS SHALL BE |
| | RECORDED AND PROOF OF RECORDING ON THE PLAT, AND |
| | ACCEPTANCE BY THE CITY SURVEYOR, SHALL BE PROVIDED |
| | PRIOR TO SCHEDULING OF ELECTRICAL ?ROUGH? INSPECTIONS. |
| | 4. PROVIDE INTERSYSTEM BONDING POINT AT SERVICE PER |
| | 250.94 |
| | 5. PLANS CALL FOR 2011 EDITION OF THE NEC. FLORIDA IS |
| | USING THE 2008 EDITION OF THE NEC AND ALL WORK IS TO |
| | COMPLY WITH THE ADOPTED STANDARDS AND REFERENCED |
| | DOCUMENTS IN ACCORDANCE WITH FLORIDA STATUTE 553. |
| | 6. IDENTIFY UNITS AND SERVICES AT METERS AND |
| | DISCONNECTS. SERVICE MAINS DO NOT APPEAR TO AGREE WITH |
| | SERVICES AND CONDUCTOR SIZES. |
| | 7. LOAD CALCULATION APPEARS TO BE MISSING. METER CENTER |
| | SHOWS A 200A AND ALL LOAD CALCULATIONS APPEAR TO BE FOR |
| | A 125 OR 150A SERVICE. PLEASE EXPLAIN, THIS DOES NOT |
| | APPEAR TO CORRESPOND WITH THE LOAD CALCULATION FOR THE |
| | BUILDING PROVIDED. |
| | 8. ALL CONDUCTORS TO BE SIZED PER NEC 310.15. IF 90 |
| | DEGREE C COLUMN IS TO BE USED, PROVIDE LISTING |
| | INFORMATION FOR ALL CONNECTIONS, CONDUIT AND OTHER |
| | PORTIONS OF THE ELECTRICAL SYSTEM TO ENSURE |
| | COMPATIBILITY. PLAN NOTES CALL FOR 75 DEGREE. |
| | 9. DO SITE LIGHTING CONDUCTORS ACCOUNT FOR VOLTAGE |
| | DROP? FBC-EC 505.2 |
| | 10. NOTE 9 ON THE PLANS CALLS FOR TORQUEING OF ALUMINUM |
| | CONDUCTORS, NEC SECTION 110.13 CALLS FOR PROPER |
| | INSTALLATION OF ALL CONDUCTORS |
| | 11. NOTE 10 CALLS FOR ANTI-OXIDANT AND WIRE BRUSHING OF |
| | AL CONDUCTORS. PLEASE PROVIDE MANUFACTURERS LISTING |
| | INFORMATION CALLING FOR THE PROPER APPLICATION AND |
| | MATERIALS. THIS MAY CONFLICT WITH NOTE 7. |
| | |