| Plan Review Stops For Permit 13070121 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2013-09-18 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2013-09-18 |
Time |
17:47 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2013-09-18 |
Time |
17:47 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2013-07-23 |
|
|
Cont ID |
|
| Sent By |
JGOMEZ |
Date |
2013-07-23 |
Time |
15:41 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2013-07-23 |
Time |
15:41 |
Sent To |
|
|
| Notes |
| 2013-07-23 15:41:54 | REVISION BUILDING REVIEW COMMENTS. | | | CODE: 2010 FBC. | | | | | | (1)- BUILDING REVIEW WAS APPROVED BACK IN 12/14/12 WITH | | | A PROVISO (SEE COPY OF PROVISO BELOW). REVISED PLANS | | | SUBMITTED DON'T ADDRESS THESE ITEMS. NEED TO ADDRESS | | | THEM NOW BEFORE ANY WORK IS DONE. SEC. 107.2.1 CITY | | | AMENDMENTS TO FBC. | | | | | | "BUILDING REVIEW APPROVED WITH PROVISO: | | | 1- SHEET 1.2: | | | A) UTILITY AREA NEW OUTDOOR STEPS: (1) PROVIDE COMPLETE | | | HANDRAILS DETAILS AND SPECIFICATIONS SHOWING COMPLIANCE | | | WITH LIVE LOAD ON TABLE R301.5 AND SEC. R311.7.7 OF | | | 2010 FBC-RESIDENTIAL. ENGINEER PLANS ONLY SAY NEW | | | HANDRAIL DESIGNED BY OTHERS. NO INFORMATION WAS | | | PROVIDED FOR REVIEW. | | | | | | B) NEW STEPS ON REAR SHOWS TREAD SIZE AS 8". MINIMUM | | | TREAD SIZE IS 10". SEE SEC. R311.7.4.2 OF 2010 | | | FBC-RESIDENTIAL AND REVISE AS REQUIRED. | | | | | | | | | ***REVISION COMMENTS: | | | (2) NEED TO ADD THE VALUE THAT REFLECTS THE ADDITIONAL | | | WORK SHOWN ON PLANS. REVISED PLANS SHOW NEW FLOOR | | | FRAMING AND NEW ROOF FRAMING. SEC. 109.3 CITY | | | AMENDMENTS TO FBC. | | | | | | (3) PROVIDE PRODUCT APPROVAL (2 COPIES) AS REQUIRED BY | | | DCA RULE 9N-3 FOR THE NEW SIMPSON STRUCTURAL CONNECTORS | | | SPECIFIED ON REVISED PLANS AND DETAILS. | | | ***NOTE: PROVIDE ONLY THE PRODUCT APPROVAL COVER PAGE | | | AND PAGE SHOWING THE SPECIFIED CONNECTOR | | | | | | ***NOTE: IF DOING ANY ROOFING WORK, THEN SEPARATE | | | ROOFING PERMIT IS REQUIRED. ROOFING CONTRACTOR IS | | | REQUIRED AND PROVIDE COMPLETE INFORMATION FOR SUCH | | | PERMIT. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE CALL | | | JULIO GOMEZ | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561)805-6712 | | | | | | | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2013-09-09 |
|
|
Cont ID |
|
| Sent By |
dharvey |
Date |
2013-09-09 |
Time |
15:12 |
Rev Time |
0.00 |
| Received By |
dharvey |
Date |
2013-09-09 |
Time |
15:12 |
Sent To |
|
|
| Notes |
| 2013-09-09 15:13:05 | SECOND REVIEW - 9-9-13 | | | | | | CORRECTIONS MADE AND DRAWINGS NOTED...... |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2013-08-02 |
|
|
Cont ID |
|
| Sent By |
RLECKY |
Date |
2013-08-02 |
Time |
15:10 |
Rev Time |
0.00 |
| Received By |
dharvey |
Date |
2013-08-02 |
Time |
14:31 |
Sent To |
|
|
| Notes |
| 2013-08-02 15:10:24 | LOCATE SMOKE DETECTORS FOR MOST EFFECTIVE COVERAGE IN | | | THE BEDROOMS AND FOR EARLY DETECTION 110.3 | | | PROVIDE CO DETECTOR PER FBC -R 916.1 | | | PROVIDE INTERSYSTEM BONDING POINT 250.94 | | | PROVIDE FOR BONDING OF INTERIOR METAL GAS PIPE | | | NEW LOAD BEING ADDED (AC), PROVIDE LOAD CALCULATION FOR | | | RECORD TO INDICATE EXISTING SERVICE IS OF SUFFICIENT | | | SIZE | | | ARC FAULT BREAKERS REQUIRED AND TAMPERPROOF RECEPTACLES | | | FOR ANY NEW OR REMODELED ITEMS 210.12, 406.11 | | | |
|
|
| Review Stop |
HIST |
HISTORICAL |
| Rev No |
1 |
Status |
N |
Date |
2013-07-18 |
|
|
Cont ID |
|
| Sent By |
fmittner |
Date |
2013-07-18 |
Time |
09:50 |
Rev Time |
0.00 |
| Received By |
fmittner |
Date |
2013-07-18 |
Time |
09:49 |
Sent To |
|
|
| Notes |
| 2013-07-10 15:12:37 | 7/10/13 |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2013-09-18 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2013-09-18 |
Time |
18:13 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2013-08-13 |
Time |
10:45 |
Sent To |
|
|
| Notes |
| 2013-08-15 10:45:45 | RESUBMITTAL SENT TO R9 SHELF FOR REVIEW. JG. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2013-08-05 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2013-08-05 |
Time |
08:26 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2013-07-03 |
Time |
16:02 |
Sent To |
|
|
| Notes |
| 2013-07-08 16:03:14 | SENT TO R7 SHELF FOR REVIEW. JG. |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2013-09-18 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2013-09-18 |
Time |
18:00 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2013-09-18 |
Time |
18:00 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2013-07-23 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2013-07-23 |
Time |
17:24 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2013-07-23 |
Time |
17:24 |
Sent To |
|
|
| Notes |
| 2013-07-23 17:30:54 | RESIDENTIAL (R3) REVISION, MECHANICAL REVIEW COMMENTS. | | | CODE: 2010 FBC. | | | | | | 1- REVISED M.1 PLAN DOESN'T SHOW TRANSFER DUCT IN THE | | | AIR CONDITIONED PORCH AS REQUIRED BY SEC. M1602.4 OF | | | 2010 FBC-RESIDENTIAL. REVISE AS REQUIRED. ORIGINAL PLAN | | | WAS APPROVED WITH THE TRANSFER DUCT SHOWN IN THIS AREA. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE CALL JULIO GOMEZ | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561)805-6712 |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2013-09-18 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2013-09-18 |
Time |
18:13 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2013-09-18 |
Time |
18:13 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2013-07-23 |
|
|
Cont ID |
|
| Sent By |
JGOMEZ |
Date |
2013-07-23 |
Time |
17:31 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2013-07-23 |
Time |
17:30 |
Sent To |
|
|
| Notes |
| 2013-07-23 17:37:18 | RESIDENTIAL (R3) REVISION, PLUMBING REVIEW COMMENTS. | | | CODE: 2010 FBC. | | | | | | 1- ALL GAS WORK IS REQUIRED TO BE SUBMITTED UNDER A | | | SEPARATE GAS PERMIT. CONTRACTOR TO PROVIDE COMPLETE | | | INFORMATION UNDER A SEPARATE GAS PERMIT. SEC. 105.1 | | | CITY AMENDMENTS TO FBC. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE CALL | | | JULIO GOMEZ | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561)805-6712 |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2013-07-18 |
|
|
Cont ID |
|
| Sent By |
fmittner |
Date |
2013-07-18 |
Time |
09:50 |
Rev Time |
0.00 |
| Received By |
fmittner |
Date |
2013-07-18 |
Time |
09:50 |
Sent To |
|
|
| Notes |
|
|