Plan Review Details - Permit 13060220
Plan Review Stops For Permit 13060220
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2013-08-15 Cont ID  
Sent By jwitmer Date 2013-08-15 Time 10:43 Rev Time 0.00
Received By jwitmer Date 2013-08-15 Time 08:33 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2013-07-12 Cont ID  
Sent By jwitmer Date 2013-07-12 Time 11:25 Rev Time 0.00
Received By jwitmer Date 2013-07-12 Time 09:15 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2013-07-11 Cont ID  
Sent By dharvey Date 2013-07-11 Time 17:32 Rev Time 0.00
Received By dharvey Date 2013-07-11 Time 17:32 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2013-07-02 Cont ID  
Sent By   Date 2013-07-02 Time   Rev Time 0.00
Received By scaldero Date 2013-06-27 Time 14:16 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status P Date 2013-06-21 Cont ID  
Sent By lwagner Date 2013-06-21 Time 14:59 Rev Time 0.00
Received By lwagner Date 2013-06-21 Time 14:59 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date   Cont ID  
Sent By   Date 2013-08-21 Time   Rev Time 0.00
Received By rregueir Date 2013-07-24 Time 17:00 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2013-07-20 Cont ID  
Sent By hmoser Date 2013-07-20 Time 09:28 Rev Time 0.00
Received By hmoser Date 2013-06-06 Time 11:42 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2013-07-20 Cont ID  
Sent By hmoser Date 2013-07-20 Time 09:27 Rev Time 0.00
Received By hmoser Date 2013-07-20 Time 08:15 Sent To  
Notes
2013-07-20 09:27:33REVISION OK
 1) BUILDING J9 PAGE M 216 REVISION 4 TENANT # W 217
 GRILL SIZE AND CFM DID NOT PRINT ON REVISION. HAVE
 GRILL SIZE AND
 CFM ON THE PLANS FOR ROUGH INSPECTION.
 2) BUILDING J10 PAGE M 222 IS THIS REVISION 4 OR 4.1
 PLEASE
 NOTE FOR NEXT REVISION.
 PLAN REVIEW BY HAROLD MOSER
 [email protected]
 OFFICE 561-805-6732
 FAX 561-805-6676

Review Stop P PLUMBING
Rev No 1 Status P Date 2013-06-21 Cont ID  
Sent By lwagner Date 2013-06-21 Time 14:59 Rev Time 0.00
Received By lwagner Date 2013-06-19 Time 12:15 Sent To  
Notes
***NONE***

Review Stop POLICE POLICE
Rev No 1 Status P Date   Cont ID  
Sent By   Date 2013-08-22 Time   Rev Time 0.00
Received By ktucker Date 2013-08-22 Time 11:16 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2013-08-21 Cont ID  
Sent By eschneid Date 2013-08-21 Time 11:04 Rev Time 4.00
Received By eschneid Date 2013-08-20 Time 13:39 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2013-07-12 Cont ID  
Sent By eschnide Date 2013-07-10 Time 08:49 Rev Time 12.00
Received By eschneid Date 2013-07-10 Time 08:49 Sent To  
Notes
2013-07-11 08:33:57FAILED
  
 ALL COMPLIANT PLANS HAVE BEEN STAMPED BY ZONING;
 HOWEVER, NOT ALL THE REVISED PLANS ARE COMPLIANT.
  
 PLEASE PROVIDE WRITTEN RESPONSE TO COMMENTS.
  
 1) NON-COMPLIANCE WITH THE DESIGN GUIDELINES:
  
 A. SHEETS C400, C403, C512, A100, A101, A111 & A200 DO
 NOT SHOW THE EXTENSION OF THE CURBED LANDSCAPE AREA ON
 THE WEST SIDE OF THE TRANSFORMER TO CONFORM WITH THE
 LANDSCAPE REQUIREMENTS ACROSS FROM A SERVICE COURT
 OPENING.
 B. THERE IS NOW A 15 TON RTU BEING PROPOSED FOR THE
 OUTLET CENTER ON BUILDING J-4. PROVIDE AN UPDATED LINE
 OF SIGHT STUDY TO VERIFY THAT THE UNITS ARE SCREENED AS
 REQUIRED BY THE DESIGN GUIDELINES. ADDITIONALLY, PLEASE
 ADD THE SPECIFICATIONS TO THE UNIT TO THE TABLE
 INCLUDED WITH THE COVER SHEET OF THE ORIGINAL LINE OF
 SIGHT STUDY.
 C. THE EASTERNMOST RTU ON BUILDING J7 HAS BEEN
 INCREASED TO 12.5 TONS. PROVIDE AN UPDATED LINE OF
 SIGHT STUDY TO VERIFY THAT THE UNIT IS SCREENED AS
 REQUIRED BY THE DESIGN GUIDELINES.
 D. A NEW SWITCH CABINET IS SHOWN ON SHEET A207. NO
 INFORMATION AS TO THE HEIGHT OF THIS CABINET WAS
 PROVIDED TO VERIFY THAT THE 7 FOOT WALL WILL BE TALL
 ENOUGH TO SCREEN THE EQUIPMENT.
  
 2) INCONSISTENCIES WITH THE LATEST FORMAL SITE PLAN
 (CURRENTLY UNDER REVIEW) WHICH IS TO BE THE PLAN THAT
 INCLUDES ALL OF THE CONSTRUCTION CHANGES TO DATE:
  
 A. SHEETS C400, C401, C402, C510, C511, A100, A101,
 A111, A112, A201, A203 AND A205 SHOW INCORRECT
 LOCATIONS AND/OR NUMBER OF BICYCLE RACKS WHEN COMPARED
 TO THE RECENTLY SUBMITTED FORMAL SITE PLAN REVISIONS.
 B. SHEETS A100, A101, A111, A202 SHOW THE TR/REC AREA
 WITHIN THE BUILDING J3 SERVICE COURT IN A DIFFERENT
 LOCATION THAN THE FORMAL SITE PLAN REVISIONS.
 C. SHEETS A100, A101, A200 AND A300 SHOW DOORWAYS NOT
 SHOWN ON THE FORMAL SITE PLAN REVISIONS.
  
 3) SHEETS A224.1 BUILDING J5 ROOF PLAN SHOWS AN 8.5 TON
 RTU IN THE SAME SPAT THAT SHEET M208 SHOWS A 10 TON
 RTU. ALL PLANS SHALL SHOW THE SAME CONDITIONS.
  
 NOTE - THE CIVIL SHEETS (DRAINAGE PLANS) SHOW MORE THAN
 THE SCOPE OF WORK FOR THE OUTLET BUILDING. THE DRAINAGE
 AND UTILITY PLANS SHALL BE SUBMITTED TO THE ENGINEERING
 SERVICES DEPARTMENT FOR REVIEW.
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446.
2013-06-20 09:20:366/20/13