|
 |
 |
 |
 |
 |
Plan Review Details - Permit 13051078
| Plan Review Stops For Permit 13051078 |
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
P |
Date |
2013-09-10 |
|
|
Cont ID |
|
| Sent By |
dharvey |
Date |
2013-09-10 |
Time |
16:01 |
Rev Time |
0.00 |
| Received By |
dharvey |
Date |
2013-09-10 |
Time |
15:58 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
F |
Date |
2013-08-06 |
|
|
Cont ID |
|
| Sent By |
dharvey |
Date |
2013-08-06 |
Time |
15:42 |
Rev Time |
0.00 |
| Received By |
dharvey |
Date |
2013-08-06 |
Time |
15:22 |
Sent To |
|
|
| Notes |
| 2013-08-06 15:37:44 | POLE ANALYSIS IS NOT SEALED BY A FLORIDA REGISTERED | | | ENGINEER. PROVIDE LISTING INFORMATION FOR LUMINAIRES | | | FROM A RECOGNIZED TESTING LAB. SECURITY CAMERAS REQUIRE | | | A SEPARATE PERMIT. ADDRESS CAMERA WINDLOAD ON POLES | | | THAT WILL HAVE CAMERAS. SECTION 4 APPEARS TO BE THE | | | ONLY SECTION PROVIDED THAT IS RELATED TO SITE LIGHTING. | | | DIFFERENT ENGINEERS HAVE SEALED THE PAGES RELATED TO | | | THE LIGHTING, ATTACHEMENT, WINDLOAD AND BASES. PLEASE | | | PROVIDE CONFIRMATION THE ENGINEERS ARE IN AGREEMENT | | | THAT THE POLE BASE DETAIL WILL PROVIDE THE NEEDED | | | UPLIFT, OVERTURN AND OTHER LOADS ASSOCIATED WITH THE | | | POLES SPECIFIED. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2013-07-01 |
|
|
Cont ID |
|
| Sent By |
dharvey |
Date |
2013-07-01 |
Time |
10:45 |
Rev Time |
0.00 |
| Received By |
dharvey |
Date |
2013-07-01 |
Time |
10:04 |
Sent To |
|
|
| Notes |
| 2013-07-01 10:47:33 | 13051078 | | | 4001 S DIXIE HWY | | | WALGREEN?S SITE LIGHTING | | | | | | PLEASE REVISE THE PLANS IN RESPONSE TO THE FOLLOWING | | | REVIEW COMMENTS. | | | | | | PROVIDE SPECIFICATIONS AND THE LISTING FROM A | | | NATIONALLY RECOGNIZED TESTING LABORATORY (NRTL) FOR THE | | | POLES AND FIXTURES. NEC 110.3 | | | | | | WIND LOAD ENGINEERING FOR THE LIGHT POLES AND FIXTURES | | | NEEDS TO REFERENCE THE ACTUAL FIXTURE TYPE OR MODEL | | | WITH ITS EPA AND ALSO VERIFY THE EXISING FOOTER IS | | | STRUCTURALLY ADEQUATE. FBC 1609.1 | | | | | | ROBERT LECKY | | | ELECTRICAL PLANS REVIEW | | | | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2013-09-10 |
|
|
Cont ID |
|
| Sent By |
dharvey |
Date |
2013-09-10 |
Time |
16:01 |
Rev Time |
0.00 |
| Received By |
dharvey |
Date |
2013-09-05 |
Time |
08:07 |
Sent To |
|
|
| Notes |
| 2013-09-06 08:08:34 | SENT TO ELECTRICAL BOX |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
F |
Date |
2013-08-06 |
|
|
Cont ID |
|
| Sent By |
dharvey |
Date |
2013-08-06 |
Time |
15:46 |
Rev Time |
0.00 |
| Received By |
dharvey |
Date |
2013-08-05 |
Time |
16:44 |
Sent To |
|
|
| Notes |
| 2013-08-06 15:47:02 | FILED UNDER "TBD" DH | | 2013-08-05 16:44:20 | TO ELEC |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2013-07-01 |
|
|
Cont ID |
|
| Sent By |
dharvey |
Date |
2013-07-01 |
Time |
10:47 |
Rev Time |
0.00 |
| Received By |
dharvey |
Date |
2013-07-01 |
Time |
10:47 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2013-06-20 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2013-06-20 |
Time |
16:27 |
Rev Time |
0.25 |
| Received By |
eschneid |
Date |
2013-06-20 |
Time |
16:26 |
Sent To |
|
|
| Notes |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |