| 2013-04-16 07:20:06 | HOLD ON PLANS INDICATES 4X FEE ON PERMITS |
| | |
| | PERMIT INDICATES THIS IS A PRIMARY PERMIT, NO FLOOR |
| | PLAN, EQUIPMENT OR OTHER PERMITS ARE ATTACHED |
| | |
| | PROVIDE ALL LOADS AND LOAD CALCULATIONS FOR THIS |
| | SERVICE OR IDENTIFY AS "CONSTRUCTION AND SECURITY |
| | TEMPORARY" WITH NO OCCUPANCY PERMITTED |
| | |
| | INDICATE THE FAULT CURRENT CAPACITY REQUIRED FOR THE |
| | ELECTRICAL SERVICE AND SWITCH GEAR. NEC 110.9, 110.10 |
| | |
| | OVERCURRENT TO BE INTEGRAL TO SERVICE DISCONNECT OR |
| | IMMEDIATELY ADJACENT, NOT THROUGH A WALL 230.91 |
| | |
| | PROVIDE PROPER DOWNSTREAM RATINGS OF EQUIPMENT IN |
| | ACCORDANCE WITH THE FAULT CURRENT AND/OR PROVIDE PROPER |
| | SERIES RATINGS VALUES 240.4 (B) (C) (F), 240.12 |
| | |
| | AN INTERSYSTEM BONDING STRIP IS REQUIRED AT THE MAIN |
| | SERVICE GROUND. NEC 250.94 |
| | |
| | PROVIDE A SAFETY LABELING SCHEDULE FOR FLASH PROTECTION |
| | AND FOR THE PANEL BOARDS AND MAIN DISCONNECTING MEANS. |
| | NEC 110.22, 110.16, 110.22 |
| | |
| | PROVIDE AND ILLUSTRATE THE SAFE WORKING CLEARANCES AND |
| | DEDICATED WORKING SPACE AT ALL ELECTRICAL PANEL BOARDS |
| | AND TRANSFORMERS. NEC 110.26, 240.24 |
| | |
| | GROUNDING ELECTRODE CONDUCTOR APPEARS TO BE IMPROPERLY |
| | SIZED FOR BONDING OF ALL SYSTEMS AND PROVIDE BONDING OF |
| | ALL SYSTEMS AND BUILDING STEEL, AS APPLICABLE 250.66, |
| | 250.104 |
| | |