| Plan Review Stops For Permit 12120373 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2012-12-18 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2012-12-18 |
Time |
16:52 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2012-12-18 |
Time |
16:52 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2012-12-18 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2012-12-18 |
Time |
16:52 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2012-12-18 |
Time |
16:52 |
Sent To |
|
|
| Notes |
| 2012-12-18 16:57:02 | ELECTRICAL PROVISO | | | | | | 1) EQUIPOTENTIAL BONDING IN ACCORDANCE WITH 2008 NEC | | | ARTICLE 680.26 IS REQUIRED. | | | | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2012-12-19 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2012-12-19 |
Time |
08:47 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2012-12-19 |
Time |
08:47 |
Sent To |
|
|
| Notes |
| 2012-12-19 08:54:57 | PLUMBING PROVISO | | | | | | 1) THE POOL DRAIN IS REQUIRED TO COMPLY WITH 2010 FBCR | | | AND ANSI-APSP SECTION 4.5 WHICH REQUIRES SUBMERGED | | | SUCTION OUTLETS TO BE SINGLE UNBLOCKABLE, DUAL OR THREE | | | OR MORE. ANOTHER OPTION IS TO INSTALL A VACUUM RELEASE | | | SYSTEM AS REQUIRED BY ANSI-APSP SECTION 7 FOR EXISTING | | | POOLS. | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
N |
Date |
2012-12-19 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2012-12-19 |
Time |
08:48 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2012-12-19 |
Time |
08:48 |
Sent To |
|
|
| Notes |
| 2012-12-19 08:49:10 | PASSED PREVIOUSLY UNDER PERMIT #00101382. | | | | | | |
|
|
|