Plan Review Details - Permit 12120073
Plan Review Stops For Permit 12120073
Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2012-12-17 Cont ID  
Sent By mgonzale Date 2012-12-17 Time   Rev Time 1.00
Received By mgonzale Date 2012-12-17 Time   Sent To  
Notes
2012-12-17 10:52:49NO CONFLICT WITH UTILITIES.
  
 6"THICK DRIVEWAY APRON MUST HAVE 3000 PSI
 ALSO 6" THICK SIDEWALK ALONG THE DRIVEABLE PROTION MUST
 BE INSTALLED.
  
 DRIVEWAY MUST NOT POSE A TRIPPING HAZZARD WHEN ABUTTING
 EXISTING PORTION.
 CONTROL JOINT MUST BE PROVIDED BETWEEN EXISTING AND NEW
 CONCRETE.
  
 ANY QUESTIONS CONTACT ME DIRECTLY
 MANNY GONZALEZ
 ENGINEERING PROJECT COOR
 (561) 494-1085

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2012-12-20 Cont ID  
Sent By shill Date 2012-12-20 Time 09:53 Rev Time 0.00
Received By shill Date 2012-12-04 Time 12:27 Sent To  
Notes
2012-12-04 12:27:52SENT TO ZONING BOX

Review Stop Z ZONING
Rev No 1 Status P Date 2012-12-11 Cont ID  
Sent By mdekle Date 2012-12-11 Time   Rev Time  
Received By mdekle Date 2012-12-05 Time   Sent To ENG
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved