Plan Review Details - Permit 12110655
Plan Review Stops For Permit 12110655
Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2013-01-11 Cont ID  
Sent By tgordon Date 2013-01-11 Time 08:51 Rev Time 0.00
Received By tgordon Date 2013-01-08 Time 14:59 Sent To  
Notes
2013-01-08 15:00:38SENT TO TOM'S DESK FOR REVIEW. JG.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2012-12-10 Cont ID  
Sent By lmartine Date 2012-12-10 Time 13:42 Rev Time 0.00
Received By lmartine Date 2012-11-27 Time 07:24 Sent To  
Notes
2012-11-28 07:25:48SENT TO MECHANICAL UNDER $5000 BOX.

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2013-01-11 Cont ID  
Sent By tgordon Date 2013-01-11 Time 08:49 Rev Time 0.00
Received By tgordon Date 2013-01-11 Time 08:49 Sent To  
Notes
2013-01-11 08:51:52PLANS FOR A/C DUCT WORK ONLY, SEPARATE PERMIT FOR 3 TON
 A/C SYSTEM IN FUTURE.

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2012-12-10 Cont ID  
Sent By lmartine Date 2012-12-10 Time 12:36 Rev Time 0.00
Received By lmartine Date 2012-12-10 Time 12:36 Sent To  
Notes
2012-12-10 13:01:25*** CORRECCTIONS NEED FOR MECHANICAL PLANS ***
  
 1) NEED TO SUBMIT COOLING LOAD CALCULATIONS, PER 2007
 FBC/RES.M1401.3.
  
 2) NEED TO SUBMIT DUCT DESIGN CALCULATIONS ( EX. MANUAL
 D CAL'S. OR ), PER 2007 FBC/RES. M1601.1.
  
 3) MECHANICAL PLAN NEEDS TO BE MORE LEGIBLE.
 CONSTRUCTION DOCUMENTS SHALL BE OF SUFFICIENT CLARITY
 TO INDICATE THE LOCATION, NATURE AND EXTENT OF THE WORK
 PROPOSED AND SHOW IN DETAIL THAT IT WILL CONFORM TO THE
 PROVISIONS OF THIS CODE AND RELEVANT LAWS, SEE 2004 WPB
 AMEND. 106.1.2.
  
 4) SHOW A EQUIPMENT SCHEDULE ON MECHANICAL PLAN WITH
 A/C SYSTEM MAKE, SIZE, SEER, TOTAL & SENSIBLE BTU'S,
 AND HEATER SIZE ETC., PER 2004 WPB AMEND. 106.3.5.4
 (10).
  
 5) SHOW "ALL" DUCT SIZES, GRILL SIZES, AND CFM'S OF
 SUPPLY AIR ON MECHANICAL PLAN, PER 2004 WPB AMEND.
 106.3.5.4 (10).
  
 6) NEED TO PROVIDE FOR RETURN AIR IN BOTH BEDROOMS AND
 OFFICE. BALANCED RETURN AIR MAY BE ACHIEVED BY.
 (A) TRANSFER DUCTS MAY ACHIEVE THIS BY INCREASING THE
 RETURN TRANSFER ONE AND ONE HALF TIMES THE CROSS
 SECTIONAL AREA (SQUARE INCHES) OF THE SUPPLY DUCT
 ENTERING THE ROOM OR SPACE IT'S SERVING AND THE DOOR
 HAVING AT LEAST AN UNRESTRICTED 1 INCH UNDERCUT TO
 ACHIEVE PROPER RETURN AIR BALANCE.
 (B) TRANSFER GRILLES SHALL USE 50 SQUARE INCHES (OF
 GRILLE AREA) TO 100 CFM (OF SUPPLY AIR) FOR SIZING
 THROUGH-THE-WALL TRANSFER GRILLES AND USING AN
 UNRESTRICTED 1-INCH UNDERCUTTING OF DOORS TO ACHIEVE
 PROPER RETURN AIR BALANCE.
 (C) HABITABLE ROOMS ONLY SHALL BE REQUIRED TO MEET
 THESE REQUIREMENTS FOR PROPER BALANCED RETURN AIR
 EXCLUDING BATHROOMS, CLOSETS, STORAGE ROOMS AND LAUNDRY
 ROOMS, EXCEPT THAT ALL SUPPLY AIR INTO THE MASTER SUITE
 SHALL BE INCLUDED. PER 2004 FBC/R M1602.4 .
  
 *** MECHANICAL PLAN REVIEW BY: TOM GORDON (HY-BYRD
 INC.)
 *** FOR ASSISTANCE CALL LUIS MARTINEZ (561) 805-6710