Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2012-10-29 Cont ID  
Sent By jwitmer Date 2012-10-29 Time 15:09 Rev Time 0.00
Received By jwitmer Date 2012-10-29 Time 15:09 Sent To  
Notes
2012-10-29 15:09:36NEW C26-004 & C26-005 NEW STEEL LAY OUT SHEETS. JW

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2012-09-25 Cont ID  
Sent By jwitmer Date 2012-09-25 Time 16:22 Rev Time 0.00
Received By jwitmer Date 2012-09-12 Time 13:48 Sent To  
Notes
2012-09-17 14:44:549/12 & 9/13 I SPOKE WITH MICHAEL SANCHEZ IN REGARDS TO
 THE BOILER FOUNDATION PERMIT APPLIED FOR, THE CURRENT
 PLAN DOES NOT PROVIDE ANYMORE THAN A OUTLINE OF THE
 FORMWORK, PLANS DO NOT PROVIDE A CUT SECTION PROVIDING
 THE HEIGHT OF THE FOUNDATION. PLANS ARE LACKING
 INFORMATION ON STEEL SIZE, PLACEMENT AND TYPE OF
 CONCRETE MIX TO BE PLACED WITHIN THE FORMWORK.
  
 PLEASE NOTE, THE PILING PLAN 300-C21-001 & 002 HAD
 THREE AREAS THAT HAD A HOLD ON THE PILING PLACEMENT
 BETWEEN GRID LINES 11-12, 13-14 & 15-16 AT GRIG LINES
 H-K. TO DATE NO PLANS WERE SUBMITTED TO THE BUILDING
 DEPARTMENT FOR THESE AREAS.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2012-10-29 Cont ID  
Sent By jwitmer Date 2012-10-29 Time 15:14 Rev Time 0.00
Received By jwitmer Date 2012-10-17 Time 15:43 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2012-09-25 Cont ID  
Sent By jwitmer Date 2012-09-25 Time 16:22 Rev Time 0.00
Received By jwitmer Date 2012-09-12 Time 10:21 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2012-09-13 Cont ID  
Sent By eschneid Date 2012-09-13 Time 16:40 Rev Time 0.25
Received By eschneid Date 2012-09-13 Time 16:40 Sent To  
Notes
***NONE***