Plan Review Details - Permit 12080927
Plan Review Stops For Permit 12080927
Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2012-12-04 Cont ID  
Sent By jgomez Date 2012-12-04 Time 15:52 Rev Time 0.00
Received By jgomez Date 2012-12-04 Time 15:52 Sent To  
Notes
2012-12-04 16:14:18NOA'S SUBMITTALS. JG.

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2012-11-21 Cont ID  
Sent By jgomez Date 2012-11-21 Time 16:48 Rev Time 0.00
Received By jgomez Date 2012-11-21 Time 16:48 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2012-11-20 Cont ID  
Sent By jgomez Date 2012-11-20 Time 10:30 Rev Time 0.00
Received By jgomez Date 2012-11-20 Time 10:30 Sent To  
Notes
2012-11-20 10:32:09BUILDING REVIEW APPROVED WITH PROVISO:
  
 1- PROVIDE PRODUCT APPROVAL (2 COPIES) AS REQUIRED BY
 DCA RULE 9N-3 FOR:
 A) GARAGE DOOR SIZE AS SHOWN ON PLANS. NOA 12-0228.14
 SUBMITTED IS FOR 16'-0" WIDE DOORS.
 B) IMPACT SINGLE HUNG WINDOWS. NOA 11-0405.10 SUBMITTED
 WAS SUPERSEDED BY MIAMI-DADE. NEED CURRENT NOA.
 2- ENGINEER OF RECORD TO REVIEW PRODUCT APPROVALS. SEC.
 107.3.4.1 CITY AMENDMENTS.
 *NOTE; GET HISTORIC APPROVAL ON PRODUCT APPROVALS PRIOR
 TO SUBMITTAL TO THIS OFFICE

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2012-09-28 Cont ID  
Sent By jgomez Date 2012-09-28 Time 16:12 Rev Time 0.00
Received By jgomez Date 2012-09-28 Time 11:19 Sent To  
Notes
2012-09-28 16:43:39RESIDENTIAL (R3) ALTERATION/RENOVATION BUILDING REVIEW
 COMMENTS.
 CODE: 2010 FBC.
  
 1- PROVIDE PRODUCT APPROVAL (2 COPIES) AS REQUIRED BY
 DCA RULE 9N-3 FOR:
 A) ROOFING CONTRACTOR APPLIED FOR A ROOFING PERMIT.
 NEED PRODUCT APPROVAL FOR THE FLAT ROOF. AND, CLEARLY
 SPECIFY WHICH APPROVED ASSEMBLY IS GOING TO BE
 INSTALLED. ALSO, PROVIDE RAS 117 CALCULATIONS AS
 REQUIRED BY GENERAL LIMITATION #7 TO MEET THE DESIGN
 PRESSURES REQUIRED BY SEC. R301.2.1.4.3 OF 2010
 FBC-RESIDENTIAL. SEE LAST PAGE OF NOA. IF GENERAL
 LIMITATION #7 REQUIRES SIGNED AND SEALED RAS 117
 CALCULATIONS. THEN, NEED TO PROVIDE SIGNED AND SEALED
 RAS 117 CALCULATIONS.
  
 B) ALL SIMPSON STRUCTURAL CONNECTORS SPECIFIED BY THE
 ENGINEER ON ALL DETAILS AND WALL SECTIONS. PROVIDE ONLY
 THE PRODUCT APPROVAL COVER PAGE AND PAGE SHOWING THE
 SPECIFIED CONNECTOR.
  
 2- ENGINEER OF RECORD TO REVIEW AND APPROVE ALL PRODUCT
 APPROVALS AS REQUIRED BY SEC. 107.3.4.1 CITY AMENDMENTS
 TO FBC.
  
 3- SHOW COMPLIANCE WITH THE EGRESS REQUIREMENTS
 REQUIRED BY SEC. R310 FOR SECOND FLOOR BEDROOM WINDOW.
 WINDOW SPECIFIED IS S.H. 34" X 53". THIS WINDOW SIZE IS
 NOT SHOWN ON THE WINDOW PRODUCT APPROVAL SUBMITTED. IS
 THIS A CUSTOM SIZED WINDOW?. PROVIDE MANUFACTURER'S CUT
 SHEETS SHOWING COMPLIANCE WITH THE EGRESS OPENINGS
 (HEIGHT, WIDTH AND TOTAL MINIMUM OPENING AREA OF
 5.7S.F.).
  
 4- ACCORDING TO SEC. R301.2.1.4.3 THIS BUILDING IS
 LOCATED ON EXPOSURE "C" NOT "B". REVISE DESIGN
 PARAMETERS ON SHEET A-1 AND DOORS AND WINDOWS DESIGN
 PRESSURES ON SHEET A-2 AS REQUIRED. OR ENGINEER MAY
 SPECIFY AN INTERMEDIATE EXPOSURE BY PROVIDING A
 COMPLETE RATIONAL ANALYSIS AS ALLOWED BY THE EXCEPTION
 ON SEC. R301.2.1.4.
  
 5- PROVIDE COMPLETE DETAILS AND SPECIFICATIONS FOR
 DWELLING/GARAGE FIRE SEPARATION AS REQUIRED BY TABLE
 R302.6.
  
 6- SHEET A-1:
 A) REVISE ROOF SHEATHING NOTE SHOWN ON THE GENERAL
 CONSTRUCTION NOTES. ROOF ZONE #3 REQUIRES 8D RING SHANK
 NAILS AT 4" O.C. AS REQUIRED BY SEC. R803.2.3.1.
  
 B) REVISE STAIR SPECIFICATIONS TO COMPLY WITH SEC.
 R311.7.4. THE NOSING IS NOT OPTIONAL. SEE SEC.
 R311.7.4.2 TO SEE HOW THE TREAD IS MEASURED AND REVISE
 AS REQUIRED.
  
 C) REVISE DESIGN PARAMETERS. THIS IS NOT ALTERATION
 LEVEL I. SEE SEC. 405 OF 2010 FBC-EXISTING BUILDING AND
 REVISE AS REQUIRED.
  
 7- SHEET A-2: REVISE DESIGN PRESSURES FOR THE GARAGE
 DOORS. PROVIDE DESIGN PRESSURES FOR GARAGE DOOR SIZE AS
 SHOWN ON PLANS. PROVIDE DESIGN PRESSURES AS REQUIRED BY
 SEC. R301.2.1.4.3.
  
 8- SHEET S-1:
 A) REVISE STAIR SPECIFICATIONS. SEE ITEM #7(B) ABOVE.
  
 B) PROVIDE COMPLETE DETAIL/SPECIFICATIONS FOR THE
 CONSTRUCTION OF THE RAILING/GUARDRAIL TO SHOW
 COMPLIANCE WITH TABLE R301.5.
  
 C) PROVIDE COMPLETE SPECIFICATIONS FOR THE TYPE AND
 NUMBER OF SCREWS FOR THE 2X WOOD DECK AND THE 2X4
 LEDGERS RECEIVING THE STAIR STRINGERS. SEC. 107.2.1
 CITY AMENDMENTS TO FBC.
  
 D) PROVIDE MANUFACTURER SPECIFICATIONS FOR RIGID 3/4"
 FOAM INSULATION SHOWING COMPLIANCE WITH THE R-19 VALUE
 SPECIFIED ON WALL SECTION 2/S-2. SEC. 107.2.1 CITY
 AMENDMENTS.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CALL
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561)805-6712

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2012-11-20 Cont ID  
Sent By rlecky Date 2012-11-20 Time 16:05 Rev Time 0.00
Received By rlecky Date 2012-11-20 Time 16:02 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2012-09-18 Cont ID  
Sent By rlecky Date 2012-09-18 Time 09:21 Rev Time 0.00
Received By rlecky Date 2012-09-18 Time 08:23 Sent To  
Notes
2012-09-18 09:21:38THE FOLLOWING ELECTRICAL CODE REQUIREMENTS HAVE BEEN
 NOTED ON THE PLAN.
  
 A CARBON MONOXIDE DETECTOR IS REQUIRED WITHIN TEN FEET
 OF EACH ROOM USED FOR SLEEPING. 2010 FBC R314, 315
 THE NEW BATHROOM REQUIRES A DEDICATED 20 AMP BRANCH
 CIRCUIT. NEC 210.11 (C) (3)
  
 ROBERT LECKY
 ELECTRIC PLANS EXAMINER
 [email protected]
 561-805-6718
  

Review Stop HIST HISTORICAL
Rev No 3 Status P Date 2012-12-05 Cont ID  
Sent By fmittner Date 2012-12-05 Time 14:20 Rev Time 0.00
Received By fmittner Date 2012-12-05 Time 14:20 Sent To  
Notes
***NONE***

Review Stop HIST HISTORICAL
Rev No 2 Status P Date 2012-11-06 Cont ID  
Sent By fmittner Date 2012-11-06 Time 14:36 Rev Time 0.00
Received By fmittner Date 2012-11-06 Time 14:36 Sent To  
Notes
2012-11-06 14:42:04APPROVED. PUT BACK IN R-13.
2012-10-31 10:04:00NEW SHEETS SUBMITTED. NEED RE-STAMP. JG.

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2012-09-05 Cont ID  
Sent By fmittner Date 2012-09-05 Time 15:52 Rev Time 0.00
Received By fmittner Date 2012-09-05 Time 15:52 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2012-12-04 Cont ID  
Sent By jgomez Date 2012-12-04 Time 16:03 Rev Time 0.00
Received By jgomez Date 2012-11-29 Time 16:27 Sent To  
Notes
2012-11-29 16:27:36TO JG

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2012-11-21 Cont ID  
Sent By jgomez Date 2012-11-21 Time 16:47 Rev Time 0.00
Received By jgomez Date 2012-11-21 Time 16:46 Sent To  
Notes
2012-11-21 16:47:21GARAGE DOOR AND SH WINDOWS NOA'S E-MAILED BY
 CONTRACTOR. JG.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2012-11-20 Cont ID  
Sent By rlecky Date 2012-11-20 Time 16:05 Rev Time 0.00
Received By rlecky Date 2012-10-30 Time 09:56 Sent To  
Notes
2012-10-31 09:57:16SENT TO R13 SHELF FOR REVIEW. NEW SHEETS SUBMITTED NEED
 ZONING/HISTORIC AND ELECTRICAL RE-STAMP. JG.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2012-09-28 Cont ID  
Sent By jgomez Date 2012-09-28 Time 16:52 Rev Time 0.00
Received By jgomez Date 2012-08-28 Time 16:11 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2012-12-04 Cont ID  
Sent By jgomez Date 2012-12-04 Time 16:34 Rev Time 0.00
Received By jgomez Date 2012-12-04 Time 16:21 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2012-11-21 Cont ID  
Sent By jgomez Date 2012-11-21 Time 13:54 Rev Time 0.00
Received By jgomez Date 2012-11-21 Time 16:51 Sent To  
Notes
2012-11-21 16:53:1111/21/12 TALKED TO MICHAEL ODUM. HE PREFERS TO HAVE THE
 A/C INFORMATION SUBMITTED BEFORE ISSUING PERMIT. NO
 PROVISO. JG.
2012-11-20 13:55:291- PROVIDE COMPLETE A/C INFORMATION. EQUIPMENT SIZING
 CALCULATIONS TO HAVE EQUIPMENT MANUFACTURER AND MODEL
 ON CALCULATIONS. EQUIPMENT TO MATCH EQUIPMENT SHOWN ON
 PLANS. AND, A/C CONTRACTOR RESPONSIBLE FOR THE DESIGN
 TO HAVE NAME AND SIGNATURE ON PLANS.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CALL
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561)805-6712

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2012-09-28 Cont ID  
Sent By jgomez Date 2012-09-28 Time 16:46 Rev Time 0.00
Received By jgomez Date 2012-09-28 Time 16:46 Sent To  
Notes
2012-09-28 16:52:16RESIDENTIAL (R3) ALTERATION/RENOVATION MECHANICAL
 REVIEW COMMENTS.
 CODE: 2010 FBC.
  
 1- PROVIDE A/C EQUIPMENT SIZING CALCULATIONS. SEC.
 403.2.5 OF 2010 FBC-ENERGY CONSERVATION.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CALL
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561)805-6712
  

Review Stop P PLUMBING
Rev No 2 Status P Date 2012-11-20 Cont ID  
Sent By jgomez Date 2012-11-20 Time 13:45 Rev Time 0.00
Received By jgomez Date 2012-11-20 Time 13:45 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2012-09-28 Cont ID  
Sent By jgomez Date 2012-09-28 Time 16:44 Rev Time 0.00
Received By jgomez Date 2012-09-28 Time 16:44 Sent To  
Notes
2012-09-28 16:46:14RESIDENTIAL (R3) ALTERATION/RENOVATION PLUMBING REVIEW
 COMMENTS.
 CODE: 2010 FBC.
  
 1- WASHER DRAIN AND LAVATORY CAN'T BE ON THE SAME STACK
 AS SHOWN ON THE PLUMBING RISER DIAGRAM. SEE SEC.
 P3005.1.1 AND REVISE AS REQUIRED.
  
 2- CLEAN OUT IS NOT SHOWN PROPERLY. SEE SEC. P3005.2.6
 AND REVISE AS REQUIRED.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CALL
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561)805-6712

Review Stop Z ZONING
Rev No 2 Status P Date 2012-11-06 Cont ID  
Sent By fmittner Date 2012-11-06 Time 14:35 Rev Time 0.00
Received By fmittner Date 2012-11-06 Time 14:35 Sent To  
Notes
2012-10-31 10:04:38NEW SHEETS SUBMITTED. NEED RE-STAMP. JG.

Review Stop Z ZONING
Rev No 1 Status P Date 2012-09-05 Cont ID  
Sent By fmittner Date 2012-09-05 Time 15:52 Rev Time 0.00
Received By fmittner Date 2012-09-05 Time 15:52 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy