Plan Review Details - Permit 12080919
Plan Review Stops For Permit 12080919
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2013-01-23 Cont ID  
Sent By rmcdouga Date 2013-01-23 Time 10:05 Rev Time 0.00
Received By rmcdouga Date 2013-01-23 Time 10:04 Sent To  
Notes
2013-01-23 10:04:552010 FBC
  
 1) THE VALUE ON THE APPLICATION FOR THE SCOPE OF WORK
 SHOWN ON THE PLANS IS LOW. THE VALUE OF THE WORK FOR
 PERMITTING PURPOSES IS TO INCLUDE THE TOTAL COSTS OF
 MATERIALS, LABOR, OVERHEAD AND PROFIT AS WOULD BE
 CHARGED BY A CONTRACTOR. CITY AMENDMENTS 109.3 THE
 VALUE OF THE WORK HAS BEEN INCREASED FROM $1150.00 TO
 $2500.00 BASED ON THE MARSHALL AND SWIFT CONSTRUCTION
 COSTS GUIDE BOOK.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2012-10-03 Cont ID  
Sent By rmcdouga Date 2012-10-03 Time 11:24 Rev Time 0.00
Received By rmcdouga Date 2012-10-03 Time 11:24 Sent To  
Notes
2012-10-03 12:00:412010 FBC
  
 1) THE VALUE ON THE APPLICATION FOR THE SCOPE OF WORK
 SHOWN ON THE PLANS IS LOW. THE VALUE OF THE WORK FOR
 PERMITTING PURPOSES IS TO INCLUDE THE TOTAL COSTS OF
 MATERIALS, LABOR, OVERHEAD AND PROFIT AS WOULD BE
 CHARGED BY A CONTRACTOR. PROVIDE AN ACCURATE VALUE FOR
 THE PROPOSED WORK. CITY AMENDMENTS 109.3
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2012-09-04 Cont ID  
Sent By rlecky Date 2012-09-04 Time 12:30 Rev Time 0.00
Received By rlecky Date 2012-09-04 Time 12:26 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2013-01-23 Cont ID  
Sent By rmcdouga Date 2013-01-23 Time 10:05 Rev Time 0.00
Received By rmcdouga Date 2013-01-17 Time 13:48 Sent To  
Notes
2013-01-17 13:48:27GAVE TO MCDOUGAL

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2012-10-03 Cont ID  
Sent By rmcdouga Date 2012-10-03 Time 11:39 Rev Time 0.00
Received By rmcdouga Date 2012-08-29 Time 17:05 Sent To  
Notes
2012-08-29 17:05:51R--6

Review Stop M MECHANICAL (A/C)
Rev No 3 Status N Date 2013-07-26 Cont ID  
Sent By rmcdouga Date 2013-07-26 Time 15:09 Rev Time 0.00
Received By rmcdouga Date 2013-07-26 Time 15:09 Sent To  
Notes
2013-07-26 15:10:38MECHANICAL WORK TO BE DONE UNDER PERMIT # 13050221.
 ALSO SEE REVISION #13060981.

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2013-01-23 Cont ID  
Sent By rmcdouga Date 2013-01-23 Time 09:48 Rev Time 0.00
Received By rmcdouga Date 2013-01-23 Time 09:48 Sent To  
Notes
2013-01-23 09:48:132010 FBC
  
 DENIED BY MECHANICAL
  
 1) SUBMIT TWO SETS OF EQUIPMENT SIZING CALCULATIONS AS
 REQUIRED BY FBCR M1401.3 (REPEAT COMMENT)
  
 2) SUBMIT TWO SETS OF MECHANICAL PLANS WITH THE
 LOCATIONS AND SIZES OF ALL SUPPLY AND RETURN DUCTS
 SPECIFIED. SPECIFY THE GRILL SIZES FOR THE SUPPLIES AND
 RETURNS AND THE CFMS FOR EACH OF THE SUPPLY OUTLETS.
 CITY AMENDMENTS 107.3.5.3 (REPEAT COMMENT)
  
 3) PROVIDE AN EQUIPMENT SCHEDULE ON THE PLANS THAT IS
 COORDINATED WITH THE SIZING CALCULATIONS. FBCR M1401.3
 (REPEAT COMMENT)
  
 4) SHOW COMPLIANCE WITH FBCR M1602.4 FOR BALANCED
 RETURN AIR REQUIREMENTS ON THE PLANS. (REPEAT COMMENT)
  
 5) SPECIFY THE NAME AND LICENSE NUMBER OF THE PERSON
 RESPOSIBLE FOR THE DESIGN OF THE HVAC SYSTEM ON THE
 PLANS. CITY AMENDMENTS 107.3.4 AND FBC FS481.229 &
 471.003 (NEW COMMENT)
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2012-10-03 Cont ID  
Sent By rmcdouga Date 2012-10-03 Time 11:38 Rev Time 0.00
Received By rmcdouga Date 2012-10-03 Time 11:38 Sent To  
Notes
2012-10-03 13:20:332010 FBC
  
 DENIED BY MECHANICAL
  
 1) SUBMIT TWO SETS OF EQUIPMENT SIZING CALCULATIONS AS
 REQUIRED BY FBCR M1401.3
  
 2) SUBMIT TWO SETS OF MECHANICAL PLANS WITH THE
 LOCATIONS AND SIZES OF ALL SUPPLY AND RETURN DUCTS
 SPECIFIED. SPECIFY THE GRILL SIZES FOR THE SUPPLIES AND
 RETURNS AND THE CFMS FOR EACH OF THE SUPPLY OUTLETS.
 CITY AMENDMENTS 107.3.5.3
  
 3) PROVIDE AN EQUIPMENT SCHEDULE ON THE PLANS THAT IS
 COORDINATED WITH THE SIZING CALCULATIONS. FBCR M1401.3
  
 4) SHOW COMPLIANCE WITH FBCR M1602.4 FOR BALANCED
 RETURN AIR REQUIREMENTS ON THE PLANS.
  
 5) SHOW THE LOCATION OF ALL HVAC EQUIPMENT ON THE
 PLANS. CITY AMENDMENTS 107.2.1
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]

Review Stop Z ZONING
Rev No 1 Status P Date 2012-09-04 Cont ID  
Sent By mdekle Date 2012-09-04 Time   Rev Time 0.00
Received By mdekle Date 2012-09-04 Time 13:46 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy