| Plan Review Stops For Permit 12080300 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2012-12-05 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2012-12-05 |
Time |
14:36 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2012-12-05 |
Time |
14:36 |
Sent To |
Z |
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2012-10-18 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2012-10-18 |
Time |
16:12 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2012-10-18 |
Time |
16:12 |
Sent To |
|
|
| Notes |
| 2012-10-18 16:12:51 | ****CORRECTIONS**** | | | SAMANTHA HILL, BUILDING PLANS EXAMINER | | | 561-805-6724 [email protected] | | | FBC FLORIDA BUILDING CODE 2010 | | | FBC R FLORIDA BUILDING CODE 2010 RESIDENTIAL | | | | | | 1. IT APPEARS THAT THE ACCESSIBLE ROUTE SHOWN ON THE | | | PLAN IS THROUGH THE DRIVEWAY. ALSO, SEE 502.3.4, ACCESS | | | AISLE ENCROACHES THE VEHICULAR WAY DUE TO THE LENGTH OF | | | THE ACCESSIBLE SPACE AND ACCESS AISLE. | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2012-08-29 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2012-08-29 |
Time |
14:03 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2012-08-29 |
Time |
14:03 |
Sent To |
|
|
| Notes |
| 2012-08-29 14:08:46 | ****CORRECTIONS**** | | | SAMANTHA HILL, BUILDING PLANS EXAMINER | | | 561-805-6724 [email protected] | | | FBC FLORIDA BUILDING CODE 2010 | | | FBC R FLORIDA BUILDING CODE 2010 RESIDENTIAL | | | | | | THE PLAN PROVIDED (AN AERIAL OF THE PARKING LOT) HAS | | | BEEN ISSUED WITH THE LANDSCAPE PERMIT. PLEASE PROVIDE | | | THE FOLLOWING, TWO SETS: | | | | | | 1. PROVIDE A LEGIBLE PLAN WHICH SHOWS THE FOLLOWING | | | INFORMATION: | | | | | | TOTAL NUMBER OF PARKING SPACES | | | NUMBER OF ACCESSIBLE SPACES | | | LOCATION OF ACCESSIBLE ENTRANCES | | | LOCATION OF ACCESSIBLE SPACES AND ACCESS AISLES | | | SHOW ACCESSIBLE ROUTE FROM PUBLIC WAY | | | ACCESSIBLE ROUTE FROM ACCESSIBLE SPACE TO ACCESSIBLE | | | ENTRANCE | | | | | | SEE FBC 2010 ACCESSIBLITY 202.3 (ALTERATIONS), 208.2 | | | (PARKING SPACES), 502 (PARKING SPACES), 206 (ACCESSIBLE | | | ROUTE). | | | | | | YOU MAY FIND THE FOLLOWING DOCUMENT USEFUL, | | | PARTICULARLY THE INTRODUCTION: "WHEN A BUSINESS | | | RESTRIPES A PARKING LOT, IT MUST PROVIDE ACCESSIBLE | | | PARKING SPACES AS REQUIRED BY THE ADA STANDARDS FOR | | | ACCESSIBLE DESIGN." | | | | | | HTTP://WWW.ADA.GOV/RESTRIPE.HTM | | | | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2012-12-12 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2012-12-12 |
Time |
13:08 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2012-11-21 |
Time |
11:01 |
Sent To |
|
|
| Notes |
| 2012-11-26 11:02:17 | SENT TO SAMANTHA'S DESK FOR REVIEW. JG. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2012-10-18 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2012-10-18 |
Time |
16:16 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2012-10-04 |
Time |
15:31 |
Sent To |
|
|
| Notes |
| 2012-10-04 15:32:06 | GAVE TO SAMANTHA |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2012-08-29 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2012-08-29 |
Time |
14:08 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2012-08-09 |
Time |
17:36 |
Sent To |
|
|
| Notes |
| 2012-08-09 17:36:50 | IN ZONING BOX |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
P |
Date |
2012-12-12 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
2012-12-12 |
Time |
10:46 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
2012-12-11 |
Time |
08:51 |
Sent To |
|
|
| Notes |
| 2012-12-12 10:46:53 | LOT GRANDFATHERED- STALLS DIMENSIONS TO MEET CURRENT | | | CODE REGS. | | 2012-12-11 08:51:53 | GAVE TO A.M.A. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2012-10-12 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
2012-10-12 |
Time |
13:36 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
2012-10-12 |
Time |
13:36 |
Sent To |
|
|
| Notes |
| 2012-10-12 13:43:32 | PROVISO: STALL PAINTING DETAIL SHALL MEET CITY | | | STANDARDS (DOUBLE WHITE LINES- SEC 94-485) |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2012-08-16 |
|
|
Cont ID |
|
| Sent By |
mdekle |
Date |
2012-08-16 |
Time |
|
Rev Time |
|
| Received By |
mdekle |
Date |
2012-08-16 |
Time |
|
Sent To |
|
|
| Notes |
| 2012-08-16 16:25:39 | APPROVED PER A.V. - MD |
|
|