| Plan Review Stops For Permit 12080296 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
P |
Date |
2014-02-07 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2014-02-07 |
Time |
18:16 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2014-02-07 |
Time |
18:16 |
Sent To |
|
|
| Notes |
| 2014-02-07 18:52:17 | ELEVATION CERTIFICATE OK | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2012-10-03 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2012-10-03 |
Time |
08:18 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2012-10-02 |
Time |
17:38 |
Sent To |
|
|
| Notes |
| 2012-10-03 08:32:54 | SUBMIT ELEVATION CERTIFICATE |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2012-09-24 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2012-09-24 |
Time |
16:36 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2012-09-21 |
Time |
15:26 |
Sent To |
|
|
| Notes |
| 2012-09-24 16:36:48 | 2010 FBC | | | | | | DENIED BY BUILDING | | | | | | 1) THE PRODUCT APPROVALS THAT WERE SUBMITTED FOR THE | | | ALUMINUM METAL ROOF FL#5286.1 IS FOR THE 2007 FBC AND | | | HAS A MAXIMUM DESIGN UPLIFT PRESSURE OF -69.25 PSF | | | WHICH IS TOO LOW FOR A STRUCTURE WITH A 4/12 SLOPE ROOF | | | AND A 20 ' PLUS MEAN ROOF HEIGHT LOCATED IN EXPOSURE | | | CATEGORY D WITH A 170 MPH WINDSPEED ( VULT 170 MPH/ | | | VASD 132 MPH) . ALSO THE PLANS SPECIFY THIS AS A COPPER | | | ROOF. PLEASE PROVIDE THE APPROPRIATE PRODUCT APPROVALS. | | | DCA RULE 9N-3 AND FBC R301.2.1 | | | | | | 2) SUBMIT TWO COPIES OF EVALUATION REPORTS FOR THE | | | SPRAY FOAM INSULATION THAT WILL BE INSTALLED. | | | | | | 3) SPECIFY THE METHOD OF ATTACHMENT LISTED IN THE | | | CEMENT ROOF TILE PRODUCT APPROVAL THAT WILL BE USED TO | | | INSTALL THE ROOF TILE AND RESIST THE OVERTURN MOMENT. | | | FBC R 301.2.1 AND FBC R905.3 | | | | | | 4) SUBMIT TWO COPIES OF SIGNED AND SEALED RAS 117 | | | CALCULATIONS FOR ENHANCED FASTENING OF THE CORNER AND | | | PERIMETER AREAS AS REQUIRED BY LIMITATION #7 OF THE | | | PRODUCT APPROVAL FOR THE GAF MODIFIED ROOF SYSTEM WITH | | | THE -52.5 PSF DESIGN PRESSURE. | | | | | | ROBERT MCDOUGAL | | | BLDG. PLAN REVIEW | | | (561)805-6714 | | | [email protected] |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2012-08-16 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2012-08-16 |
Time |
08:54 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2012-08-15 |
Time |
07:45 |
Sent To |
|
|
| Notes |
| 2012-08-16 08:07:50 | 2010 FBC | | | | | | DENIED BY BUILDING | | | | | | 1) THE STRUCTURE IS LOCATED IN AN A5 FLOOD ZONE WHICH | | | REQUIRES THE LOWEST FINISHED FLOOR TO HAVE A MINIMUM | | | ELEVATION OF 7'6" BASE FLOOD ELEVATION. THIS INCLUDES | | | THE 6" FREEBOARD ESTABLISHED BY THE CITY OF WEST PALM | | | BEACH'S FLOOD ORDINANCE. SPECIFY THE FINISH FLOOR | | | ELEVATIONS FOR THE EXISTING STRUCTURE AND THE PROPOSED | | | ADDITION ON THE PLANS AND SUBMIT A ELEVATION | | | CERTIFICATE FOR THE PROPOSED ADDITION. WPB CODE OF | | | ORDINANCES CHAPTER 94, ARTICLE XVII SECTIONS 94-541 | | | THRU 94-547. | | | | | | 2) ON SHEET A-1 THE COVERED ENTRY IS MISLABELED AS | | | BEDROOM #2. PLEASE CORRECT. CITY AMENDMENTS 107.2.1 | | | | | | 3) THE PROJECT IS LOCATED IN AN AREA OF QUESTIONABLE | | | SOIL. SUBMIT TWO SIGNED AND SEALED COPIES OF A | | | SUBSURFACE SOILS REPORT FOR THE PROJECT. FBC R401.4 | | | | | | 4) SUBMIT TWO SETS OF ENERGY CALCULATIONS SIGNED BY THE | | | PREPARER AND THE OWNER/AGENT FOR THE ADDED AREAS OF | | | CONDITIONED SPACE AS REQUIRED BY 2010 FBC ENERGY | | | CONSERVATION SECTION 402. | | | | | | 5) THE PLANS SPECIFY "POLYISOCENE" INSULATION. DO YOU | | | MEAN "POLYICYNENE" SPRAY FOAM INSULATION? SUBMIT TWO | | | SETS OF THE EVALUATION REPORTS FOR THE SPRAY FOAM | | | INSULATION AND SPECIFY THAT THE ATTIC IS UNVENTED ON | | | THE PLANS. FBC R316 | | | | | | 6) THE BALCONY GUARDS ARE SPECIFIED AS 32" IN HEIGHT. | | | FBC R 312.2 REQUIRES THE GUARDS TO BE A MINIMUM OF 36" | | | ABOVE THE WALKING SURFACE. PLEASE CORRECT. | | | | | | 7) SHOW COMPLIANCE WITH FBC R312.3 WHICH REQUIRES THAT | | | OPENINGS IN THE GUARDS CAN NOT ALLOW A 4" DIAMETER | | | SPHERE TO PASS. | | | | | | 8) THE PRODUCT APPROVALS ARE REQUIRED TO BE REVIEWED | | | AND APPROVED IN WRITING BY THE DESIGNER OF RECORD. CITY | | | AMENDMENTS 107.3.4.1 | | | | | | 9) THE PRODUCT APPROVALS THAT WERE SUBMITTED FOR THE | | | SINGLE HUNG WINDOWS (NOA NO. 08-1210.03) AND THE | | | OUTSWING DOORS (NOA NO. 11-0912.12) HAVE BEEN | | | SUPERSEDED. PLEASE SUBMIT 2 SETS OF CURRENT PRODUCT | | | APPROVALS FOR THE SINGLE HUNG WINDOWS AND THE OUTSWING | | | DOORS. DCA RULE 9N-3 | | | | | | 10) PLEASE SUBMIT 2 SETS OF CURRENT PRODUCT APPROVALS | | | FOR THE FIXED GLASS WINDOWS, THE STRUCTURAL MULLIONS, | | | THE CONCRETE ROOF TILES (SPECIFY ATTACHMENT METHOD) THE | | | STANDING SEAM METAL ROOF, THE MODIFIED BITUMEN ROOFING | | | ON THE BALCONIES (WITH RAS 117 ENHANCED FASTENING | | | CALCULATIONS) AND THE SIMPSON CONNECTORS, STRAPS & | | | HANGERS AS REQUIRED BY DCA RULE 9N-3. | | | | | | 11) IN ORDER TO SPEED REVIEW TIME, PLEASE SUBMIT A | | | RESPONSE LETTER INDICATING HOW THE REVIEW COMMENTS HAVE | | | BEEN ADDRESSED. | | | | | | ROBERT MCDOUGAL | | | BLDG. PLAN REVIEW | | | (561)805-6714 | | | [email protected] |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2012-08-13 |
|
|
Cont ID |
|
| Sent By |
rlecky |
Date |
2012-08-13 |
Time |
08:00 |
Rev Time |
0.00 |
| Received By |
rlecky |
Date |
2012-08-13 |
Time |
06:58 |
Sent To |
|
|
| Notes |
| 2012-08-13 09:16:31 | ROUTED TO BIN R10 | | 2012-08-13 08:07:14 | ADDITIONAL REQUIREMENTS NOTED ON PLAN. | | | | | | ROBERT LECKY | | | ELECTRIC PLANS EXAMINER | | | [email protected] | | | 561-805-6718 | | | | | | | | | | | | |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
N |
Date |
2012-08-15 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2012-08-15 |
Time |
08:28 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2012-08-15 |
Time |
08:28 |
Sent To |
|
|
| Notes |
| 2012-08-15 08:32:27 | SEPARATE PERMITS, APPLICATION, PLANS AND REVIEW IS | | | REQUIRED FOR THE GAS. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2014-02-07 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2014-02-07 |
Time |
18:16 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2014-02-07 |
Time |
18:16 |
Sent To |
|
|
| Notes |
| 2014-02-07 18:16:18 | ELEVATION CERT ROUTED TO SH DESK | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2012-10-03 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2012-10-03 |
Time |
08:19 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2012-10-02 |
Time |
16:50 |
Sent To |
|
|
| Notes |
| 2012-10-02 16:51:07 | GAVE TO ROBBIE | | | EXPEDITED |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2012-09-24 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2012-09-24 |
Time |
16:37 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2012-09-17 |
Time |
13:30 |
Sent To |
|
|
| Notes |
| 2012-09-17 13:30:42 | SENT TO MCDOUGAL'S DESK FOR REVIEW. JG. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2012-08-30 |
|
|
Cont ID |
|
| Sent By |
rlecky |
Date |
2012-08-30 |
Time |
16:01 |
Rev Time |
0.00 |
| Received By |
rlecky |
Date |
2012-08-09 |
Time |
16:17 |
Sent To |
|
|
| Notes |
| 2012-08-13 09:16:11 | R10 | | 2012-08-09 16:18:19 | EXPEDITED | | | GAVE TO LECKY |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
3 |
Status |
P |
Date |
2012-10-05 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2012-10-05 |
Time |
08:46 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2012-10-05 |
Time |
08:46 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
2 |
Status |
F |
Date |
2012-09-24 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2012-09-24 |
Time |
16:37 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2012-09-24 |
Time |
08:18 |
Sent To |
|
|
| Notes |
| 2012-09-24 16:37:45 | AN IMPACT FEE REVIEW BY PALM BEACH COUNTY WILL BE | | | REQUIRED BEFORE THE PERMIT IS ISSUED. THIS IS TYPICALLY | | | DONE AFTER THE PLANS HAVE BEEN APPROVED BY THE CITY. |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
1 |
Status |
F |
Date |
2012-08-15 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2012-08-15 |
Time |
08:24 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2012-08-15 |
Time |
08:24 |
Sent To |
|
|
| Notes |
| 2012-08-15 08:27:05 | AN IMPACT FEE REVIEW BY PALM BEACH COUNTY WILL BE | | | REQUIRED BEFORE THE PERMIT IS ISSUED. THIS IS TYPICALLY | | | DONE AFTER THE PLANS HAVE BEEN APPROVED BY THE CITY. |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2012-09-24 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2012-09-24 |
Time |
08:56 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2012-09-24 |
Time |
08:56 |
Sent To |
|
|
| Notes |
| 2012-09-24 09:10:13 | 2010 FBC | | | | | | MECHANICAL REVISION REQUIRED | | | | | | 1) THE EQUIPMENT FOR BOTH OF THE 19 SEER UNITS AS | | | SPECIFIED ON THE ENERGY CALCULATIONS IS TO BE LISTED IN | | | THE EQUIPMENT SIZING CALCULATION SUMMARIES AND AN | | | EQUIPMENT MATCHING SCHEDULE IS REQUIRED ON THE PLANS. | | | FBCR M1401.3 AND CITY AMENDMENTS 107.2.1 |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
P |
Date |
2012-10-02 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2012-10-02 |
Time |
17:37 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2012-10-02 |
Time |
17:37 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
F |
Date |
2012-09-24 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2012-09-24 |
Time |
10:10 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2012-09-24 |
Time |
10:10 |
Sent To |
|
|
| Notes |
| 2012-09-24 10:16:53 | 2010 FBC | | | | | | DENIED BY PLUMBING | | | | | | 1) SECOND FLOOR BATHROOM #3 IS NOT SHOWN ON THE | | | SANITARY PLUMBING ISOMETRIC DRAWINGS. PLEASE CORRECT. | | | FBCR M1401.3 AND CITY AMENDMENTS 107.2.1 | | | | | | 2) THE SANITARY ISOMETRIC DRAWINGS THAT WERE SUBMITTED | | | SHOW EACH FIXTURE GROUP SEPARATELY. SUBMIT 2 SETS OF | | | SANITARY ISOMETRIC DRAWINGS FOR THE ENTIRE (DWV) | | | SANITARY DRAINAGE SYSTEM SHOWN TOGETHER. FBCR P3001.1 | | | AND CITY AMENDMENTS 107.2.1 | | | | | | ROBERT MCDOUGAL | | | BLDG. PLAN REVIEW | | | (561)805-6714 | | | [email protected] |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2012-08-15 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2012-08-15 |
Time |
07:36 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2012-08-15 |
Time |
07:36 |
Sent To |
|
|
| Notes |
| 2012-08-15 08:23:56 | 2010 FBC | | | | | | DENIED BY PLUMBING | | | | | | 1) SUBMIT TWO SETS OF A SANITARY RISER ISOMETERIC | | | DRAWINGS AS REQUIRED BY CITY AMENDMENTS 107.3.5.3. | | | SPECIFY ALL DRAIN, WASTE AND VENT PIPE SIZES ON THE | | | DRAWINGS. | | | | | | ROBERT MCDOUGAL | | | BLDG. PLAN REVIEW | | | (561)805-6714 | | | [email protected] |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
N |
Date |
2012-08-29 |
|
|
Cont ID |
|
| Sent By |
ajones |
Date |
2012-08-29 |
Time |
15:19 |
Rev Time |
0.00 |
| Received By |
ajones |
Date |
2012-08-29 |
Time |
15:19 |
Sent To |
|
|
| Notes |
|
|