| Plan Review Stops For Permit 12070627 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2012-07-20 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2012-07-20 |
Time |
06:55 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2012-07-19 |
Time |
07:13 |
Sent To |
|
|
| Notes |
| 2012-07-20 07:09:26 | STRUCTURE IS LOCATED IN AN A5 FLOOD ZONE. ALL OF THE | | | EQUIPMENT FOR THE NEW ELEVATOR IS REQUIRED TO BE | | | LOCATED AT AN ELEVATION ABOVE 7.5' BFE. PROVIDE AN | | | ELEVATION CERTIFICATE OR SURVEY INDICATING THE FINISH | | | FLOOR ELEVATION TO THE FIELD INSPECTOR. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2012-07-20 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2012-07-20 |
Time |
07:21 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2012-07-20 |
Time |
06:54 |
Sent To |
|
|
| Notes |
| 2012-07-20 07:07:12 | STRUCTURE IS LOCATED IN AN A5 FLOOD ZONE ALL ELECTICAL | | | EQUIPMENT IS REQUIRED TO BE LOCATED AT AN ELEVATION | | | ABOVE 7.5' BFE. PROVIDE AN ELEVATION CERTIFICATE OR | | | SURVEY INDICATING THE FINISH FLOOR ELEVATION TO THE | | | FIELD INSPECTOR. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2012-07-20 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2012-07-20 |
Time |
07:21 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2012-07-18 |
Time |
06:54 |
Sent To |
|
|
| Notes |
| 2012-07-20 06:54:56 | SENT TO R MCDOUGAL |
|
|
|