| Plan Review Stops For Permit 12060170 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
N |
Date |
2013-01-30 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2013-01-30 |
Time |
09:52 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2013-01-30 |
Time |
09:52 |
Sent To |
|
|
| Notes |
| 2013-01-30 09:55:12 | REVIEWED CHANGE ORDERS FOR VALUE SCOPE OF WORK RELATED | | | TO BUILDING, PLUMBING, ELECTRICAL AND MECHANICAL. TOTAL | | | $69, 944. FEES WERE ADJUSTED ACCORDINGLY. LANDSCAPE AND | | | IRRIGATION WERE NOT ADDED. JG. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2012-12-04 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2012-12-04 |
Time |
10:08 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2012-12-04 |
Time |
10:08 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2012-06-29 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2012-06-29 |
Time |
15:46 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2012-06-29 |
Time |
14:22 |
Sent To |
|
|
| Notes |
| 2012-06-29 15:50:09 | RESIDENTIAL (R3) RENOVATION BUILDING REVIEW COMMENTS. | | | CODE: 2010 FBC. | | | | | | 1- ENGINEER (CARL A. WILSON) TO SIGN AND SEAL DRAWINGS | | | AS REQUIRED BY FLORIDA STATUTE 471 WHEN SUBMITTING | | | DOCUMENTS FOR PUBLIC RECORDS. | | | | | | 2- PROVIDE ENERGY CALCULATIONS AS REQUIRED BY SEC. | | | 101.4.3 AND 103.2 OF 2010 FBC-ENERGY CONSERVATION. | | | | | | 3- ENGINEER TO PROVIDE ALL THE DESIGN PARAMETERS | | | INFORMATION ON THE PLANS. SPECIFY CURRENT CODE IN | | | EFFECT, SPECIFY THE BUILDING EXPOSURE, SPECIFY THE | | | ULTIMATE AND NOMINAL WIND LOADS. AND SPECIFY THE DESIGN | | | PRESSURES FOR DOORS AND WINDOWS INCLUDING THE GARAGE | | | DOOR. SEC. R301.2.1.4.3 OF 2010 FLORIDA RESIDENTIAL | | | CODE. | | | | | | NOTE: ACCORDING TO SEC. R301.2.1.4.3, THIS BUILDING IS | | | LOCATED ON EXPOSURE "C", | | | | | | 4- COLUMN ELEVATION DETAIL: ENGINEER TO CLARIFY HOW IS | | | THE STEEL COLUMN GOING TO BE FASTENED AT THE BASE. | | | PROVIDE COMPLETE SPECIFICATIONS FOR COLUMN BASE AND | | | CLARIFY WHY ONLY ONE 3/8" DIA. ANCHOR WAS SPECIFIED. | | | HOW MUCH ANCHOR EMBEDMENT IS REQUIRED INTO THE CONCRETE | | | FOOTING?. SEC. 107.2.1.3 CITY AMENDMENTS TO FBC. | | | | | | 5- PROVIDE MANUFACTURER SPECIFICATIONS FOR DOORS AND | | | WINDOWS SHOWING COMPLIANCE WITH THE ENERGY EFFICIENCY | | | REQUIRED BY THE ENERGY CALCULATIONS AND TABLE 402.1.1 | | | OF THE 2010 FBC-ENERGY CONSERVATION. | | | | | | 6- PROVIDE PRODUCT APPROVAL (2 COPIES). SEC. 107.2 CITY | | | AMENDMENTS TO FBC: | | | A) GARAGE DOOR. NOA 09-0604.03 SUBMITTED WAS SUPERSEDED | | | BY MIAMI-DADE. VISIT THE MIAMI-DADE WEBSITE AND | | | DOWNLOAD CURRENT NOA. | | | | | | B) SINGLE HUNG WINDOWS. NOA 11-0705.09 SUBMITTED WAS | | | SUPERSEDED BY MIAMI-DADE. DOWNLOAD CURRENT NOA. | | | | | | 7- ENGINEER OF RECORD TO REVIEW AND APPROVE IN WRITING | | | (NOT SIGNING AND SEALING) ALL PRODUCT APPROVALS AS | | | REQUIRED BY SEC. 107.3.4.1 CITY AMENDMENTS TO FBC. | | | | | | 8- PROVIDE COMPLETE INSTALLATION SCHEDULE FOR STORM | | | SHUTTERS INSTALLATION. CLEARLY IDENTIFY SPECIFIC | | | MOUNTING CONDITIONS AND ANCHOR TYPE AND SPACING TO BE | | | USED. SEC. 107.2.1 CITY AMENDMENTS TO FBC. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE CALL | | | JULIO GOMEZ | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561)805-6712 | | | [email protected] |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2012-12-04 |
|
|
Cont ID |
|
| Sent By |
rlecky |
Date |
2012-12-04 |
Time |
14:48 |
Rev Time |
0.00 |
| Received By |
rlecky |
Date |
2012-12-04 |
Time |
14:41 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2012-06-11 |
|
|
Cont ID |
|
| Sent By |
rlecky |
Date |
2012-06-11 |
Time |
10:59 |
Rev Time |
0.00 |
| Received By |
rlecky |
Date |
2012-06-11 |
Time |
10:52 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
shill |
Date |
2013-01-28 |
Time |
10:06 |
Sent To |
|
|
| Notes |
| 2013-01-28 10:06:29 | SUBMITTAL ROUTED TO JG DESK | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2012-12-04 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2012-12-04 |
Time |
14:02 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2012-11-15 |
Time |
15:44 |
Sent To |
|
|
| Notes |
| 2012-11-19 15:45:16 | IN ZONING BOX |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2012-06-29 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2012-06-29 |
Time |
16:46 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2012-06-08 |
Time |
11:54 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2012-06-25 |
|
|
Cont ID |
|
| Sent By |
hmoser |
Date |
2012-06-25 |
Time |
10:20 |
Rev Time |
0.00 |
| Received By |
hmoser |
Date |
2012-06-25 |
Time |
10:20 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2012-12-04 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2012-12-04 |
Time |
13:45 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2012-12-04 |
Time |
13:45 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2012-06-29 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2012-06-29 |
Time |
16:41 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2012-06-29 |
Time |
16:40 |
Sent To |
|
|
| Notes |
| 2012-06-29 16:45:58 | RESIDENTIAL (R3) RENOVATION PLUMBING REVIEW COMMENTS. | | | CODE 2010 FLORIDA RESIDENTIAL CODE. | | | | | | 1- PROVIDE PLUMBING RISER DIAGRAM SHOWING PIPE SIZES | | | AND VENT FOR NEW WASHER DRAIN AS REQUIRED BY SEC. | | | 107.3.5.3(11) OF CITY AMENDMENTS TO FBC. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE CALL | | | JULIO GOMEZ | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561)805-6712 | | | [email protected] |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
P |
Date |
2012-12-05 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2012-12-05 |
Time |
15:24 |
Rev Time |
0.25 |
| Received By |
eschneid |
Date |
2012-12-05 |
Time |
15:24 |
Sent To |
PC |
|
| Notes |
| 2012-12-05 15:26:56 | PASSED W/PROVISO | | | | | | 1) THE LANDSCAPE SHALL BE INSTALLED PER THE LANDSCAPE | | | PLAN APPROVED AS PART OF PERMIT NO. 12120063 AND | | | IRRIGATION PER PERMIT NO. 12120065 PRIOR TO THE FINAL | | | INSPECTION OF THIS PERMIT. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
2012-11-30 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2012-11-30 |
Time |
15:14 |
Rev Time |
0.75 |
| Received By |
eschneid |
Date |
2012-11-20 |
Time |
09:19 |
Sent To |
B |
|
| Notes |
| 2012-11-30 16:02:04 | FAILED | | | | | | 1) REPEAT COMMENT - THE VALUE OF THE CONSTRUCTION | | | ($44,142) EXCEEDS 50% OF THE STRUCTURE'S VALUE | | | ($74,016) ACCORDING TO THE P.B.C. PROPERTY APPRAISER'S | | | OFFICE; THEREFORE, PURSUANT TO SECTION 94-441(C)(2) OF | | | THE ZONING AND LAND DEVELOPMENT REGULATIONS (ZLDR), THE | | | LANDSCAPE ON THE SITE SHALL BE IN COMPLIANCE WITH ALL | | | APPLICABLE REGULATIONS FOUND IN ARTICLE XIV OF THE | | | ZLDR. IF THE SITE CONFORMS TO ARTICLE XIV, THEN TWO (2) | | | COPIES OF A LANDSCAPE PLAN DEMONSTRATING COMPLIANCE | | | SHALL BE INCLUDED WITH THE PERMIT RE-SUBMITTAL. IF THE | | | SITE DOES NOT CONFORM TO ARTICLE XIV, THEN PRIOR TO THE | | | ZONING APPROVAL OF THIS PERMIT A SEPARATE LANDSCAPE | | | PERMIT AND IRRIGATION PERMIT SHALL BE SUBMITTED SHOWING | | | MATERIAL TO BRING THE SITE INTO CONFORMITY. THE | | | RESUBMITTAL INCLUDES A LANDSCAPE PLAN. THIS PLAN NEEDS | | | TO BE SUBMITTED AS A SEPARATE PERMIT, WITH COST | | | ESTIMATE SHOWING THE VALUE OF THE LANDSCAPE WORK. | | | | | | 2) A FULL REVIEW WILL BE PERFORMED OF THE LANDSCAPE | | | PLANS AS PART OF THE LANDSCAPE PERMIT. A CURSORY REVIEW | | | IS INCLUDED BELOW: | | | | | | A. A TABLE SHOWING COMPLIANCE WITH WITH THE CITY'S | | | XERISCAPE REQUIREMENTS SHALL BE INCLUDED ON THE PLAN. | | | | | | B. STAFF DOES NOT RECOMMEND THE USE OF BLACK OLIVE | | | TREES AS THEY WILL STAIN THE ADJACENT SIDEWALK. | | | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446. | | | | | | | | 2012-11-21 11:03:07 | GAVE TO E.S. - MD |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2012-06-20 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2012-06-20 |
Time |
15:23 |
Rev Time |
0.45 |
| Received By |
eschneid |
Date |
2012-06-20 |
Time |
15:23 |
Sent To |
|
|
| Notes |
| 2012-06-20 15:22:55 | FAILED | | | | | | 1) PROVIDE TWO COPIES OF A RECENT SURVEY WHICH CLEARLY | | | SHOWS THE SETBACK DIMENSION FROM THE REPLACEMENT A/C | | | UNIT AND PAD TO THE PROPERTY LINE. PLEASE NOTE THAT IT | | | MAY ONLY ENCROACH 4 FEET INTO THE REQUIRED SETBACK. | | | ADDITONAL COMMENTS MAY RESULT FROM THE SUBMITTAL OF THE | | | SURVEY. | | | | | | 2) THE VALUE OF THE CONSTRUCTION ($44,142) EXCEEDS 50% | | | OF THE STRUCTURE'S VALUE ($74,016) ACCORDING TO THE | | | P.B.C. PROPERTY APPRAISER'S OFFICE; THEREFORE, PURSUANT | | | TO SECTION 94-441(C)(2) OF THE ZONING AND LAND | | | DEVELOPMENT REGULATIONS (ZLDR), THE LANDSCAPE ON THE | | | SITE SHALL BE IN COMPLIANCE WITH ALL APPLICABLE | | | REGULATIONS FOUND IN ARTICLE XIV OF THE ZLDR. IF THE | | | SITE CONFORMS TO ARTICLE XIV, THEN TWO (2) COPIES OF A | | | LANDSCAPE PLAN DEMONSTRATING COMPLIANCE SHALL BE | | | INCLUDED WITH THE PERMIT RE-SUBMITTAL. IF THE SITE DOES | | | NOT CONFORM TO ARTICLE XIV, THEN PRIOR TO THE ZONING | | | APPROVAL OF THIS PERMIT A SEPARATE LANDSCAPE PERMIT AND | | | IRRIGATION PERMIT SHALL BE SUBMITTED SHOWING MATERIAL | | | TO BRING THE SITE INTO CONFORMITY. | | | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446. | | | | | | |
|
|