Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2012-03-28 Cont ID  
Sent By jgomez Date 2012-03-28 Time 09:35 Rev Time 0.00
Received By jgomez Date 2012-03-28 Time 09:23 Sent To  
Notes
2012-03-28 09:36:51ENGINEER FAXED REVISED RAS 117 CALCULATIONS. NEED
 DOCUMENTS WITH ORIGINAL SEAL AND SIGNATURE AS REQUIRED
 BY FLORIDA STATUTE CHAPTER 471.

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2012-03-27 Cont ID  
Sent By jgomez Date 2012-03-27 Time 14:46 Rev Time 0.00
Received By jgomez Date 2012-03-27 Time 14:41 Sent To  
Notes
2012-03-27 14:50:10RE-ROOF BUILDING REVIEW THIRD CHECKLIST.
 2007 BC WITH 2009 REVISIONS.
  
 ***ORIGINAL COMMENT:
 1- PROVIDE ACTUAL RAS 117 CALCULATIONS SHOWING
 COMPLIANCE WITH THE NAIL ENHANCING SHOWN FOR THE
 PROPOSED NAIL ENHANCING ON ROOF ZONE 2 AND 3. IT LOOKS
 LIKE THE PROPOSED NAIL ENHANCING DOESN'T MEET THE
 CALCULATED DESIGN PRESSURES FOR ROOF ZONE 3. PAGE 10 OF
 14 OF NOA SUBMITTED SHOWS MEMBRANE WITH 57" TABS SYSTEM
 WITH THE SAME FASTENER SPACING (6"O.C.) WITH A MAXIMUM
 DESIGN PRESSURE OF -105.0PSF.
 SEC. 106.1.2 CITY AMENDMENTS TO FBC.
  
 ***NO ENGINEER RESPONSE TO THIS ITEM. NO CALCULATIONS
 WERE SUBMITTED.
  
 2- VALUATION DECLARED IN THE PERMIT APPLICATION IS TOO
 LOW. SEC. 108.3 CITY AMENDMENTS TO FBC. VALUATION WAS
 UPDATED. OWES $432.18.
  
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561)805-6712

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2012-03-19 Cont ID  
Sent By jgomez Date 2012-03-19 Time 11:02 Rev Time 0.00
Received By jgomez Date 2012-03-19 Time 11:00 Sent To  
Notes
2012-03-19 11:09:16RE-ROOF RE-SUBMITTAL BUILDING REVIEW COMMENTS.
 2007 BC WITH 2009 REVISIONS.
  
 1- GENERAL LIMITATION #5 ON LAST PAGE OF NOA 07-1018.10
 SUBMITTED REQUIRES A FIELD WITHDRAWAL TEST (TAS 105).
 NEED TO PROVIDE THE TAS 105 REPORT AND THE REQUIRED
 SIGNED AND SEALED RAS 117 CALCULATIONS BASED ON THE
 TEST RESULTS.
  
 2- PROVIDE ACTUAL RAS 117 CALCULATIONS SHOWING
 COMPLIANCE WITH THE NAIL ENHANCING SHOWN FOR THE
 PROPOSED NAIL ENHANCING ON ROOF ZONE 2 AND 3. IT LOOKS
 LIKE THE PROPOSED NAIL ENHANCING DOESN'T MEET THE
 CALCULATED DESIGN PRESSURES FOR ROOF ZONE 3. PAGE 10 OF
 14 OF NOA SUBMITTED SHOWS MEMBRANE WITH 57" TABS SYSTEM
 WITH THE SAME FASTENER SPACING (6"O.C.) WITH A MAXIMUM
 DESIGN PRESSURE OF -105.0PSF.
 SEC. 106.1.2 CITY AMENDMENTS TO FBC.
  
 3- VALUATION DECLARED IN THE PERMIT APPLICATION IS TOO
 LOW. SEC. 108.3 CITY AMENDMENTS TO FBC. VALUATION WAS
 UPDATED. OWES $432.18.
  
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561)805-6712

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2012-03-14 Cont ID  
Sent By jgomez Date 2012-03-14 Time 14:20 Rev Time 0.00
Received By jgomez Date 2012-03-14 Time 14:04 Sent To  
Notes
2012-03-14 14:37:59RE-ROOF BUILDING REVIEW COMMENTS.
 2007 BC WITH 2009 REVISIONS.
  
 1- CONCRETE DECK SYSTEM LIMITATION #1 ON LAST PAGE OF
 NOA 07-1018.10 SUBMITTED REQUIRES A FIELD WITHDRAWAL
 TEST (TAS 105). NEED TO PROVIDE THE TAS 105 REPORT AND
 THE REQUIRED SIGNED AND SEALED RAS 117 CALCULATIONS
 BASED ON THE TEST RESULTS.
  
 2- PROVIDE ACTUAL RAS 117 CALCULATIONS SHOWING
 COMPLIANCE WITH THE NAIL ENHANCING SHOWN FOR THE
 PROPOSED NAIL ENHANCING ON ROOF ZONE 2 AND 3. IT LOOKS
 LIKE THE PROPOSED NAIL ENHANCING DOESN'T MEET THE
 CALCULATED DESIGN PRESSURES FOR ROOF ZONE 3. PAGE 10 OF
 14 OF NOA SUBMITTED SHOWS MEMBRANE WITH 57" TABS SYSTEM
 WITH THE SAME FASTENER SPACING (6"O.C.) WITH A MAXIMUM
 DESIGN PRESSURE OF -105.0PSF.
 SEC. 106.1.2 CITY AMENDMENTS TO FBC.
  
 3- VALUATION DECLARED IN THE PERMIT APPLICATION IS TOO
 LOW. SEC. 108.3 CITY AMENDMENTS TO FBC. VALUATION WAS
 UPDATED. OWES $432.18.
  
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561)805-6712

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2012-03-28 Cont ID  
Sent By jgomez Date 2012-03-28 Time 09:23 Rev Time 0.00
Received By jgomez Date 2012-03-28 Time 09:23 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2012-03-27 Cont ID  
Sent By jgomez Date 2012-03-27 Time 14:40 Rev Time 0.00
Received By jgomez Date 2012-03-27 Time 14:40 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2012-03-19 Cont ID  
Sent By jgomez Date 2012-03-19 Time 11:00 Rev Time 0.00
Received By jgomez Date 2012-03-19 Time 11:00 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2012-03-14 Cont ID  
Sent By jgomez Date 2012-03-14 Time 14:04 Rev Time 0.00
Received By jgomez Date 2012-03-14 Time 14:04 Sent To  
Notes
***NONE***