Plan Review Details - Permit 12010596
Plan Review Stops For Permit 12010596
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2012-03-09 Cont ID  
Sent By rmcdouga Date 2012-03-09 Time 14:50 Rev Time 0.00
Received By rmcdouga Date 2012-03-09 Time 13:37 Sent To  
Notes
2012-03-09 15:48:20BUILDING PROVISO
  
 EMERGENCY RESCUE AND ESCAPE OPENINGS AS REQUIRED BY
 FBCR 310 SHALL NOT BE COMPROMISED BY THIS ADDITION.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2012-02-21 Cont ID  
Sent By rmcdouga Date 2012-02-21 Time 11:55 Rev Time 0.00
Received By rmcdouga Date 2012-02-16 Time 15:36 Sent To  
Notes
2012-02-16 15:42:522007 FBC W/2009 REVISIONS
  
 DENIED BY BUILDING
  
 1) THE STRUCTURE IS LOCATED IN EXPOSURE CATEGORY C PER
 2007 FBC R 301.2.1.4.3. PLEASE REVISE THE ROOF NOTES
 AND TRUSS LOADING NOTES ON S-1 TO SPECIFY EXPOSURE C.
  
 2) THE TRUSS LOADING NOTES SPECIFY A MAXIMUM TRUSS
 SPACING OF 12" O.C. AND THE ROOF PLAN ON S-1 SPECIFIES
 TRUSSES 24" O.C. PLEASE CLARIFY. CITY AMENDMENTS
 106.1.1
  
 3) THE PRODUCT APPROVALS ARE REQUIRED TO BE REVIEWED
 AND APPROVED IN WRITING BY THE DESIGNER OF RECORD. CITY
 AMENDMENTS 106.3.3
  
 4) PRODUCT APPROVALS WERE SUBMITTED FOR A SINGLE HUNG
 WINDOW, HOWEVER, THERE DOES NOT APPEAR TO BE ANY NEW SH
 WINDOWS SHOWN ON THE PLANS. PLEASE CLARIFY. CITY
 AMENDMENTS 106.1.1
  
 5) FROM THE PLANS THAT WERE SUBMITTED FOR THIS
 ADDITION, IT DOES NOT APPEAR THAT ANY REQUIRED MEANS OF
 EGRESS OR EMERGENCY AND RESCUE OPENING AS REQUIRED BY
 FBC R310 HAS BEEN COMPROMISED. THIS IS A LIFE SAFETY
 ISSUE AND MUST BE IN COMPLIANCE.
  
 6) THE OWNER/AGENT IS REQUIRED TO SIGN THE ENERGY
 CALCULATION FORM PER 2007 FBCR ENERGY GLITCH AMENDMENTS
 SECTION N1100.2.2
  
 7) PLEASE PROVIDE A RESPONSE LETTER INDICATING HOW THE
 REVIEW COMMENTS HAVE BEEN ADDRESSED.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]
2012-02-01 09:42:19R--2

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2012-02-03 Cont ID  
Sent By rlecky Date 2012-02-03 Time 15:12 Rev Time 0.00
Received By rlecky Date 2012-02-03 Time 14:57 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2012-03-09 Cont ID  
Sent By rmcdouga Date 2012-03-09 Time 14:50 Rev Time 0.00
Received By rmcdouga Date 2012-03-08 Time 15:48 Sent To  
Notes
2012-03-08 15:49:19INCOMING SENT TO R MCDOUGALS DESK . JW

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2012-03-07 Cont ID  
Sent By ajones Date 2012-03-07 Time 08:58 Rev Time 0.00
Received By ajones Date 2012-01-27 Time 09:36 Sent To  
Notes
2012-02-01 10:22:16R--2

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 2 Status P Date 2012-03-09 Cont ID  
Sent By rmcdouga Date 2012-03-09 Time 14:00 Rev Time 0.00
Received By rmcdouga Date 2012-03-09 Time 14:00 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status F Date 2012-02-16 Cont ID  
Sent By rmcdouga Date 2012-02-16 Time 14:19 Rev Time 0.00
Received By rmcdouga Date 2012-02-16 Time 14:19 Sent To  
Notes
2012-02-16 14:20:48BEFORE A PERMIT TO CONSTRUCT CAN BE
 ISSUED, IMPACT FEES MUST BE PAID TO
 PALM BEACH COUNTY. THE PLANS MUST BE
 STAMPED AND THE RECEIPT ATTACHED TO THE
 APPLICATION. 233-5025

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2012-02-16 Cont ID  
Sent By rmcdouga Date 2012-02-16 Time 14:59 Rev Time 0.00
Received By rmcdouga Date 2012-02-16 Time 14:59 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status N Date 2012-03-07 Cont ID  
Sent By lfranco Date 2012-03-07 Time 08:58 Rev Time 0.00
Received By ajones Date 2012-03-07 Time 08:58 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved