Plan Review Details - Permit 11100586
| Plan Review Stops For Permit 11100586 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2011-11-15 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2011-11-15 |
Time |
09:15 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2011-11-15 |
Time |
09:15 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2011-11-15 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2011-11-15 |
Time |
09:15 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2011-11-15 |
Time |
09:15 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
N |
Date |
2011-11-15 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2011-11-15 |
Time |
09:16 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2011-11-15 |
Time |
09:16 |
Sent To |
|
|
| Notes |
| 2011-11-15 09:18:39 | SEPARATE PERMIT APPLICATION, PLANS AND REVIEW ARE | | | REQUIRED FOR GAS. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2011-11-30 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2011-11-30 |
Time |
14:28 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2011-11-28 |
Time |
10:57 |
Sent To |
|
|
| Notes |
| 2011-11-29 10:58:14 | TO RM DESK |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2011-11-15 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2011-11-15 |
Time |
09:19 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2011-10-28 |
Time |
12:53 |
Sent To |
|
|
| Notes |
| 2011-10-28 12:53:24 | INCOMING SENT TO ZONING BOX. JW |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2011-11-30 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2011-11-30 |
Time |
14:28 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2011-11-30 |
Time |
14:28 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2011-11-15 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2011-11-15 |
Time |
09:18 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2011-11-15 |
Time |
09:18 |
Sent To |
|
|
| Notes |
| 2011-11-15 09:47:20 | 2007 FBC W/2009 REVISIONS | | | | | | DENIED BY PLUMBING | | | | | | 1) THE PLANS SPECIFY A 2 HP JANDY STEALTH POOL PUMP AND | | | THE MANUFACTURER'S SPECIFICATION HAS THE SINGLE SPEED | | | 2HP, MODEL SHPF2.0 CIRCLED. HOWEVER, THE PUMP CURVE | | | THAT WAS MARKED 90 GPM @ 56' TDH IS FOR A 1HP SINGLE | | | SPEED PUMP, MODEL SHPF1.0. THE 2HP PUMP HAS A FLOW RATE | | | OF OVER 130 GPM @ 56' TDH, WHICH GIVES A VELOCITY OF | | | 8.48 FT/SEC IN THE 2-1/2" BRANCH PIPING AND EXCEEDS THE | | | MAXIMUM WATER VELOCITY OF 6 FT/SEC ALLOWED BY FBC | | | R4101.6.3. PLEASE CORRECT. | | | | | | 2) SUBMIT TWO COPIES OF THE TOTAL DYNAMIC HEAD | | | CALCULATIONS SHOWING HOW THE 56 FEET OF TDH WAS | | | DETERMINED. FBC R4101.6.1 | | | | | | ROBERT MCDOUGAL | | | BLDG. PLAN REVIEW | | | (561)805-6714 | | | [email protected] |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2011-11-12 |
|
|
Cont ID |
|
| Sent By |
ajones |
Date |
2011-11-12 |
Time |
11:41 |
Rev Time |
0.00 |
| Received By |
ajones |
Date |
2011-11-12 |
Time |
11:41 |
Sent To |
|
|
| Notes |
| 2011-11-12 11:41:42 | 11/12/11 APPROVED PLACED IN POOLS- AV |
|
|
|