|
 |
 |
 |
 |
 |
Plan Review Details - Permit 11100518
| Plan Review Stops For Permit 11100518 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2011-11-15 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2011-11-15 |
Time |
11:35 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2011-11-15 |
Time |
11:35 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2011-10-31 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2011-10-31 |
Time |
12:44 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2011-10-31 |
Time |
12:44 |
Sent To |
P |
|
| Notes |
| 2011-10-31 12:49:43 | ****CORRECTIONS**** | | | SAMANTHA HILL, BUILDING PLANS EXAMINER | | | 561-805-6724 [email protected] | | | FBC FLORIDA BUILDING CODE 2007 | | | FBC R FLORIDA BUILDING CODE 2007 RESIDENTIAL | | | | | | 1. SR-10, PLEASE REVISE ROOF CORNER ZONE NOTE TO | | | CLARIFY THAT THIS MUST BE A MINIMUM OF 4' (NOTES STATE | | | "WHICHEVER IS SMALLER), FBC R FIGURE 301.2(7). | | | | | | |
|
|
| Review Stop |
HIST |
HISTORICAL |
| Rev No |
1 |
Status |
P |
Date |
2011-10-24 |
|
|
Cont ID |
|
| Sent By |
jpapa |
Date |
2011-10-24 |
Time |
11:51 |
Rev Time |
0.00 |
| Received By |
jpapa |
Date |
2011-10-24 |
Time |
11:51 |
Sent To |
|
|
| Notes |
| 2011-10-24 11:52:45 | PROVISO: | | | | | | THE PROPOSED SOLAR PANELS SHALL NOT BE VISIBLE FROM THE | | | PUBLIC RIGHT-OF-WAY. FOR MORE INFORMATION, PLEASE | | | CONTACT JILLIAN PAPA, HISTORIC PRESERVATION PLANNER AT | | | 561-822-1454. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2011-11-15 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2011-11-15 |
Time |
11:35 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2011-11-10 |
Time |
17:48 |
Sent To |
|
|
| Notes |
| 2011-11-10 17:49:03 | GAVE TO SAMANTHA |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2011-11-01 |
|
|
Cont ID |
|
| Sent By |
lwagner |
Date |
2011-11-01 |
Time |
14:03 |
Rev Time |
0.00 |
| Received By |
lwagner |
Date |
2011-10-24 |
Time |
16:15 |
Sent To |
|
|
| Notes |
| 2011-10-24 16:16:28 | SENT TO MISC. SHELF #2 FOR REVIEW. JG. |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2011-11-01 |
|
|
Cont ID |
|
| Sent By |
lwagner |
Date |
2011-11-01 |
Time |
13:11 |
Rev Time |
0.00 |
| Received By |
lwagner |
Date |
2011-11-01 |
Time |
13:56 |
Sent To |
|
|
| Notes |
| 2011-11-01 13:11:18 | ***PROVISO*** | | | 1402.5.2 VACUUM. THE SOLAR ENERGY SYSTEM COMPONENTS | | | THAT ARE SUBJECTED TO A VACUUM WHILE IN OPERATION OR | | | DURING SHUTDOWN SHALL BE DESIGNED TO WITHSTAND SUCH | | | VACUUM OR SHALL BE PROTECTED WITH VACUUM RELIEF VALVES. | | | |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |