| 2011-10-21 08:48:02 | RE-ROOF BUILDING REVIEW CHECKLIST. |
| | 2007 FBC WITH 2009 REVISIONS. |
| | |
| | 1- CLEARLY SPECIFY WHICH APPROVED FLAT ROOF ASSEMBLY IS |
| | GOING TO BE INSTALLED TO VERIFY COMPLIANCE WITH THE |
| | DESIGN PRESSURES OF SEC. 1609 FBC. |
| | |
| | 2- SPECIFY HOW IS THE ROOF TILE GOING TO BE INSTALLED. |
| | ADHESIVE OR SCREWS/NAILS. TO VERIFY COMPLIANCE WITH THE |
| | DESIGN PRESSURES OF SEC. 1609 FBC. |
| | |
| | ***NOTE: PROVIDE CALCULATIONS SHOWING THE REQUIRED |
| | DESIGN PRESSURES AND THE REQUIRED ATTACHMENT RESISTANCE |
| | EXPRESSED AS A MOMENT - MF(FT-LBF). SEE NOA SUBMITTED. |
| | TAKE INTO CONSIDERATION THAT THIS BUILDING IS LOCATED |
| | ON EXPOSURE "C". |
| | |
| | 3- IF USING ADHESIVE TO INTALL ROOF TILES, THEN PROVIDE |
| | PRODUCT APPROVAL AS REQUIRED BY DCA RULE 9N-3. SEE ROOF |
| | TILE NOA FOR LISTED ADHESIVES AND CORRESPONDING UPLIFT |
| | MOMENT. |
| | |
| | 4- CLARIFY WHERE IS THE UNDERLAYMENT SHOWN ON NOA |
| | 11-0113.14 GOING TO BE INSTALLED. IS THIS FOR THE FLAT |
| | ROOF OR PITCHED ROOF? AND WHY?. |
| | |
| | 5- SPECIFY BUILDING MEAN ROOF HEIGHT TO VERIFY |
| | COMPLIANCE WITH THE DESIGN PRESSURES OF SEC. 1609 FBC. |
| | |
| | 6- FOR INFORMATION ONLY: A) ANY ROOF EQUIPMENT REMOVAL |
| | REQUIRES SEPARATE PERMIT. |
| | |
| | B) ANY ROOF DRAINS RETROFIT REQUIRE PLUMBING REVIEW. |
| | |
| | JULIO GOMEZ |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561)805-6712 |