Plan Review Details - Permit 11100255
Plan Review Stops For Permit 11100255
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status N Date 2011-11-28 Cont ID  
Sent By jwitmer Date 2011-11-28 Time 15:04 Rev Time 0.00
Received By jwitmer Date 2011-11-28 Time 15:04 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2011-10-18 Cont ID  
Sent By rlecky Date 2011-10-18 Time 09:08 Rev Time 0.00
Received By rlecky Date 2011-10-18 Time 08:50 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date   Cont ID  
Sent By   Date 2011-12-02 Time   Rev Time 0.00
Received By jwitmer Date 2011-10-13 Time 12:40 Sent To  
Notes
2011-10-13 12:41:00INCOMING SENT TO C-14. JW

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2011-12-02 Cont ID  
Sent By rregueir Date 2011-12-02 Time 13:22 Rev Time 0.00
Received By rregueir Date 2011-12-02 Time 13:22 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2011-10-14 Cont ID  
Sent By lwagner Date 2011-10-14 Time 14:12 Rev Time 0.00
Received By lwagner Date 2011-10-14 Time 14:03 Sent To  
Notes
2011-10-14 14:11:57****PROVISO****
  
 712.2 VALVES REQUIRED. A CHECK VALVE AND A FULL OPEN
 VALVE LOCATED ON THE DISCHARGE SIDE OF THE CHECK VALVE
 SHALL BE INSTALLED IN THE PUMP OR EJECTOR DISCHARGE
 PIPING BETWEEN THE PUMP OR EJECTOR AND THE GRAVITY
 DRAINAGE SYSTEM.
  
 712.3.5 EJECTOR CONNECTION TO THE DRAINAGE SYSTEM?WHERE
 THE DISCHARGE LINE CONNECTS INTO HORIZONTAL DRAINAGE
 PIPING, THE CONNECTOR SHALL BE MADE THROUGH A WYE
 FITTING INTO THE TOP OF THE DRAINAGE PIPING.
  