|
 |
 |
 |
 |
 |
Plan Review Details - Permit 11090441
| Plan Review Stops For Permit 11090441 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2011-09-20 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2011-09-20 |
Time |
15:46 |
Rev Time |
0.55 |
| Received By |
jwitmer |
Date |
2011-09-20 |
Time |
15:45 |
Sent To |
|
|
| Notes |
| 2011-09-20 15:58:06 | BUILDING PROVISO: | | | 1207.2 AIR-BORNE SOUND. WALLS, PARTITIONS AND | | | FLOOR/CEILING ASSEMBLIES SEPARATING DWELLING UNITS FROM | | | EACH OTHER OR FROM PUBLIC OR SERVICE AREAS SHALL HAVE A | | | SOUND TRANSMISSION CLASS (STC) OF NOT LESS THAN 50 (45 | | | IF FIELD TESTED) FOR AIR-BORNE NOISE WHEN TESTED IN | | | ACCORDANCE WITH ASTM E 90. PENETRATIONS OR OPENINGS IN | | | CONSTRUCTION ASSEMBLIES FOR PIPING; ELECTRICAL DEVICES; | | | RECESSED CABINETS; BATHTUBS; SOFFITS; OR HEATING, | | | VENTILATING OR EXHAUST DUCTS SHALL BE SEALED, LINED, | | | INSULATED OR OTHERWISE TREATED TO MAINTAIN THE REQUIRED | | | RATINGS. THIS REQUIREMENT SHALL NOT APPLY TO DWELLING | | | UNIT ENTRANCE DOORS; HOWEVER, SUCH DOORS SHALL BE TIGHT | | | FITTING TO THE FRAME AND SILL. | | | | | | 1207.3 STRUCTURE-BORNE SOUND. FLOOR/CEILING ASSEMBLIES | | | BETWEEN DWELLING UNITS OR BETWEEN A DWELLING UNIT AND A | | | PUBLIC OR SERVICE AREA WITHIN THE STRUCTURE SHALL HAVE | | | AN IMPACT INSULATION CLASS (IIC) RATING OF NOT LESS | | | THAN 50 (45 IF FIELD TESTED) WHEN TESTED IN ACCORDANCE | | | WITH ASTM E 492. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2011-09-20 |
|
|
Cont ID |
|
| Sent By |
rlecky |
Date |
2011-09-20 |
Time |
12:10 |
Rev Time |
0.00 |
| Received By |
rlecky |
Date |
2011-09-20 |
Time |
12:01 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2011-09-20 |
|
|
Cont ID |
|
| Sent By |
wjolin |
Date |
2011-09-20 |
Time |
08:11 |
Rev Time |
0.00 |
| Received By |
wjolin |
Date |
2011-09-20 |
Time |
07:56 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2011-09-22 |
|
|
Cont ID |
|
| Sent By |
lwagner |
Date |
2011-09-22 |
Time |
10:31 |
Rev Time |
0.00 |
| Received By |
lwagner |
Date |
2011-09-19 |
Time |
16:41 |
Sent To |
|
|
| Notes |
| 2011-09-19 16:42:07 | *******************EXPEDITED********************* | | | B--1 |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2011-09-22 |
|
|
Cont ID |
|
| Sent By |
lwagner |
Date |
2011-09-22 |
Time |
10:22 |
Rev Time |
0.00 |
| Received By |
lwagner |
Date |
2011-09-22 |
Time |
09:38 |
Sent To |
|
|
| Notes |
| 2011-09-22 10:13:58 | ***PROVISO*** | | | RELIEF VENT FOR KS 917.3.2 |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |