|
 |
 |
 |
 |
 |
Plan Review Details - Permit 11090393
| Plan Review Stops For Permit 11090393 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2011-09-21 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2011-09-21 |
Time |
16:22 |
Rev Time |
0.55 |
| Received By |
jwitmer |
Date |
2011-09-21 |
Time |
16:17 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2011-09-21 |
|
|
Cont ID |
|
| Sent By |
rlecky |
Date |
2011-09-21 |
Time |
11:17 |
Rev Time |
0.00 |
| Received By |
rlecky |
Date |
2011-09-21 |
Time |
11:11 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2011-09-19 |
|
|
Cont ID |
|
| Sent By |
wjolin |
Date |
2011-09-19 |
Time |
10:38 |
Rev Time |
0.00 |
| Received By |
wjolin |
Date |
2011-09-19 |
Time |
10:19 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2011-10-14 |
Time |
|
Rev Time |
0.00 |
| Received By |
rregueir |
Date |
2011-09-16 |
Time |
12:59 |
Sent To |
|
|
| Notes |
| 2011-09-16 12:59:28 | **DIGITAL PLANS** SEE PROJECTDOX |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2011-10-04 |
|
|
Cont ID |
|
| Sent By |
rregueir |
Date |
2011-10-03 |
Time |
10:59 |
Rev Time |
0.00 |
| Received By |
rregueir |
Date |
2011-10-03 |
Time |
10:59 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2011-09-21 |
|
|
Cont ID |
|
| Sent By |
lwagner |
Date |
2011-09-21 |
Time |
11:42 |
Rev Time |
0.00 |
| Received By |
lwagner |
Date |
2011-09-21 |
Time |
11:11 |
Sent To |
|
|
| Notes |
| 2011-09-21 11:31:53 | *****PROVISO***** | | | | | | 712.2 VALVES REQUIRED. A CHECK VALVE AND A FULL OPEN | | | VALVE LOCATED ON THE DISCHARGE SIDE OF THE CHECK VALVE | | | SHALL BE INSTALLED IN THE PUMP OR EJECTOR DISCHARGE | | | PIPING BETWEEN THE PUMP OR EJECTOR | | | | | | 712.3.5 EJECTOR CONNECTION TO THE DRAINAGE SYSTEM. | | | PUMPS CONNECTED TO THE DRAINAGE SYSTEM SHALL CONNECT TO | | | THE BUILDING SEWER OR SHALL CONNECT TO A WYE FITTING IN | | | THE BUILDING DRAIN A MINIMUM OF 10 FEET (3048 MM) FROM | | | THE BASE OF ANY SOIL STACK, WASTE STACK OR FIXTURE | | | DRAIN. WHERE THE DISCHARGE LINE CONNECTS INTO | | | HORIZONTAL DRAINAGE PIPING, THE CONNECTOR SHALL BE MADE | | | THROUGH A WYE FITTING INTO THE TOP OF THE DRAINAGE | | | PIPING. | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
P |
Date |
2011-10-14 |
|
|
Cont ID |
|
| Sent By |
rregueir |
Date |
2011-10-14 |
Time |
15:42 |
Rev Time |
0.00 |
| Received By |
rregueir |
Date |
2011-10-14 |
Time |
15:42 |
Sent To |
|
|
| Notes |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |