Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2012-01-18 Cont ID  
Sent By jgomez Date 2012-01-18 Time 10:01 Rev Time 0.00
Received By jgomez Date 2012-01-18 Time 10:01 Sent To  
Notes
2012-01-18 10:08:24SEE COMMENTS ON REVISION #11110560.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2011-08-23 Cont ID  
Sent By jgomez Date 2011-08-22 Time 14:03 Rev Time 0.00
Received By jgomez Date 2011-08-22 Time 14:03 Sent To  
Notes
2011-08-22 14:15:26REVISION BUILDING REVIEW CHECKLIST.
  
 1- REVISE LOAD SCHEDULE ON SHEET C-1: ATTIC LIVE LOAD
 WAS ADDED BUT NEED TO CLARIFY WHY THERE IS NO ATTIC
 DEAD LOAD AND WHY THE TOTAL LOAD IS ZERO ALSO. REVISE
 AS REQUIRED.
  
 2- PROVIDE COMPLETE INFORMATION FOR COVERED PATIO #2
 SCREEN ENCLOSURE UNDER A SEPARATE PERMIT. NO PERMIT
 APPLICATION SUBMITTED YET.
  
 3- PROVIDE COMPLETE MANUFACTURER'S SPECIFICATIONS FOR
 APPROVED GAS GRILL TO BE INSTALLED IN THE COVERED PATIO
 AS SHOWN ON PLANS. CONTRACTOR'S RESPONSE LETTER STATES
 THAT GRILL WAS REMOVED FROM PLANS, BUT DRAWING A-1
 SUBMITTED STILL SHOWS THE GRILL. REVISE AS REQUIRED.
  
 4- REVISE GARAGE NOTE #1 ON SHEET A-1. DOOR THICKNESS
 IS 1 AND 3/8" MIN. THICKNESS NOT 13/8" THICKNESS. SEE
 SEC. R309.1.
  
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561)805-6712

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2012-02-06 Cont ID  
Sent By lmartine Date 2012-01-26 Time 15:23 Rev Time 0.00
Received By lmartine Date 2011-12-21 Time 11:29 Sent To  
Notes
2011-12-22 09:22:3112/22 ROUTED TO R09
2011-12-21 11:29:41IN ZONING BOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2011-10-24 Cont ID  
Sent By lmartine Date 2011-09-08 Time 14:17 Rev Time 0.00
Received By lmartine Date 2011-08-19 Time 11:55 Sent To  
Notes
2011-08-19 11:55:24R8

Review Stop P PLUMBING
Rev No 1 Status P Date 2011-08-24 Cont ID  
Sent By jgomez Date 2011-08-24 Time 10:37 Rev Time 0.00
Received By jgomez Date 2011-08-24 Time 10:37 Sent To  
Notes
2011-08-24 10:38:25SEPARATE GAS PERMIT REQUIRED. PROVIDE COMPLETE
 INFORMATION AT TIME OF PERMIT APPLICATION.

Review Stop Z ZONING
Rev No 2 Status P Date 2012-01-26 Cont ID  
Sent By lfranco Date 2012-01-26 Time 19:18 Rev Time 0.50
Received By lfranco Date 2012-01-26 Time 19:18 Sent To  
Notes
2012-01-26 19:19:58PLANNING: PASSED WITH PROVISO: LANDSCAPE AND IRRIGATION
 PERMITS TO BE SUBMITTED AND APPROVED PRIOR TO FINAL
 BUILDING C.O. ****
  
  
 DRIVEWAY TO BE APPROVED BY ENGINEERING DEPARTMENT
  
  

Review Stop Z ZONING
Rev No 1 Status F Date 2011-09-08 Cont ID  
Sent By lfranco Date 2011-09-08 Time 20:47 Rev Time 0.00
Received By lfranco Date 2011-09-08 Time 20:47 Sent To  
Notes
2011-09-08 20:50:08PLANNING AND ZONING: **** FAILED *****
  
  
 ALL COMMENTS FROM MASTER PERMIT NOT ADDRESSED: THE
 MASTER PERMIT WAS APPROVED BY DOUG WISE UNDER THE
 CONDITION THAT THESE COMMENTS BE ADDRESSED. COMMENTS
 ARE STILL OUTSTANDING.
  
 1. RESPOND TO COMMENTS IN WRITING.
  
 2. PROVIDE TWO (2) COPIES OF A CURRENT SURVEY, WHICH
 INCLUDES THE PROPERTY'S ADDRESS AND LEGAL DESCRIPTION.
 (THE SURVEY SUBMITTED DOES NOT HAVE THE PROPERTY'S
 ADDRESS).
  
 3. PURSUANT TO SECTION 94-72(A)(3) OF THE ZONING AND
 LAND DEVELOPMENT REGULATIONS ("ZLDR"): THE MAXIMUM
 BUILDING HEIGHT IS 30 FEET. THE PROPOSED HEIGHT IS
 34'-1". SECTION 94-306 HEIGHT EXCEPTIONS, ALLOWS
 CHIMNEYS AND DECORATIVE FEATURES MAY EXCEED DISTRICT
 HEIGHT REQUIREMENTS BY TEN PERCENT (10%). REVISE
 ELEVATIONS PLANS ACCORDINGLY.
  
 4. THE PROPOSED U-DRIVEWAY CAN NOT EXCEED 10 FEET IN
 WIDTH AT EACH ACCESS POINT (INGRESS EGRESS) THE
 PROPOSED PLANS DO NOT COMPLY.
  
  
 5. SEPARATE LANDSCAPE AND IRRIGATION PERMITS ARE
 REQUIRED. TWO COPIES OF THE LANDSCAPE PLAN AND A COST
 ESTIMATE THAT INCLUDES THE TOTAL COST OF ALL LANDSCAPE
 MATERIALS AND LABOR, BROKEN DOWN INTO UNIT COST SHALL
 BE SUBMITTED WITH THE LANDCAPE PERMIT APPLICATION. THE
 LANDSCAPE PLANS SHALL CONFORM TO THE APPLICABLE
 SECTIONS IN ARTICLE XIV, LANDSCAPING PROVISIONS.
  
 SUBMITTAL: PERMITS HAVE NOT BEEN SUBMITTED.
  
 6. SUBMIT TWO COPIES OF THE IRRIGATION PLAN WITH THE
 IRRIGATION PERMIT APPLICATION.
  
 7. PURSUANT TO SECTION 94-448 (D) (2), THE LANDSCAPE
 PLAN SHALL CONTAIN ALL OF THE ELEMENTS ENUMERATED IN
 THIS SECTION, INCLUDING BUT NOT LIMITED TO
 IDENTIFICATION OF ALL AIR CONDITIONING UNITS,
 GENERATORS AND ALL OTHER MECHANICAL EQUIPMENT. PLEASE
 PROVIDE THE LOCATION OF THESE ITEMS AND THE MANNER IN
 WHICH THEY WILL BE SCREENED.
  
 SUBMITTAL: PERMITS HAVE NOT BEEN SUBMITTED.
  
 IF YOU HAVE ANY QUESTIONS PLEASE CONTACT ME.
  
 LINDA MIA FRANCO, AICP
 SENIOR PLANNER
 PLANNING AND ZONING DEPARTMENT
 TEL: (561) 822-1443
 EMAIL: [email protected]
  
  
  
  
  
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved