| 2011-08-11 15:57:08 | BUILDING PLAN REVIEW |
| | PERMIT: 11080083 |
| | ADD: 4200 N FLAGLER |
| | CONT: BENCHMARK III CORP. |
| | TEL: (561)722-5095 |
| | |
| | 2007 FLORIDA BUILDING CODE W/ 2009 FBC SUPPLEMENTS |
| | * WEST PALM BEACH AMENDMENTS |
| | |
| | BUILDING APPROVED WITH EXCEPTION! |
| | THIS PLAN HAS BEEN APPROVED PROVISIONALLY. FAILURE TO |
| | CORRECT THE LISTED DEFICIENCIES IN THIS PLAN PRIOR TO |
| | INSPECTION WILL RESULT IN FAILED INSPECTION(S) AND THE |
| | ASSESSMENT OF RE-INSPECTION FEE(S). REVISIONS REQUIRE |
| | ADDITIONAL REVIEWS WITH ASSOCIATED FEES. |
| | |
| | 1) 105.13. SPECIAL FOUNDATION PERMIT |
| | WHEN APPLICATION FOR A PERMIT TO ERECT OR ENLARGE A |
| | BUILDING HAS BEEN FILED, & PENDING ISSUANCE OF SUCH |
| | PERMIT, THE BUILDING OFFICIAL MAY, AT HIS/ HER |
| | DISCRETION, ISSUE A SPECIAL PERMIT FOR THE FOUNDATION |
| | ONLY, UPON WRITTEN REQUEST OF THE OWNER AND CONTRACTOR. |
| | THE HOLDER OF SUCH A SPECIAL PERMIT IS PROCEEDING AT |
| | HIS OR HER OWN RISK AND WITHOUT ASSURANCE THAT A PERMIT |
| | FOR THE REMAINDER OF THE WORK WILL BE GRANTED AND THAT |
| | CORRECTIONS WILL NOT BE REQUIRED IN ORDER TO MEET THE |
| | PROVISIONS OF THE TECHNICAL CODE. |
| | |
| | 2) COUNTY IMPACT FEE OFFICE HAS AGREED TO ALLOW THE |
| | IMPACT FEE ASSESSMENT TO BE PAID AT TIME OF PERMIT FOR |
| | THE BUILDING BEFORE ISSUANCE OF THE BUILDING PERMIT. |
| | |
| | 3) 2007 FBC-B 1802.4-6 QUESTIONABLE SOILS. AT THIS TIME |
| | NO SOILS REPORTS HAVE BEEN TURNED IN. IT WILL BE |
| | REQUIRED AT TIME OF THE FOUNDATION INSPECTION THE |
| | INSPECTOR TO RECEIVE A SIGNED & SEALED ORIGINAL REPORT |
| | FROM THE STUDY COMPLETED BY DUNKLEBERGER ENGINEERING & |
| | TESTING, INC. |
| | |
| | 4) FBC BUILDING 3110.1.2 / CITY OF WPB CODE OF |
| | ORDINANCES SECTION 94-546. STRUCTURE IS LOCATED IN AN |
| | "A" FLOOD ZONE. A FLOOD ELEVATION CERTIFICATE WILL BE |
| | REQUIRED. |
| | |
| | FEMA FORM OMB NO. 1660-0008 EXPIRES: MARCH 31, 2012. |
| | FEMA'S NEW ELEVATION CERTIFICATE (EC) WAS APPROVED FOR |
| | USE, EFFECTIVE MARCH 16, 2009, THROUGH MARCH 31, 2012. |
| | THE NEW EC WILL BE PHASED IN ON A VOLUNTARY BASIS UNTIL |
| | MARCH 31, 2010. ALTHOUGH THE OLD VERSION OF THE FORM IS |
| | NO LONGER AVAILABLE FOR DISTRIBUTION, EXISTING COPIES |
| | MAY BE USED UNTIL MARCH 31, 2010. ELEVATIONS CERTIFIED |
| | ON OR AFTER APRIL 1, 2010, MUST BE SUBMITTED ON THE NEW |
| | FORM. |
| | |
| | JAMES A. WITMER CBO |
| | SENIOR COMMERCIAL COMBINATION PLANS EXAMINER |
| | TEL: 561-805-6715 |
| | FAX: 561-805-6676 |
| | E-MAIL: [email protected] |
| | |