| Plan Review Stops For Permit 11070251 |
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2011-07-13 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2011-07-13 |
Time |
10:42 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2011-07-12 |
Time |
18:14 |
Sent To |
|
|
| Notes |
| 2011-07-12 18:14:11 | TO RM DESK | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2011-07-13 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2011-07-13 |
Time |
10:42 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2011-07-13 |
Time |
10:42 |
Sent To |
|
|
| Notes |
| 2011-07-13 11:09:46 | 2007 FBC W/2009 REVISIONS | | | | | | MECHANICAL REVISION DENIED | | | | | | 1) SUBMIT TWO SETS OF REVISED ENERGY CALCULATIONS AND | | | EQUIPMENT SIZING CALCULATIONS THAT CORRESPOND TO THE | | | REVISED 13 SEER EQUIPMENT. THE PREVIOUSLY APPROVED | | | EQUIPMENT CONSISTED OF TWO 5 TON AND A 1.5 TON SYSTEMS, | | | ALL WERE 14 SEER. | | | | | | 2) ON SHEET M-1, CU-2 IS SPECIFIED AS THE 2 TON UNIT | | | AND IN THE EQUIPMENT SCHEDULE ON SHEET M-3, CU-3 IS | | | SPECIFIED AS THE 2 TON UNIT. PLEASE CLARIFY. | | | | | | 3) THE CFM IS NOT SPECIFIED AT TWO OF THE SUPPLY | | | OUTLETS IN THE SECOND FLOOR SITTING/OFFICE. | | | | | | ROBERT MCDOUGAL | | | BLDG. PLAN REVIEW | | | (561)805-6714 | | | [email protected] |
|
|
|