Plan Review Stops For Permit 11060472
Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2012-07-13 Cont ID  
Sent By mdekle Date 2012-07-09 Time 10:27 Rev Time 0.00
Received By mdekle Date 2012-07-09 Time 10:29 Sent To  
Notes
2012-07-03 16:49:29TO ZONING BIN

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2012-07-13 Cont ID  
Sent By mdekle Date 2012-06-21 Time   Rev Time 0.00
Received By mdekle Date 2012-06-08 Time 11:52 Sent To  
Notes
2012-06-08 11:52:18TO ZONING

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2012-06-08 Cont ID  
Sent By rlecky Date 2011-06-21 Time 11:50 Rev Time 0.00
Received By rlecky Date 2011-06-20 Time 16:28 Sent To  
Notes
2011-06-20 16:28:55SENT TO ZONING SHELF FOR LANDSCAPE REVIEW.

Review Stop L LANDSCAPING
Rev No 3 Status N Date 2012-07-13 Cont ID  
Sent By mdekle Date 2012-07-09 Time 10:28 Rev Time 0.00
Received By mdekle Date 2012-07-09 Time 10:29 Sent To  
Notes
***NONE***

Review Stop L LANDSCAPING
Rev No 2 Status F Date   Cont ID  
Sent By   Date 2012-06-25 Time   Rev Time 0.00
Received By mdekle Date 2012-06-22 Time 13:34 Sent To  
Notes
2012-06-27 10:17:286/27/12 - SPOKE W/BRIAN W/TECKTONIC REGARDING
 OUTSTANDING COMMENTS.
2012-06-22 13:36:066/22/12 - THE APPLICANT MUST INCLUDE LANDSCAPING SITE
 DATA WHICH INCLUDES REQUIRED VS PROPOSED LANDSCAPING
 CALCULATIONS.

Review Stop L LANDSCAPING
Rev No 1 Status F Date 2011-06-21 Cont ID  
Sent By rkussner Date 2011-06-21 Time 10:51 Rev Time 0.00
Received By rkussner Date 2011-06-21 Time 10:51 Sent To  
Notes
2011-06-21 10:52:29***LANDSCAPE REVIEW FAILED***
  
 PLEASE RESPOND TO REVIEW COMMENTS IN WRITTEN FORMAT.
  
 1. PLEASE SUBMIT TWO SETS OF LANDSCAPE PLANS AND A
 CERTIFIED COST ESTIMATE THAT INCLUDES THE TOTAL COST OF
 ALL LANDSCAPE MATERIALS AND LABOR, BROKEN DOWN INTO
 UNIT COST.
  
 2. PLEASE PROVIDE THE TABULATION NECESSARY FOR THE
 EVALUATION OF COMPLIANCE WITH ARTICLE XIV OF THE ZONING
 AND LAND DEVELOPMENT REGULATIONS, INCLUDING THE
 XERISCAPE DESIGN OPTIONS.
  
 3. PURSUANT TO SECTION 94-445 (4) (G) (3) (II), THE
 IRRIGATION SYSTEM SHALL BE DESIGNED TO HAVE 120 PERCENT
 COVERAGE TO ALL LANDSCAPED AREAS, INCLUDING THE
 RIGHT-OF-WAY. PLEASE APPLY FOR A SEPARATE IRRIGATION
 PERMIT AND SUBMIT TWO SETS OF IRRIGATION PLANS.
  
 4. PURSUANT TO SECTION 94-448 (D) (2), THE LANDSCAPE
 PLAN SHALL INCLUDE ALL OF THE ITEMS ENUMERATED IN THIS
 SECTION. THE SPACING OF ALL PROPOSED PLANT MATERIAL
 SHALL BE INCLUDED ON THE PLANT LIST.
  
 5. STAFF RECOMMENDS THAT FOUNDATION LANDSCAPING BE
 INSTALLED ALONG THE FRONT BUILDING ELEVATION AND THAT
 THE PROPOSED HEDGE BE PLANTED ALONG THE NORTH EDGE OF
 THE DRIVEWAY, INSTEAD OF ALONG THE CITY SIDEWALK.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT ROBERT
 KUSSNER @ (561) 822-1462
  

Review Stop Z ZONING
Rev No 2 Status P Date   Cont ID  
Sent By   Date 2012-07-09 Time   Rev Time 0.00
Received By   Date 2012-07-09 Time   Sent To  
Notes
2012-07-09 13:38:347/9/12 - ZONING APPROVED - GIVEN TO LM FOR PROCESSING -
 MD

Review Stop Z ZONING
Rev No 1 Status N Date 2012-06-27 Cont ID  
Sent By mdekle Date 2012-06-25 Time   Rev Time 0.00
Received By mdekle Date 2012-06-20 Time 15:56 Sent To  
Notes
***NONE***