Plan Review Details - Permit 11040655
| Plan Review Stops For Permit 11040655 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2011-05-10 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2011-05-10 |
Time |
09:38 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2011-05-10 |
Time |
09:38 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2011-05-03 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2011-05-03 |
Time |
14:22 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2011-05-03 |
Time |
14:22 |
Sent To |
|
|
| Notes |
| 2011-05-03 14:27:42 | ****CORRECTIONS**** | | | SAMANTHA HILL, BUILDING PLANS EXAMINER | | | 561-805-6724 [email protected] | | | FBC FLORIDA BUILDING CODE 2007 | | | FBC R FLORIDA BUILDING CODE 2007 RESIDENTIAL | | | | | | 1. ANCHOR SPACING DOES NOT COMPLY WITH PRODUCT APPROVAL | | | FOR SEVERAL OPENINGS. FOR INSTANCE, SEE OPENING 7. ALL | | | OTHER 83" SPAN OPENINGS WITH SAME CONDITIONS HAVE 10" | | | SPECIFIED, BUT 12" IS PROPOSED FOR OPENING #7. 10" IS | | | PROPOSED FOR CONNECTION TYPE D, BUT 8" IS REQUIRED FOR | | | OPENINGS 2, 5, 6, 7. CONNECTION TYPE L FOR A 103" SPAN, | | | TAPCONS REQUIRES 5" ANCHOR SPACING, 10" PROPOSED. | | | | | | THESE ARE EXAMPLES. PLEASE CHECK ALL. RESUBMITTAL MAY | | | BE DONE VIA EMAIL FOR THIS PROJECT ONLY. PLEASE HAVE | | | THE QUALIFIER REVIEW PRIOR TO RESUBMITTAL. | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2011-04-27 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2011-04-27 |
Time |
15:59 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2011-04-27 |
Time |
15:59 |
Sent To |
|
|
| Notes |
| 2011-04-27 16:29:37 | ****CORRECTIONS**** | | | SAMANTHA HILL, BUILDING PLANS EXAMINER | | | 561-805-6724 [email protected] | | | FBC FLORIDA BUILDING CODE 2007 | | | FBC R FLORIDA BUILDING CODE 2007 RESIDENTIAL | | | | | | 1. ON THE INSTALLATION SCHEDULE, SHUTTER MOUNTING | | | CONNECTION TYPE COLUMN, PLEASE SPECIFY WHICH WALL | | | MOUNTING TYPE WILL BE USED, TOP AND BOTTOM. ANCHOR | | | SPACING DOES NOT COMPLY FOR MOUNTING TYPE D, WHICH IS | | | HIGHLIGHTED ON THE PRODUCT APPROVAL. | | | | | | 2. ON THE INSTALLATION SCHEDULE, SUBSTRATE, PLEASE | | | SPECIFY SUBSTRATE. THIS TYPE OF CONSTRUCTION TYPICALLY | | | DICTATES A CONCRETE TOP SUBSTRATE, BLOCK BOTTOM | | | SUBSTRATE. NOTE THAT WALL MOUNT TYPE A REQUIRES | | | CONCRETE SUBSTRATE. | | | | | | 3. TAPCON SPECIFIED, BUT THE PRODUCT APPROVAL HAS | | | ANCHOR SPACING FOR ALL POINTS SOLID SET HIGHLIGHTED. | | | ANCHOR SPACING IS GENERALLY MORE STRINGENT FOR TAPCONS, | | | SEE SHEET 13. | | | | | | | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2011-05-10 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2011-05-10 |
Time |
09:39 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2011-05-05 |
Time |
15:34 |
Sent To |
|
|
| Notes |
| 2011-05-05 15:35:12 | GAVE TO SAMANTHA |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2011-05-03 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2011-05-03 |
Time |
14:27 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2011-05-02 |
Time |
17:25 |
Sent To |
|
|
| Notes |
| 2011-05-02 17:25:39 | TO SH DESK |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2011-04-27 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2011-04-27 |
Time |
16:32 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2011-04-26 |
Time |
14:33 |
Sent To |
|
|
| Notes |
| 2011-04-26 14:33:35 | TO MISC 1 | | | |
|
|
|