| Plan Review Stops For Permit 11040092 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2011-05-26 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2011-05-26 |
Time |
08:11 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2011-05-26 |
Time |
08:11 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2011-04-20 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2011-04-20 |
Time |
09:04 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2011-04-19 |
Time |
14:58 |
Sent To |
|
|
| Notes |
| 2011-04-20 09:04:48 | 2007 FBC W/2009 REVISIONS | | | | | | DENIED BY BUILDING | | | | | | 1) THE STRUCTURE IS LOCATED IN EXPOSURE CATEGORY C, | | | HOWEVER, THE ENGINEER'S LETTER SPECIFIES EXPOSURE B. | | | PLEASE CORRECT. | | | | | | 2) REVISE THE COMPONENT AND CLADDING PRESSURES FOR 140 | | | MPH, 3 SECOND, EXPOSURE C WITH A MEAN ROOF HEIGHT OF | | | 22'-8". | | | | | | 3) PLEASE CLARIFY THE SCOPE OF WORK. THE ENGINEER'S | | | LETTER INDICATES THAT ONE WINDOW IS REPLACED AND ONE | | | WINDOW IS BEING REPLACED WITH GLASS BLOCK. THE PRODUCT | | | APPROVALS THAT WERE SUBMITTED ARE FOR GLASS BLOCK, | | | SINGLE HUNG WINDOWS, HORIZONTAL SLIDING WINDOWS, FIXED | | | WINDOWS, STRUCTURAL MULLIONS AND FRENCH DOORS. THE | | | HOUSE PLANS DO NOT INDICATE A HORIZONTAL SLIDING | | | WINDOW. | | | | | | 4) PLEASE SPECIFY WHICH WINDOWS AND DOORS ARE BEING | | | REPLACED AND PROVIDE THE COMPONENT AND CLADDING | | | PRESSURES FOR THE OPENINGS. | | | | | | ROBERT MCDOUGAL | | | BLDG. PLAN REVIEW | | | (561)805-6714 | | | [email protected] |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2011-04-05 |
|
|
Cont ID |
|
| Sent By |
rlecky |
Date |
2011-04-05 |
Time |
09:47 |
Rev Time |
0.00 |
| Received By |
rlecky |
Date |
2011-04-05 |
Time |
09:37 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2011-05-26 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2011-05-26 |
Time |
08:12 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2011-05-11 |
Time |
17:18 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2011-04-20 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2011-04-20 |
Time |
09:05 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2011-04-05 |
Time |
08:53 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
3 |
Status |
N |
Date |
2011-05-26 |
|
|
Cont ID |
|
| Sent By |
lmartine |
Date |
2011-05-26 |
Time |
08:22 |
Rev Time |
0.00 |
| Received By |
lmartine |
Date |
2011-05-26 |
Time |
08:22 |
Sent To |
|
|
| Notes |
| 2011-05-26 08:24:05 | SEE PERMIT #11050743 FOR LANDSCAPE . LM |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
2 |
Status |
F |
Date |
2011-05-20 |
|
|
Cont ID |
|
| Sent By |
rkussner |
Date |
2011-05-20 |
Time |
16:38 |
Rev Time |
0.00 |
| Received By |
rkussner |
Date |
2011-05-20 |
Time |
16:38 |
Sent To |
|
|
| Notes |
| 2011-05-20 16:51:02 | **LANDSCAPE REVIEW FAILED*** | | | | | | PLEASE RESPOND TO REVIEW COMMENTS IN WRITTEN FORMAT. | | | | | | 1. REPEAT COMMENT: A SEPARATE LANDSCAPE PERMIT IS | | | REQUIRED. PLEASE SUBMIT AN APPLICATION, TWO SETS OF | | | LANDSCAPE PLANS AND A CERTIFIED COST ESTIMATE THAT | | | INCLUDES THE TOTAL COST OF ALL LANDSCAPE MATERIALS AND | | | LABOR, BROKEN DOWN INTO UNIT COST. | | | | | | 2 PLEASE PROVIDE THE TABULATION NECESSARY FOR THE | | | EVALUATION OF COMPLIANCE WITH ARTICLE XIV OF THE ZONING | | | AND LAND DEVELOPMENT REGULATIONS, INCLUDING THE | | | XERISCAPE DESIGN OPTIONS. THE REQUIRED NUMBER OF TREES | | | REQUIRED IS BASED UPON OPEN SPACE. THAT IS DETERMINED | | | BY TAKING THE TOTAL SQUARE FOOTAGE OF THE LOT AND | | | DEDUCTING THE FOOTPRINT OF THE STRUCTURE. THE | | | DIFFERENCE IS OPEN SPACE. THE OPEN SPACE ON THIS LOT IS | | | 4562 SQUARE FEET. FOUR TREES ARE REQUIRED. ONE SHRUB IS | | | REQUIRED FOR EVERY 500 SQUARE FEET OF OPEN SPACE. | | | PLEASE PROVIDE THAT TABULATION. | | | | | | 3. PURSUANT TO SECTION 94-448 (D) (2), ALL OF THE ITEMS | | | ENUMERATED IN THIS SECTION SHALL BE PART OF THE | | | LANDSCAPE PLAN. ALL OF THE NEW AND EXISTING TREES AND | | | SHRUBS SHALL BE IDENTIFIED BY QUANTITY, SIZE AND | | | SPACING. TO BE COUNTED THEY MUST BE IN GOOD CONDITION. | | | THE SOD SHALL ALSO BE IN GOOD CONDITION. PLANT MATEIRAL | | | ON NEIGHBORING PROPERTY CANNOT BE COUNTED TOWARD | | | MEETING THE REQUIREMENTS. PLEASE INCLUDE A PLANT LIST | | | ON THE PLAN TO IDENTIFY WHAT IS EXISTING AND PROPOSED. | | | | | | 3. REPEAT COMMENT: A SEPARATE IRRIGATION PERMIT IS | | | REQUIRED IF THERE ARE MODIFICATIONS MADE TO AN EXISTING | | | SYSTEM OR IF A NEW SYSTEM WILL BE INSTALLED. THE | | | IRRIGATION SYSTEM MUST PROVIDE 120 PERCENT COVERAGE TO | | | ALL LANDCAPED AREAS, INCLUDING THE RIGHT-OF-WAY. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT ROBERT | | | KUSSNER @ (561) 822-1462, | | | | | | . |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
1 |
Status |
F |
Date |
2011-04-12 |
|
|
Cont ID |
|
| Sent By |
rkussner |
Date |
2011-04-12 |
Time |
15:56 |
Rev Time |
0.00 |
| Received By |
rkussner |
Date |
2011-04-12 |
Time |
15:56 |
Sent To |
|
|
| Notes |
| 2011-04-12 16:18:29 | ***LANDSCAPE REVIEW FAILED*** | | | | | | PLEASE RESPOND TO REVIEW COMMENTS IN WRITTEN FORMAT. | | | | | | 1. PURSUANT TO SECTION 94-441(C)(2) OF THE ZONING AND | | | LAND DEVELOPMENT REGULATIONS (ZLDR): AS THE VALUE OF | | | THE PROPOSED WORK EXCEEDS 50% OF THE STRUCTURE'S VALUE | | | (LISTED AS "IMPROVEMENT VALUE" WITH THE P.B.C. PROPERTY | | | APPRAISER'S OFFICE), LANDSCAPING SHALL BE IN COMPLIANCE | | | WITH ALL APPLICABLE REGULATIONS FOUND IN ARTICLE XIV OF | | | THE ZLDR. | | | | | | 2. PLEASE SUBMIT TWO (2) COPIES OF A LANDSCAPE PLAN | | | SHOWING COMPLIANCE WITH SECTIONS 94-442 AND 94-445 OF | | | THE ZLDR. EXISTING LANDSCAPING CAN BE COUNTED TOWARD | | | MEETING THE REQUIREMENTS PROVIDED THAT THE TREES AND | | | SHRUBS MEET ALL STANDARDS SET IN THE CODE. | | | | | | 3. A SEPARATE LANDSCAPE PERMIT IS REQUIRED. PLEASE | | | SUBMIT AN APPLICATION, TWO SETS OF LANDSCAPE PLANS AND | | | A CERTIFIED COST ESTIMATE THAT INCLUDES THE TOTAL COST | | | OF ALL LANDSCAPE MATERIALS AND LABOR, BROKEN DOWN INTO | | | UNIT COST. PLEASE NOTE THAT IF YOU HAVE AN EXISTING | | | LANDSCAPE PLAN OF RECORD, YOU CAN SUBMIT THAT IN LIEU | | | OF A NEW PLAN SHOULD RESTORATION IS REQUIRED. | | | | | | 4. PLEASE PROVIDE THE TABULATION NECESSARY FOR THE | | | EVALUATION OF COMPLIANCE WITH ARTICLE XIV OF THE ZONING | | | AND LAND DEVELOPMENT REGULATIONS, INCLUDING THE | | | XERISCAPE DESIGN OPTIONS. | | | | | | 5. A SEPARATE IRRIGATION PERMIT IS REQUIRED IF THERE | | | ARE MODIFICATIONS MADE TO AN EXISTING SYSTEM OR IF A | | | NEW SYSTEM WILL BE INSTALLED. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT ROBERT | | | KUSSNER @ (561) 822-1462, | | | | | | . | | | | | | | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2011-05-26 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2011-05-26 |
Time |
08:10 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2011-05-26 |
Time |
08:10 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2011-04-18 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2011-04-18 |
Time |
14:46 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2011-04-18 |
Time |
14:46 |
Sent To |
|
|
| Notes |
| 2011-04-18 14:54:46 | 2007 FBC W/2009 REVISIONS | | | | | | DENIED BY MECHANICAL | | | | | | 1) SUBMIT 2 SETS OF ENERGY CALCULATIONS AND EQUIPMENT | | | SIZING CALCULATIONS FOR THE NEW HVAC SYSTEM. | | | | | | 2) SUBMIT TWO SETS OF HVAC PLANS. SPECIFY THE DUCT | | | SIZES, GRILL SIZES, CFMS AT EACH DROP, RETURN SIZES, | | | TRANSFER DUCTS/GRILLS, EQUIPMENT LOCATION, ETC. PROVIDE | | | AN EQUIPMENT SCHEDULE ON THE PLANS. | | | | | | ROBERT MCDOUGAL | | | BLDG. PLAN REVIEW | | | (561)805-6714 | | | [email protected] |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2011-05-26 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2011-05-26 |
Time |
08:11 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2011-05-26 |
Time |
08:11 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2011-04-18 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2011-04-18 |
Time |
11:17 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2011-04-18 |
Time |
11:17 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2011-05-23 |
|
|
Cont ID |
|
| Sent By |
astelly |
Date |
2011-05-23 |
Time |
11:25 |
Rev Time |
0.00 |
| Received By |
astelly |
Date |
2011-05-23 |
Time |
11:25 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2011-04-08 |
|
|
Cont ID |
|
| Sent By |
astelly |
Date |
2011-04-08 |
Time |
15:32 |
Rev Time |
0.00 |
| Received By |
astelly |
Date |
2011-04-08 |
Time |
15:32 |
Sent To |
|
|
| Notes |
| 2011-04-08 15:43:16 | AMY STELLY | | | PLANNING AND ZONING | | | 561-822-1442 | | | | | | SINCE THE VALUE OF THE REPAIR EXCEEDS 50% OF THE VALUE | | | OF THE STRUCTURE, A LANDSCAPE PLAN MUST BE SUBMITTED IN | | | ACCORDANCE WITH SEC. 94-441 OF THE ZONING CODE. YOUR | | | RESUBMISSION MAY GENERATE ADDITIONAL COMMENTS. |
|
|