Plan Review Details - Permit 11030199
Plan Review Stops For Permit 11030199
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2011-05-04 Cont ID  
Sent By lmartine Date 2011-05-04 Time 09:36 Rev Time 0.00
Received By lmartine Date 2011-05-04 Time 09:29 Sent To  
Notes
2011-05-04 09:34:22PROVIDE 2 SETS OF PLANS FOR PERMIT ISSUE AND A SIGNED
 PERMIT APPLICATION FROM A LICENSED CONTRACTOR.
  
  
  
 LUIS MARTINEZ
 561-805-6710

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2011-03-14 Cont ID  
Sent By rlecky Date 2011-03-14 Time 10:48 Rev Time 0.00
Received By rlecky Date 2011-03-14 Time 10:36 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2011-05-02 Cont ID  
Sent By mgonzale Date 2011-05-02 Time   Rev Time 0.00
Received By mgonzale Date 2011-05-02 Time   Sent To  
Notes
2011-05-02 13:41:07PASSED WITH PROVISO:
  
 #1 COORDINATE WITH ROW DEPARTMENT FOR EACH INSTALL.
  
 #2 CALL 811 BEFORE DIGG.
  
 #3 PROVIDE AS-BUILT SET ON LAST REVISION TO ENGINEERING
 SERVICES DEPT.
  
 #4 CONTRATOR TOO COORDINATE EACH INSTALL WITH PARKING
 ADMIN AND PROPER
 NOTIFICATION TO BUSINESSES IMPACTED BY EACH INSTALL.
  
  
 *******************************************************
 ***********
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2011-05-04 Cont ID  
Sent By lmartine Date 2011-05-02 Time 09:07 Rev Time 0.00
Received By lmartine Date 2011-03-09 Time 12:26 Sent To  
Notes
2011-03-14 11:02:373/14/11 ONLY ONE SET OF PLANS. RL
2011-03-09 12:26:58INCOMING SENT TO ELECTRIC BOX. JW

Review Stop P PLUMBING
Rev No 1 Status P Date 2011-04-01 Cont ID  
Sent By lwagner Date 2011-04-01 Time 13:45 Rev Time 0.00
Received By lwagner Date 2011-04-01 Time 13:15 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2011-03-30 Cont ID  
Sent By aaponte Date 2011-03-30 Time 15:09 Rev Time 0.00
Received By aaponte Date 2011-03-30 Time 15:09 Sent To  
Notes
2011-03-30 16:05:37GENERAL COMMENTS FOR DISCUSSION:
 1. 500 BLOCK- DO WE WANT TO REMOVE THE 2 OAKS IN FRONT
 OF THE PARKING GARAGE AND REPLACE THEM WITH
 WASHINGTONIANS PALMS TO BE CONSISTENT? IT SEEMS WE
 COULD EVEN HAVE ONE ADDITIONAL PLANTER.
 2. THE NEW PLANTER IN FRONT OF THE PARKING GARAGE IS
 BLOCKING PEDESTRIAN CROSSING FOR THE PROPOSED
 PEDESTRIAN CROSSING ON THE WEST SIDE OF QUADRILLE. IN
 THE FUTURE IT WILL WORK AS A NORTH-SOUTH CONNECTION.
 3. I SUGGEST NOT TO HAVE THE BREAK ON THE PLANTER AT
 CLEMATIS AND DIXIE, AND MOVE THE BIKE RACKS TO THE
 DIXIE SIDE. I THINK THERE IS ENOUGH SPACE.
 4. IT SEEMS THERE IS SOME SPACE TO INSTALL NEW BIKE
 RACKS ON THE NE CORNER OF CLEMATIS AND OLIVE, BETWEEN
 THE CURB AND THE TRAFFIC BOX.