Plan Review Details - Permit 11030199
| Plan Review Stops For Permit 11030199 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2011-05-04 |
|
|
Cont ID |
|
| Sent By |
lmartine |
Date |
2011-05-04 |
Time |
09:36 |
Rev Time |
0.00 |
| Received By |
lmartine |
Date |
2011-05-04 |
Time |
09:29 |
Sent To |
|
|
| Notes |
| 2011-05-04 09:34:22 | PROVIDE 2 SETS OF PLANS FOR PERMIT ISSUE AND A SIGNED | | | PERMIT APPLICATION FROM A LICENSED CONTRACTOR. | | | | | | | | | | | | LUIS MARTINEZ | | | 561-805-6710 |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2011-03-14 |
|
|
Cont ID |
|
| Sent By |
rlecky |
Date |
2011-03-14 |
Time |
10:48 |
Rev Time |
0.00 |
| Received By |
rlecky |
Date |
2011-03-14 |
Time |
10:36 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
P |
Date |
2011-05-02 |
|
|
Cont ID |
|
| Sent By |
mgonzale |
Date |
2011-05-02 |
Time |
|
Rev Time |
0.00 |
| Received By |
mgonzale |
Date |
2011-05-02 |
Time |
|
Sent To |
|
|
| Notes |
| 2011-05-02 13:41:07 | PASSED WITH PROVISO: | | | | | | #1 COORDINATE WITH ROW DEPARTMENT FOR EACH INSTALL. | | | | | | #2 CALL 811 BEFORE DIGG. | | | | | | #3 PROVIDE AS-BUILT SET ON LAST REVISION TO ENGINEERING | | | SERVICES DEPT. | | | | | | #4 CONTRATOR TOO COORDINATE EACH INSTALL WITH PARKING | | | ADMIN AND PROPER | | | NOTIFICATION TO BUSINESSES IMPACTED BY EACH INSTALL. | | | | | | | | | ******************************************************* | | | *********** | | | MANUEL JULIAN GONZALEZ | | | ENGINEERING PROJECT COORDINATOR | | | ENGINEERING SERVICES DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 | | | DIRECT: (561) 494-1085 | | | FAX: (561) 494-1116 | | | MOBILE: (561) 644-7301 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2011-05-04 |
|
|
Cont ID |
|
| Sent By |
lmartine |
Date |
2011-05-02 |
Time |
09:07 |
Rev Time |
0.00 |
| Received By |
lmartine |
Date |
2011-03-09 |
Time |
12:26 |
Sent To |
|
|
| Notes |
| 2011-03-14 11:02:37 | 3/14/11 ONLY ONE SET OF PLANS. RL | | 2011-03-09 12:26:58 | INCOMING SENT TO ELECTRIC BOX. JW |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2011-04-01 |
|
|
Cont ID |
|
| Sent By |
lwagner |
Date |
2011-04-01 |
Time |
13:45 |
Rev Time |
0.00 |
| Received By |
lwagner |
Date |
2011-04-01 |
Time |
13:15 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2011-03-30 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
2011-03-30 |
Time |
15:09 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
2011-03-30 |
Time |
15:09 |
Sent To |
|
|
| Notes |
| 2011-03-30 16:05:37 | GENERAL COMMENTS FOR DISCUSSION: | | | 1. 500 BLOCK- DO WE WANT TO REMOVE THE 2 OAKS IN FRONT | | | OF THE PARKING GARAGE AND REPLACE THEM WITH | | | WASHINGTONIANS PALMS TO BE CONSISTENT? IT SEEMS WE | | | COULD EVEN HAVE ONE ADDITIONAL PLANTER. | | | 2. THE NEW PLANTER IN FRONT OF THE PARKING GARAGE IS | | | BLOCKING PEDESTRIAN CROSSING FOR THE PROPOSED | | | PEDESTRIAN CROSSING ON THE WEST SIDE OF QUADRILLE. IN | | | THE FUTURE IT WILL WORK AS A NORTH-SOUTH CONNECTION. | | | 3. I SUGGEST NOT TO HAVE THE BREAK ON THE PLANTER AT | | | CLEMATIS AND DIXIE, AND MOVE THE BIKE RACKS TO THE | | | DIXIE SIDE. I THINK THERE IS ENOUGH SPACE. | | | 4. IT SEEMS THERE IS SOME SPACE TO INSTALL NEW BIKE | | | RACKS ON THE NE CORNER OF CLEMATIS AND OLIVE, BETWEEN | | | THE CURB AND THE TRAFFIC BOX. |
|
|
|
Account Summary | Usage Policy | Privacy Policy