| Plan Review Stops For Permit 11020604 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2011-05-24 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2011-05-24 |
Time |
08:26 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2011-05-24 |
Time |
08:26 |
Sent To |
PC |
|
| Notes |
| 2011-05-24 08:27:45 | 5/23/11 RECEIVED PLANS FROM ERIC SNEIDER FOR | | | PROCESSING. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2011-04-13 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2011-04-13 |
Time |
14:27 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2011-04-13 |
Time |
14:27 |
Sent To |
PC |
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2011-03-08 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2011-03-08 |
Time |
12:15 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2011-03-08 |
Time |
12:15 |
Sent To |
|
|
| Notes |
| 2011-03-08 12:54:53 | RESIDENTIAL FIRE REPAIRS BUILDING REVIEW CHECKLIST. | | | 2007 FBC WITH 2009 REVISIONS. | | | | | | 1- DOOR AND WINDOWS DESIGN PRESSURES SHOWN ON PLANS ARE | | | TOO LOW. PROVIDE CALCULATIONS SHOWING HOW OBTAINING THE | | | DESIGN PRESSURES TO VERIFY COMPLIANCE WITH THE DESIGN | | | PRESSURES OF SEC. R301 OF 2007 FLORIDA RESIDENTIAL | | | CODE. | | | | | | 2- PROVIDE PRODUCT APPROVALS (2 COPIES) AS REQUIRED BY | | | DCA RULE 9B-72 FOR: | | | A) SINGLE HUNG WINDOWS. NOA 07-0402.04 SUBMITTED WAS | | | SUPERSEDED BY MIAMI-DADE. NEED TO PROVIDE CURRENT NOA. | | | VISIT THE MIAMI-DADE WEBSITE AND DOWNLOAD CURRENT NOA. | | | | | | B) WINDOW MULLIONS AS SHOWN ON PLANS. | | | | | | 3- ENGINEER OF RECORD TO REVIEW AND APPROVE IN WRITING | | | (NOT SIGNING AND SEALING) ALL PRODUCT APPROVALS AS | | | REQUIRED BY SEC. 106.3.3 CITY AMENDMENTS TO FBC. | | | ***NOTE: PRODUCT APPROVALS SUBMITTED ARE SIGNED AND | | | SEALED BY A DIFFERENT ENGINEER THAN THE ONE SHOWN ON | | | THE PLANS SUBMITTED. ALSO, NOA'S CAN'T BE SIGNED AND | | | SEALED BECAUSE THEY ARE THE WORK OF ANOTHER ENGINEER. | | | NEED ONLY TO REVIEW AND APPROVE IN WRITING. | | | | | | 4- REVISE WINDOW/BUCK DETAIL. BEVELED BUCKS ARE NOT | | | ALLOWED. NEED TO PROVIDE FULL SUPPORT TO THE | | | WINDOW/DOOR FRAME. SEE SEC. R613.6 OF 2007 FLORIDA | | | RESIDENTIAL CODE AND REVISE DETAIL AS REQUIRED. | | | | | | 5- ENGINEER OF RECORD TO SPECIFY THE ALTERATION TYPE AS | | | REQUIRED BY SEC. 401.4 OF 2007 FBC- EXISTING BUILDING. | | | | | | 6- ENGINEER TO SPECIFY CONSTRUCTION TYPE ON THE CODE | | | INFORMATION ON SHEET A-1. | | | | | | JULIO GOMEZ | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561)805-6712 | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2011-02-28 |
|
|
Cont ID |
|
| Sent By |
rlecky |
Date |
2011-02-28 |
Time |
15:18 |
Rev Time |
0.00 |
| Received By |
rlecky |
Date |
2011-02-28 |
Time |
15:03 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2011-05-24 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2011-05-24 |
Time |
08:28 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2011-05-18 |
Time |
15:13 |
Sent To |
|
|
| Notes |
| 2011-05-18 15:14:14 | INCOMING SENT TO ZONING. JW |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2011-03-23 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2011-03-23 |
Time |
08:34 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2011-03-23 |
Time |
08:34 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2011-03-11 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2011-03-11 |
Time |
15:07 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2011-02-25 |
Time |
08:41 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2011-03-08 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2011-03-08 |
Time |
14:31 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2011-03-08 |
Time |
14:31 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
P |
Date |
2011-05-23 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2011-05-23 |
Time |
08:44 |
Rev Time |
0.50 |
| Received By |
eschneid |
Date |
2011-05-19 |
Time |
14:41 |
Sent To |
|
|
| Notes |
| 2011-05-23 09:44:30 | PASSED | | | | | | 1) THE VALUE OF THE CONSTRUCTION ($63,404.83) EXCEEDS | | | 50% OF THE VALUE OF THE TOTAL OF THE FOUR STRUCTURES ON | | | THE PROPERTY ($124,442) ACCORDING TO THE P.B.C. | | | PROPERTY APPRAISER'S OFFICE WHICH MEANS THAT THE | | | CONSTRUCTION EXCEEDS 50% OF THE VALUE OF THE INDIVIDUAL | | | BUILDING BEING RENOVATED; THEREFORE, PURSUANT TO | | | SECTION 94-441(C)(2) OF THE ZONING AND LAND DEVELOPMENT | | | REGULATIONS (ZLDR), THE LANDSCAPE ON THE SITE SHALL BE | | | IN COMPLIANCE WITH ALL APPLICABLE REGULATIONS FOUND IN | | | ARTICLE XIV OF THE ZLDR. THE CONTRACTOR HAS STATED THAT | | | THE SITE DOES NOT CONFORM TO ARTICLE XIV; THEREFORE | | | LANDSCAPE PERMIT IS REQUIRED TO INSTALL THE REQUIRED | | | LANDSCAPE MATERIAL. | | | | | | 2) PRIOR TO THE THE FIRST INSPECTION, A SEPARATE | | | LANDSCAPE PERMIT AND IRRIGATION PERMIT SHALL BE | | | SUBMITTED SHOWING MATERIAL TO BRING THE SITE INTO | | | CONFORMITY. | | | | | | 3) PRIOR TO THE FINAL INSPECTION FOR THIS PERMIT, THE | | | MATERIAL SHOWN ON THE APPROVED LANDSCAPE PERMIT PLAN | | | SHALL BE INSTALLED AND HAVE RECEIVED THE LANDSCAPE | | | FINAL INSPECTION APPROVAL. | | | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
2011-03-25 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2011-03-25 |
Time |
13:25 |
Rev Time |
0.25 |
| Received By |
eschneid |
Date |
2011-03-25 |
Time |
13:25 |
Sent To |
|
|
| Notes |
| 2011-03-25 13:26:18 | FAILED - PREVIOUS ZONING COMMENTS NOT ADDRESSED. | | | | | | 1) REPEAT COMMENT - PROVIDE A RECENT SURVEY, LESS THAN | | | ONE YEAR OLD, OF THE PROPERTY. THE SURVEY SHALL | | | INDICATE WHICH BUILDING IS SUBJECT TO THIS PERMIT. | | | | | | 2) REPEAT COMMENT - THE VALUE OF THE CONSTRUCTION | | | ($63,404.83) EXCEEDS 50% OF THE VALUE OF THE TOTAL OF | | | THE FOUR STRUCTURES ON THE PROPERTY ($124,442) | | | ACCORDING TO THE P.B.C. PROPERTY APPRAISER'S OFFICE | | | WHICH MEANS THAT THE CONSTRUCTION EXCEEDS 50% OF THE | | | VALUE OF THE INDIVIDUAL BUILDING BEING RENOVATED; | | | THEREFORE, PURSUANT TO SECTION 94-441(C)(2) OF THE | | | ZONING AND LAND DEVELOPMENT REGULATIONS (ZLDR), THE | | | LANDSCAPE ON THE SITE SHALL BE IN COMPLIANCE WITH ALL | | | APPLICABLE REGULATIONS FOUND IN ARTICLE XIV OF THE | | | ZLDR. IF THE SITE CONFORMS TO ARTICLE XIV, THEN TWO (2) | | | COPIES OF A LANDSCAPE PLAN SHALL BE INCLUDED WITH THE | | | PERMIT RE-SUBMITTAL. IF THE SITE DOES NOT CONFORM TO | | | ARTICLE XIV, THEN PRIOR TO THE ZONING APPROVAL OF THIS | | | PERMIT A SEPARATE LANDSCAPE PERMIT AND IRRIGATION | | | PERMIT SHALL BE SUBMITTED SHOWING MATERIAL TO BRING THE | | | SITE INTO CONFORMITY. THE SURVEY REQUIRED IN COMMENT | | | NO. 1 SHALL BE USED AS A BASIS FOR THE CALCULATIONS FOR | | | THE REQUIRED LANDSCAPE. PLEASE CONTACT ROBERT KUSSNER, | | | LANDSCAPE PLANNER, AT (561) 822-1462 FOR QUESTIONS | | | REGARDING THE LANDSCAPE PLAN. | | | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2011-03-10 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2011-03-10 |
Time |
09:16 |
Rev Time |
0.75 |
| Received By |
eschneid |
Date |
2011-03-10 |
Time |
09:16 |
Sent To |
PC |
|
| Notes |
| 2011-03-10 11:49:15 | FAILED | | | | | | 1) PROVIDE A RECENT SURVEY, LESS THAN ONE YEAR OLD, OF | | | THE PROPERTY. THE SURVEY SHALL INDICATE WHICH BUILDING | | | IS SUBJECT TO THIS PERMIT. | | | | | | 2) THE VALUE OF THE CONSTRUCTION ($63,404.83) EXCEEDS | | | 50% OF THE VALUE OF THE TOTAL OF THE FOUR STRUCTURES ON | | | THE PROPERTY ($124,442) ACCORDING TO THE P.B.C. | | | PROPERTY APPRAISER'S OFFICE WHICH MEANS THAT THE | | | CONSTRUCTION EXCEEDS 50% OF THE VALUE OF THE INDIVIDUAL | | | BUILDING BEING RENOVATED; THEREFORE, PURSUANT TO | | | SECTION 94-441(C)(2) OF THE ZONING AND LAND DEVELOPMENT | | | REGULATIONS (ZLDR), THE LANDSCAPE ON THE SITE SHALL BE | | | IN COMPLIANCE WITH ALL APPLICABLE REGULATIONS FOUND IN | | | ARTICLE XIV OF THE ZLDR. IF THE SITE CONFORMS TO | | | ARTICLE XIV, THEN TWO (2) COPIES OF A LANDSCAPE PLAN | | | SHALL BE INCLUDED WITH THE PERMIT RE-SUBMITTAL. IF THE | | | SITE DOES NOT CONFORM TO ARTICLE XIV, THEN PRIOR TO THE | | | ZONING APPROVAL OF THIS PERMIT A SEPARATE LANDSCAPE | | | PERMIT AND IRRIGATION PERMIT SHALL BE SUBMITTED SHOWING | | | MATERIAL TO BRING THE SITE INTO CONFORMITY. THE SURVEY | | | REQUIRED IN COMMENT NO. 1 SHALL BE USED AS A BASIS FOR | | | THE CALCULATIONS FOR THE REQUIRED LANDSCAPE. PLEASE | | | CONTACT ROBERT KUSSNER, LANDSCAPE PLANNER, AT (561) | | | 822-1462 FOR QUESTIONS REGARDING THE LANDSCAPE PLAN. | | | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446. |
|
|