Plan Review Details - Permit 11020451
Plan Review Stops For Permit 11020451
Review Stop E ELECTRICAL
Rev No 2 Status P Date 2011-06-03 Cont ID  
Sent By jleahy Date 2011-06-03 Time 08:00 Rev Time 0.00
Received By jleahy Date 2011-06-03 Time 08:00 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2011-02-22 Cont ID  
Sent By rlecky Date 2011-02-22 Time 10:38 Rev Time 0.00
Received By rlecky Date 2011-02-22 Time 10:36 Sent To  
Notes
2011-02-22 10:37:51PENDING ENGINEERING APPROVAL.

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2011-03-25 Cont ID  
Sent By mgonzale Date 2011-03-25 Time   Rev Time 0.50
Received By mgonzale Date 2011-03-25 Time   Sent To  
Notes
2011-03-25 08:32:27PASSED WITH PROVISO:
  
 CALL 811 BEFORE DIGG
 8" CAST IRON WATERMAIN IN THE VICINITY
 AS SKETCHED ON PLAN, FIELD LOCATE AND
 VERIFY.
  
 CABINET CANNOT BE PLACED DIRECTLY ON TOP OF WATERMAIN.
  
 MAINTAIN 5'+ MIN DISTANCE FROM WM.
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
  
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2011-04-05 Cont ID  
Sent By shill Date 2011-04-05 Time 07:53 Rev Time 0.00
Received By shill Date 2011-02-17 Time 17:17 Sent To  
Notes
2011-02-17 17:21:17SENT TO ELECTRICAL UNDER $5000 BOX.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved