Plan Review Details - Permit 11020301
Plan Review Stops For Permit 11020301
Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2011-04-25 Cont ID  
Sent By rmcdouga Date 2011-04-25 Time 15:33 Rev Time 0.00
Received By rmcdouga Date 2011-04-25 Time 10:58 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2011-04-08 Cont ID  
Sent By rmcdouga Date 2011-04-08 Time 07:08 Rev Time 0.00
Received By rmcdouga Date 2011-04-08 Time 07:08 Sent To  
Notes
2011-04-08 07:35:142009 FBC W/2009 REVISIONS
  
 DENIED BY BUILDING
  
 1) THE WINDOW AND DOOR PRESSURES SPECIFIED ON SHEET A-1
 OF THE PLANS ARE STILL INCORRECT. THE PRESSURES FOR 140
 MPH EXPOSURE C SHOULD BE +42.7 PSF, -57.2 PSF FOR THE
 WINDOWS (10 SQFT EFFECTIVE WIND AREA) LOCATED IN WALL
 ZONE 5. THE DOOR IN WALL ZONE 4 SHOULD BE +41.6 PSF, -
 45.2 PSF (15 SQFT EFFECTIVE WIND AREA). THE WINDOWS
 LOCATED IN WALL ZONE 4 (10 SQFT EFFECTIVE WIND AREA)
 SHOULD HAVE PRESSURES OF +42.7 PSF, -46.3 PSF. SEE FBC
 TABLES R301.2(2) AND TABLE R301.2(3) AND ASCE 7-05
 FIGURE 6-3. IF YOU DO NOT AGREE PLEASE SUBMIT SIGNED
 AND SEALED CALCULATIONS FROM THE ENGINEER SHOWING HOW
 THE PRESSURE WERE DETERMINED.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2011-03-24 Cont ID  
Sent By rmcdouga Date 2011-03-24 Time 08:06 Rev Time 0.00
Received By rmcdouga Date 2011-03-23 Time 14:16 Sent To  
Notes
2011-03-24 08:06:182009 FBC W/2009 REVISIONS
  
 DENIED BY BUILDING
  
 1) THE ENERGY FORM THAT WAS SUBMITTED (1100B-07) IS NOT
 THE CORRECT ONE. PLEASE FILL OUT THE CURRENT FORM
 (1100B-08) AND SUBMIT 2 COPIES.
  
 2) THE PRODUCT APPROVAL THAT WAS SUBMITTED FOR THE
 FIXED WINDOW IS ONLY TESTED FOR SMALL MISSILE IMPACT.
 FBC R301.2.1.2 REQUIRES THE WINDOWS TO BE TESTED FOR
 LARGE MISSILE IMPACT OR HAVE IMPACT PROTECTION DEVICES
 INSTALLED. SUBMIT TWO COPIES OF PRODUCT APPROVALS FOR
 THE FIXED WINDOWS TESTED FOR LARGE MISSILE IMPACT OR
 THE IMPACT DEVICES THAT WILL BE USED.
  
 3) THE PRODUCT APPROVAL THAT WAS SUBMITTED FOR THE PGT
 SINGLE HUNG WINDOWS HAS THE WRONG NOA NUMBER. THE NOA
 SPECIFIED FOR FL239-R14 IS 07-0322.06. PLEASE SUBMIT 2
 COPIES OF THE COMPLETE CORRECT NOA.
  
 4) THE PRODUCT APPROVALS SUBMITTED FOR THE JELD-WEN
 GLAZED OUTSWING DOORS DO NOT HAVE ADEQUATE DESIGN
 PRESSURES. THE PLANS SPECIFY HIGHER PRESSURES.
  
 5) THE WINDOW AND DOOR PRESSURES SPECIFIED ON SHEET A-1
 OF THE PLANS ARE INCORRECT. THE SMALL WINDOW LOCATED IN
 WALL ZONE 5 SHOULD BE HIGHER THAN THE ONES IN ZONE 4
 AND FOR THE DOOR AND OTHER WINDOWS THE NEGATIVE
 PRESSURE IS ALWAYS MORE THAN THE POSITIVE PRESSURE.
  
 6) THE PRODUCT APPROVALS ARE REQUIRED TO BE "REVIEWED"
 AND APPROVED IN WRITING BY THE DESIGNER OF RECORD.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2011-02-28 Cont ID  
Sent By rmcdouga Date 2011-02-28 Time 08:42 Rev Time 0.00
Received By rmcdouga Date 2011-02-28 Time 08:25 Sent To  
Notes
2011-02-28 09:57:462007 FBC W/2009
  
 DENIED BY BUILDING
  
 1) SUBMIT A COPY OF THE PAID RECEIPT FOR THE COUNTY
 IMPACT FEES.
  
 2) THE FLORIDA PRODUCT APPROVAL COVERSHEETS FOR THE
 WINDOWS, MULLIONS AND DOORS ARE FOR THE 2004 CODE
 VERSION. SUBMIT THE ONES FOR THE 2007 CODE VERSION.
  
 3) THE FLORIDA PRODUCT APPROVAL COVERSHEET FOR THE DOOR
 IS FROM A DIFFERENT MANUFACTURER (BENCHMARK) THAN THE
 ATTACHED MIAMI-DADE NOA (JELD-WEN). THE FILE STATUS IS
 CLOSED FOR THE NOA NO. 07-0731.04. SUBMIT CURRENT
 PRODUCT APPROVAL THAT HAS BEEN REVIEWED AND APPROVED BY
 THE DESIGNER OF RECORD.
  
 4) SUBMIT TWO COPIES OF PRODUCT APPROVALS FOR THE FIXED
 GLASS WINDOW IN THE NEW BEDROOM.
  
 5) THE ENERGY CALCULATION FORM THAT WAS SUBMITTED
 REQUIRES CEILINGS TO BE INSULATED TO A MINIMUM OF R-30.
 THE PLANS SPECIFY R-19 INSULATION IN THE CEILINGS AND
 THE FORM HAS R-19. IN ORDER TO USE THIS METHOD EACH
 COMPONENT IS REQUIRED TO MEET OR EXCEED THE PERFORMANCE
 CRITERIA ON THE FORM, OTHERWISE METHOD A MUST BE USED.
 PLEASE CORRECT.
  
 6) THE OWNER/AGENT IS REQUIRE TO SIGN THE ENERGY
 CALCULATION FORMS.
  
 7) SHOW COMPLIANCE WITH FBC R703.6.3 FOR THE REQUIRED
 BOND BREAK BETWEEN THE WATER-RESISTIVE BARRIER AND THE
 EXTERIOR STUCCO.
  
 8) SHOW COMPLIANCE WITH FBC R703.6.2 AND ASTM C 1063
 FOR THE FOUNDATION WEEP SCREED AT THE BOTTOM OF ALL
 FRAMED EXTERIOR WALLS BELOW THE FLOOR LINE WHERE THE
 WALL IS SUPPORTED BY A FLOOR OR FOUNDATION.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2011-04-25 Cont ID  
Sent By rmcdouga Date 2011-04-25 Time 15:34 Rev Time 0.00
Received By rmcdouga Date 2011-04-25 Time 15:34 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2011-02-28 Cont ID  
Sent By rlecky Date 2011-02-28 Time 14:26 Rev Time 0.00
Received By rlecky Date 2011-02-28 Time 14:10 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2011-04-08 Cont ID  
Sent By rmcdouga Date 2011-04-08 Time 07:09 Rev Time 0.00
Received By rmcdouga Date 2011-04-04 Time 11:52 Sent To  
Notes
2011-04-04 11:52:49GAVE TO MCDOUGAL

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2011-03-24 Cont ID  
Sent By rmcdouga Date 2011-03-24 Time 08:06 Rev Time 0.00
Received By rmcdouga Date 2011-03-21 Time 10:37 Sent To  
Notes
2011-03-21 10:38:06SENT TO R. MCDOUGAL'S DESK.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2011-02-28 Cont ID  
Sent By rlecky Date 2011-02-28 Time 14:26 Rev Time 0.00
Received By rlecky Date 2011-02-14 Time 09:51 Sent To  
Notes
2011-02-14 09:51:49R3

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 2 Status P Date 2011-03-23 Cont ID  
Sent By rmcdouga Date 2011-03-23 Time 13:59 Rev Time 0.00
Received By rmcdouga Date 2011-03-23 Time 13:59 Sent To  
Notes
2011-03-23 14:00:37MU2011-2341

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status F Date 2011-02-28 Cont ID  
Sent By rmcdouga Date 2011-02-28 Time 08:06 Rev Time 0.00
Received By rmcdouga Date 2011-02-28 Time 08:06 Sent To  
Notes
2011-02-28 07:54:50PLEASE SUBMIT A COPY OF THE PAID RECEIPT FOR THE IMPACT
 FEES.

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2011-10-31 Cont ID  
Sent By hmoser Date 2011-10-31 Time 11:33 Rev Time 0.00
Received By hmoser Date 2011-10-31 Time 11:33 Sent To  
Notes
2011-10-31 11:41:50PASS PROVISO
 REFER TO SECTION 601.4 BALANCED RETURN AIR EXCEPTION #
 1
 2007 FBC (M)
 PLAN REVIEW BY HAROLD MOSER.
 561-805-6732
 [email protected]

Review Stop M MECHANICAL (A/C)
Rev No 1 Status N Date 2011-02-28 Cont ID  
Sent By rmcdouga Date 2011-02-28 Time 08:02 Rev Time 0.00
Received By rmcdouga Date 2011-02-28 Time 08:02 Sent To  
Notes
2011-02-28 08:05:50NO MECHANICAL PLANS WERE SUBMITTED AND NO MECHANICAL
 PERMIT WAS APPLIED FOR.

Review Stop P PLUMBING
Rev No 2 Status P Date 2011-03-23 Cont ID  
Sent By rmcdouga Date 2011-03-23 Time 13:57 Rev Time 0.00
Received By rmcdouga Date 2011-03-23 Time 13:57 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2011-02-28 Cont ID  
Sent By rmcdouga Date 2011-02-28 Time 07:15 Rev Time 0.00
Received By rmcdouga Date 2011-02-28 Time 07:15 Sent To  
Notes
2011-02-28 07:53:532007 FBC W/2009 REVISIONS
  
 DENIED BY PLUMBING
  
 1) 2007 FBCR P3108.2 NOT MORE THAN ONE WET VENTED
 FIXTURE DRAIN SHALL DISCHARGE UPSTREAM OF THE DRY
 VENTED FIXTURE DRAIN. PLEASE CORRECT DRAWING.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]

Review Stop Z ZONING
Rev No 1 Status P Date 2011-03-03 Cont ID  
Sent By lfranco Date 2011-03-03 Time 17:52 Rev Time 1.00
Received By lfranco Date 2011-03-03 Time 17:52 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved