Plan Review Details - Permit 11010702
Plan Review Stops For Permit 11010702
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2012-05-30 Cont ID  
Sent By rbrown Date 2012-05-30 Time 09:08 Rev Time 0.00
Received By rbrown Date 2012-05-30 Time 09:08 Sent To  
Notes
2012-05-30 09:09:29ENGINEERING DETAIL FOR REINFORCED CONCRETE SLAB OVER
 DUCT BANK.

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2011-02-10 Cont ID  
Sent By rlecky Date 2011-02-01 Time 14:39 Rev Time 0.00
Received By rlecky Date 2011-02-10 Time 14:18 Sent To  
Notes
2011-02-10 14:41:55 
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2011-02-09 Cont ID  
Sent By mgonzale Date 2011-02-09 Time   Rev Time 2.00
Received By mgonzale Date 2011-02-09 Time   Sent To  
Notes
2011-02-09 16:10:52PASSED WITH PROVISO:
  
 SHEET C-4 FIELD VERIFY THE SIZE AND LOCATION OF
 EXISTING F.M. PRIOR TO TAPPING.
 SHEET C-4 WHERE TEE IS BEING CONNECTED A R.W. GATE
 VALVE IS HIGHLY RECOMMENDED.
  
 MANUEL JULIAN GONZALEZ
 CSD ENGINEERING REVIEW
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
  
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2011-02-15 Cont ID  
Sent By jwitmer Date 2011-02-15 Time 08:41 Rev Time 0.00
Received By jwitmer Date 2011-02-15 Time 08:41 Sent To  
Notes
2011-02-15 08:42:25INCOMING SENT TO ROBERT LECKY DESK. JW

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2011-02-10 Cont ID  
Sent By rlecky Date 2011-02-10 Time 15:11 Rev Time 0.00
Received By rlecky Date 2011-01-28 Time 09:33 Sent To  
Notes
2011-01-31 09:35:15TO ENGINEERING BOX