| Plan Review Stops For Permit 11010541 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
N |
Date |
2011-03-07 |
|
|
Cont ID |
|
| Sent By |
lmartine |
Date |
2011-03-07 |
Time |
10:31 |
Rev Time |
0.00 |
| Received By |
lmartine |
Date |
2011-03-07 |
Time |
10:31 |
Sent To |
|
|
| Notes |
| 2011-03-07 10:32:48 | BUILDING REVIEW NOT REQUIRED, NO STRUCTUAL WORK ON | | | PLANS |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2011-03-07 |
|
|
Cont ID |
|
| Sent By |
lmartine |
Date |
2011-03-07 |
Time |
10:17 |
Rev Time |
0.00 |
| Received By |
lmartine |
Date |
2011-03-07 |
Time |
10:30 |
Sent To |
|
|
| Notes |
| 2011-03-07 10:25:21 | SEE SHEET M-1 FOR HAROLD MOSER'S SIGNATURE |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2011-02-11 |
|
|
Cont ID |
|
| Sent By |
rlecky |
Date |
2011-02-11 |
Time |
12:37 |
Rev Time |
0.00 |
| Received By |
rlecky |
Date |
2011-02-11 |
Time |
12:08 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
P |
Date |
2011-02-01 |
|
|
Cont ID |
|
| Sent By |
mgonzale |
Date |
2011-02-01 |
Time |
17:28 |
Rev Time |
1.00 |
| Received By |
mgonzale |
Date |
2011-02-01 |
Time |
17:28 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2011-03-16 |
|
|
Cont ID |
|
| Sent By |
ddaniels |
Date |
2011-03-16 |
Time |
09:22 |
Rev Time |
0.00 |
| Received By |
ddaniels |
Date |
2011-03-16 |
Time |
09:22 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
2011-02-17 |
|
|
Cont ID |
|
| Sent By |
mcarsill |
Date |
2011-02-17 |
Time |
13:35 |
Rev Time |
0.00 |
| Received By |
mcarsill |
Date |
2011-02-17 |
Time |
13:16 |
Sent To |
|
|
| Notes |
| 2011-02-17 13:35:42 | 1009 BANYAN BOULEVARD | | | PERMIT NUMBER 11010541 | | | REPLACEMENT OF EXISTING FLUORIDE SYSTEM WITH A NEW | | | FLUORIDE STORAGE AND FEED SYSTEM. | | | | | | | | | 1. SITE ADDRESS NOT LISTED ON THE PLANS. | | | | | | 2. ALL STORAGE VESSELS ARE TO BE PROPERLY IDENTIFIED | | | WITH PRODUCT NAME AND QUANTITY. | | | | | | 3. ALL CONSTRUCTION, DEMOLITION, AND RENOVATION TO | | | COMPLY WITH NFPA 241. | | | | | | 4. ALL HAZARDOUS MATERIALS ARE TO BE PROPERLY STORED, | | | HANDLED, AND TRANSFERRED DURING THE PROPOSED | | | RENOVATIONS. | | | | | | 5. ACCORDING TO THE MATERIAL SAFETY DATA SHEETS (MSDS) | | | THAT WERE PROVIDED THE HYDROFLUOROSILICIC ACID | | | SIGNIFICANT HEALTH HAZARDS EXIST SHOULD EYE, SKIN, | | | INHALATION OR INGESTION OCCURS. THIS MATERIAL HAS A | | | HEALTH HAZARD OF A 3 ON THE NFPA 704 IDENTIFICATION | | | PLACARD. ALSO THE SULFURIC ACID IS ALSO LISTED AS A 3 | | | ON THE NFPA 704 IDENTIFICATION PLACARD. | | | | | | 6. MORE DETAILS NEEDED FOR CONDUIT PENETRATION AT NEW | | | WALL OR SLAB DETAIL SHOWN ON SHEET E-9. THE TYPE OF | | | FIRE RATING MATERIAL, THICKNESS OF APPLICATION, AND | | | INSTALLATION METHODS SHOULD BE PROVIDED. | | | | | | 7. WRONG CODE INFORMATION PROVIDED ON SHEET E-2. SHOULD | | | READ THE 2006 EDITION OF THE LIFE SAFETY CODE, NFPA 101 | | | NOT THE 2003 EDITION. | | | | | | | | | DENIED | | | | | | | | | MIKE CARSILLO, BATTALION CHIEF | | | BUREAU OF FIRE PREVENTION |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2011-03-16 |
|
|
Cont ID |
|
| Sent By |
ddaniels |
Date |
2011-03-16 |
Time |
09:22 |
Rev Time |
0.00 |
| Received By |
ddaniels |
Date |
2011-03-14 |
Time |
09:29 |
Sent To |
|
|
| Notes |
| 2011-03-14 09:31:33 | SENT TO FIRE BOX FOR MIKE CARSILLO REVIEW. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2011-01-25 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2011-01-25 |
Time |
08:02 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2011-01-25 |
Time |
08:02 |
Sent To |
|
|
| Notes |
| 2011-01-25 08:02:38 | INCOMING SENT TO C-15 JW |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2011-03-07 |
|
|
Cont ID |
|
| Sent By |
hmoser |
Date |
2011-02-11 |
Time |
13:05 |
Rev Time |
0.00 |
| Received By |
lmartine |
Date |
2011-02-11 |
Time |
13:05 |
Sent To |
|
|
| Notes |
| 2011-03-07 10:30:28 | SEE SHEET M-1 FOR HAROLD MOSER'S SIGNATURE |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2011-02-22 |
|
|
Cont ID |
|
| Sent By |
lwagner |
Date |
2011-02-22 |
Time |
10:10 |
Rev Time |
0.00 |
| Received By |
lwagner |
Date |
2011-02-22 |
Time |
09:55 |
Sent To |
|
|
| Notes |
| 2011-02-22 10:10:36 | PLUMBING PERMIT REQUIRED |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2011-02-14 |
|
|
Cont ID |
|
| Sent By |
astelly |
Date |
2011-02-14 |
Time |
11:55 |
Rev Time |
0.00 |
| Received By |
astelly |
Date |
2011-02-14 |
Time |
11:55 |
Sent To |
|
|
| Notes |
|
|