Plan Review Details - Permit 11010510
Plan Review Stops For Permit 11010510
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2011-02-03 Cont ID  
Sent By rlecky Date 2011-02-03 Time 11:11 Rev Time 0.00
Received By rlecky Date 2011-02-03 Time 11:11 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2011-01-28 Cont ID  
Sent By rlecky Date 2011-01-28 Time 14:46 Rev Time 0.00
Received By rlecky Date 2011-01-28 Time 14:29 Sent To  
Notes
2011-01-28 14:45:29PLEASE CLARIFY THE FOLLOWING:
  
 THE POLE DESIGN PROFESSIONAL, JOSEPH R. SPRINGER, HAS
 REQUESTED CONFIRMATION FROM GFA THAT HIS CALCULATIONS
 AGREE WITH THE SOIL DESIGN VALUES ESTABLISHED. THIS
 QUESTION IS RELATED TO VERIFYING THAT THE MAXIMUM
 ALLOWABLE LATERAL SOIL PRESSURE USED IN THE DESIGN IS
 SUFFICIENT. SEE SHEET 1 OF THE JOB SUMMARY FROM J.
 SPRINGER.
  
 ROBERT LECKY,
 PLANS EXAMINER 561-805- 6718

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2011-01-28 Cont ID  
Sent By rlecky Date 2011-01-28 Time 11:04 Rev Time 0.00
Received By rlecky Date 2011-01-28 Time 10:07 Sent To  
Notes
2011-01-28 14:47:58ADVISED OF A DISCREPANCY WITHIN THE DESIGN ANALYSIS.
 CREATED AN ADDITIONAL REVIEW STOP.
  
  
2011-01-28 11:06:07IN C10

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2011-02-03 Cont ID  
Sent By rlecky Date 2011-02-03 Time 10:59 Rev Time 0.00
Received By rlecky Date 2011-02-03 Time 10:59 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2011-01-28 Cont ID  
Sent By rlecky Date 2011-01-28 Time 11:04 Rev Time 0.00
Received By rlecky Date 2011-01-26 Time 11:41 Sent To  
Notes
2011-01-26 11:44:27PENDING ZONING REVIEW. SEE ALSO #11010580 FOR THE
 LIGHTNING PROTECTION SYSTEM.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2011-02-03 Cont ID  
Sent By rlecky Date 2011-02-03 Time 11:01 Rev Time 0.00
Received By rlecky Date 2011-02-03 Time 10:59 Sent To  
Notes
2011-02-03 11:01:50ADVISED THE ZONING PROVISO WAS WITHDRAWN.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2011-02-02 Cont ID  
Sent By rlecky Date 2011-02-02 Time 14:58 Rev Time 0.00
Received By rlecky Date 2011-01-26 Time 11:06 Sent To  
Notes
2011-01-24 08:10:56C-10

Review Stop Z ZONING
Rev No 1 Status P Date 2011-02-01 Cont ID  
Sent By ajones Date 2011-02-01 Time 16:52 Rev Time 0.00
Received By ajones Date 2011-02-01 Time 14:55 Sent To  
Notes
2011-02-01 16:52:54PASSED PER CHARLES WU.
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved