Plan Review Details - Permit 11010095
Plan Review Stops For Permit 11010095
Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2011-05-11 Cont ID  
Sent By rmcdouga Date 2011-05-11 Time 13:31 Rev Time 0.00
Received By rmcdouga Date 2011-05-11 Time 13:02 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2011-04-29 Cont ID  
Sent By rmcdouga Date 2011-04-29 Time 09:43 Rev Time 0.00
Received By rmcdouga Date 2011-04-29 Time 09:43 Sent To Z
Notes
2011-04-29 10:25:432007 FBC W/2009 REVISIONS
  
 DENIED BY BUILDING
  
 1) THE RAS 117 CALCULATIONS ARE INCORRECT. THE ROOF
 PITCH FOR THE COVERED PATIO IS 0 TO 7 DEGREES. WHICH
 MAKES THE PRESSURES FOR EXPOSURE C - 42.7 PSF FOR ROOF
 ZONE 1, -71.6 PSF FOR ROOF ZONE 2 AND - 107.7 PSF FOR
 ROOF ZONE THREE. ROOFING APPLICATION STANDARD (RAS) NO.
 117 SECTION 8.1 REQUIRES THAT THE MINIMUM FASTENER
 SEPARATION SHALL NOT BE LESS THAN 4 IN. ON CENTER.
 PLEASE SUBMIT CORRECTED RAS 117 CALCULATIONS.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2011-04-04 Cont ID  
Sent By rmcdouga Date 2011-04-04 Time 13:08 Rev Time 0.00
Received By rmcdouga Date 2011-04-04 Time 13:08 Sent To  
Notes
2011-04-04 13:34:042007 FBC W/2009 REVISIONS
  
 DENIED BY BUILDING
  
 1) THE RAS 117 CALCULATIONS THAT WERE SUBMITTED FOR THE
 GAF MODIFIED ROOF COVERING SYSTEM ARE BASED ON EXPOSURE
 CATEGORY B AND THE PROJECT IS LOCATED IN EXPOSURE C.
 THE PLANS THAT WERE SUBMITTED ALSO SPECIFY EXPOSURE C.
 PLEASE SUBMIT TWO SETS OF SIGNED AND SEALED RAS 117
 CALCS. FOR 140 MPH EXPOSURE C.
  
 2) THE DESIGN WIND UPLIFT PRESSURES PRESSURES LISTED IN
 THE RAS 117 CALCULATIONS ARE LOW. PER ASCE 7-05 FIGURE
 6-3 ON PAGE 43, WITH AN EFFECTIVE WIND AREA OF 10
 SQUARE FEET OR LESS THE UPLIFT PRESSURES FOR A ROOF
 SLOPE OF 0 TO 7 DEGREES AND MRH 30 FT LOCATED IN 140
 MPH EXPOSURE B ARE -35.3 PSF FOR ROOF ZONE 1, -59.2 PSF
 FOR ROOF ZONE 2 AND -89.0 PSF FOR ROOF ZONE 3. THESE
 PRESSURES WILL NEED TO BE MULTIPLIED BY THE APPROPRIATE
 ADJUSTMENT FACTOR FROM THE TABLE ON PAGE 44 FOR
 EXPOSURE C AND MEAN ROOF HEIGHT OF THE STRUCTURE.
  
 3) FBC R806 ROOF VENTILATION, REQUIRES THE ENCLOSED
 SPACES BETWEEN RAFTERS TO HAVE CROSS VENTILATION FOR
 EACH SEPARATE SPACE BY VENTILATION OPENINGS. SHOW
 COMPLIANCE.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2011-02-09 Cont ID  
Sent By rmcdouga Date 2011-02-09 Time 07:11 Rev Time 0.00
Received By rmcdouga Date 2011-02-09 Time 07:11 Sent To  
Notes
2011-02-09 07:25:29DENIED BY BUILDING
  
 1) SUBMIT TWO COPIES OF PRODUCT APPROVALS FOR THE ROOF
 COVERING SYSTEM THAT WILL BE INSTALLED ON THE LOW SLOPE
 PATIO ROOF. SUBMIT TWO COPIES OF THE ENHANCED FASTENING
 CALCULATIONS FOR THE INCREASED PRESSURES AT THE CORNER
 AND PERIMETER AREAS OF THE ROOF.
  
 NOTE: A ROOFING PERMIT IS REQUIRED FOR THIS PROJECT.
 YOU CAN APPLY FOR THE ROOFING PERMIT AS AN OWNER
 BUILDER. YOU WILL NEED TO SIGN THE APPLICATION AS THE
 ROOFING CONTRACTOR AND A ROOFING PERMIT NUMBER WILL BE
 ASSIGNED.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2011-05-11 Cont ID  
Sent By rmcdouga Date 2011-05-11 Time 13:31 Rev Time 0.00
Received By rmcdouga Date 2011-05-09 Time 16:17 Sent To  
Notes
2011-05-09 16:17:41TO RM DESK
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2011-05-09 Cont ID  
Sent By shill Date 2011-05-04 Time 16:16 Rev Time 0.00
Received By shill Date 2011-04-21 Time 14:00 Sent To  
Notes
2011-04-21 14:12:14TO RM

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2011-04-21 Cont ID  
Sent By rlecky Date 2011-04-04 Time 13:59 Rev Time 0.00
Received By rlecky Date 2011-03-24 Time 12:00 Sent To  
Notes
2011-03-24 12:02:53IN ZONING BOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2011-02-09 Cont ID  
Sent By rmcdouga Date 2011-02-09 Time 07:25 Rev Time 0.00
Received By rmcdouga Date 2011-01-07 Time 08:24 Sent To  
Notes
2011-02-01 16:10:03TO MISC 2
  
2011-01-07 08:25:18TO ZONING BOX

Review Stop Z ZONING
Rev No 3 Status P Date 2011-05-04 Cont ID  
Sent By astelly Date 2011-05-04 Time 11:41 Rev Time 0.00
Received By astelly Date 2011-05-04 Time 11:41 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status F Date 2011-04-01 Cont ID  
Sent By astelly Date 2011-04-01 Time 16:52 Rev Time 0.00
Received By astelly Date 2011-04-01 Time 16:52 Sent To  
Notes
2011-04-01 16:54:02AMY STELLY
 PLANNING AND ZONING
 561-822-1442
  
 REPEAT COMMENT
 PLEASE SHOW THE LOCATION OF THE PROPOSED PROJECT AND
 THE SETBACKS FROM THE PROPERTY LINES ON THE SURVEY.

Review Stop Z ZONING
Rev No 1 Status F Date 2011-01-13 Cont ID  
Sent By astelly Date 2011-01-13 Time 11:30 Rev Time 0.00
Received By astelly Date 2011-01-13 Time 11:30 Sent To  
Notes
2011-01-13 14:54:37AMY STELLY
 PLANNING AND ZONING
 561-822-1442
  
 PLEASE SUBMIT A SURVEY OF THE PROPERTY SHOWING THE
 LOCATION OF THE PROPOSED PROJECT AND THE SETBACKS FROM
 THE PROPERTY LINES.