Plan Review Details - Permit 11010025
Plan Review Stops For Permit 11010025
Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2011-01-06 Cont ID  
Sent By rmcdouga Date 2011-01-06 Time 09:58 Rev Time 0.00
Received By rmcdouga Date 2011-01-05 Time 10:40 Sent To  
Notes
2011-01-05 10:41:09SENT TO R. MCDOUGAL'S DESK.

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2011-01-06 Cont ID  
Sent By rmcdouga Date 2011-01-06 Time 08:14 Rev Time 0.00
Received By rmcdouga Date 2011-01-06 Time 07:12 Sent To  
Notes
2011-01-06 09:57:50DENIED BY MECHANICAL
  
 1) THE APPROVED MECHANICAL PLANS WERE SIGNED AND SEALED
 BY BERNARD JONES, A FLORIDA LICENSED ARCHITECT. THE
 REVISED PLANS THAT WERE SUBMITTED HAVE THE ARCHITECT'S
 TITLE BLOCK BUT HAVE NOT BEEN SIGNED AND SEALED BY HIM
 AS REQUIRED BY FS 481.
  
 2) PLEASE USE THE NEW REVISED FLOOR PLAN TO SHOW THE
 LOCATIONS OF HVAC SYSTEM AND NOT THE EXISTING FLOOR
 PLAN DEMO PLANS.
  
 3) SPECIFY THE CFM AT EACH OF THE SUPPLY OUTLETS ON THE
 DRAWINGS.
  
 4) SPECIFY THE SIZES OF ALL OF THE SUPPLY AND RETURN
 DUCTS AND GRILLS ON THE PLANS.
  
 5) THE ENERGY CALCULATION FORM 1100A-08 IS REQUIRED TO
 BE SIGNED BY THE OWNER/AGENT.
  
 6) THE EQUIPMENT SIZING SUMMARY LISTS THE TOTAL
 CALCULATED COOLING LOAD AS 19753 BTU AND THE SPECIFIED
 EQUIPMENT HAS A TOTAL COOLING CAPACITY OF 27600 BTU.
 SECTION N1107.AB.1.1 OF THE REVISED ENERGY CODE STATES
 THAT THE COOLING EQUIPMENT SHALL BE SELECTED SO THAT
 ITS TOTAL CAPACITY IS NOT LESS THAN THE CALCULATED LOAD
 BUT NOT MORE THAN 1.15 TIMES GREATER THAN THE TOTAL
 CALCULATED LOAD. THE SPECIFIED 2.5 TON UNIT APPEARS TO
 BE TOO LARGE. BASED ON THE CALCULATIONS A 2 TON UNIT IS
 REQUIRED. PLEASE CLARIFY.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved