Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2010-12-17 Cont ID  
Sent By dwise Date 2010-12-17 Time 15:34 Rev Time 0.00
Received By dwise Date 2010-12-17 Time 15:34 Sent To  
Notes
2010-12-17 15:40:451. APPROVED WITH THE FOLLOWING PROVISOS:
 A. MUST PROVIDE EXECUTED CONTRACT WITH PBAU WHICH SHOWS
 ENTIRE COST OF PROJECT. ESTIMATED VALUE SEEMS
 SUBSTANTIALLY LOW GIVEN WORK REQURIRED INCLUDING NEW
 CURBS, REMOVAL AND REPLACEMENT OF SHAFT WALL AND
 INSULATION OF EXISTING DUCTS, ALONG WITH NEW EQUIPMENT,
 ELECTRICAL AND INSTALLATION COSTS.
 B. NO INCREASE IN VISIBILITY OF EQUIPMENT FROM ADJACENT
 PUBLIC RIGHTS OF WAY IS AUTHORIZED OR ANTICIPATED WITH
 THIS PERMIT.
 C. REVISIONS REQUIRED TO ADDRESS BOTH MECHANICAL
 COMMENTS AND TO FACILITATE THE ELECTRICAL WORK REQUIRED
 FOR THIS PERMIT.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date   Cont ID  
Sent By   Date 2010-12-17 Time   Rev Time 0.00
Received By rmcdouga Date 2010-12-17 Time 13:01 Sent To  
Notes
2010-12-17 13:01:35TO R REGUEIRO

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2010-12-17 Cont ID  
Sent By rregueir Date 2010-12-17 Time 15:29 Rev Time 0.00
Received By rregueir Date 2010-12-17 Time 15:24 Sent To  
Notes
2010-12-17 15:29:24***PROVISO**
  
 1. PROVIDE DETAIL FOR INSTALLATION AND ATTACHMENT OF
 NEW ROOF CURB TO STRUCTURE AND NEW EQUIPMENT TO CURB
 PER FBC-M 301.12.
 2. PROVIDE WIND RESISTANCE DATA, PRODUCT APPROVAL OR
 CERTIFICATION FROM STRUCTURAL ENGINEER REGARDIN WIND
 RESISTANCE OF THE NEWLY INSTALLED EQUIPMENT PER FBC-M
 301.12.
 3. CLEARANCE UNDER NEW EQUIPMENT SHALL BE IN ACCORDANCE
 WITH FBC-B TABLE 1509.7
 4. NEW ELECTRICAL CIRCUIT REQUIRED FOR NEW CONDENSING
 UNITS. SEPARATE ELECTRICAL PLANS AND PERMIT REQUIRED.
 5. PROVIDE INFORMATION ON INSULATION TO BE USED ON
 SUPPLY DUCT IN SHAFT PER FBC-M 604.1.
  
 IF YOU HAVE ANY QUESTIONS PLEASE CONTACT:
 RONALD J. REGUEIRO
 561.805.6719
 [email protected]

Review Stop Z ZONING
Rev No 1 Status N Date 2010-12-17 Cont ID  
Sent By rmcdouga Date 2010-12-17 Time 13:00 Rev Time 0.00
Received By rmcdouga Date 2010-12-17 Time 13:00 Sent To  
Notes
2010-12-17 15:43:23REPLACING EXISTING EXHAUST HOOD MAKEUP FAN WITH
 COMBINATION MAKEUP FAN AND AIR CONDITIONING SYSTEM
2010-12-17 13:00:59NOT REQUIRED PER D WISE