Plan Review Details - Permit 10120229
Plan Review Stops For Permit 10120229
Review Stop ENG ENGINEERING CSD
Rev No 3 Status P Date 2011-01-14 Cont ID  
Sent By   Date 2011-01-14 Time   Rev Time 1.00
Received By   Date 2011-01-14 Time   Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 2 Status F Date 2010-12-15 Cont ID  
Sent By lfranco Date 2010-12-15 Time 15:32 Rev Time 0.00
Received By lfranco Date 2010-12-15 Time 15:32 Sent To  
Notes
2011-01-05 15:34:07FAILED
  
 IMPERVIOUS AREA EXCEEDS CODE LIMITS. REVISE LAYOUT TO
 PROVIDE ADDITIONAL GREEN SPACE.
  
 PORTLAND CEMENT CONCRETE, A MINIMUM OF 3,000 PSI AT
 28DAYS,FIBERMESH REINFORCED, FOUR INCHES (4") THICK
 MIN.
  
  
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2010-12-09 Cont ID  
Sent By mgonzale Date 2010-12-09 Time 14:39 Rev Time 0.50
Received By mgonzale Date 2010-12-09 Time 14:39 Sent To  
Notes
2010-12-09 14:39:52PASSED WITH PROVISO:
  
 PORTLAND CEMENT CONCRETE, A MINIMUM OF 3,000 PSI AT
 28DAYS,FIRBERMESH REINFORCED, FOUR INCHES (4") THICK
 MIN.
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2011-01-10 Cont ID  
Sent By shill Date 2011-01-10 Time 10:07 Rev Time 0.00
Received By lmartine Date 2011-01-10 Time 14:15 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2011-01-13 Cont ID  
Sent By lfranco Date 2011-01-13 Time 10:30 Rev Time 0.00
Received By lfranco Date 2011-01-13 Time 10:30 Sent To ENG
Notes
2011-01-13 10:45:59PLANNING AND ZONING: **** PASSED, APPLICANT, MS. CARLA
 SHEEDY REVISED CIRCULAR DRIVE TO COMPLY WITH GREEN
 SPACE/LANDSCAPE REQUIREMENTS WITHIN THE FRONT YARD.
 PURSUANT TO "EXHIBIT "A" DRAWING. ****
  
  
  
  

Review Stop Z ZONING
Rev No 1 Status F Date 2010-12-14 Cont ID  
Sent By lfranco Date 2010-12-14 Time 15:30 Rev Time 0.00
Received By lfranco Date 2010-12-14 Time 15:30 Sent To  
Notes
2011-01-05 15:31:19PLANNING AND ZONING: **** FAILED ****
  
 1. RESPOND TO COMMENTS IN WRITING.
  
 2. THE PROPOSED "U" DRIVE WITH TWO (2) ACCESS POINTS
 WILL BE ALLOWED TO BE PROCESSED DURING THE INTERIM
 PENDING CODE REVISION AMENDMENT THAT WILL ALLOW
 "U-SHAPE DRIVEWAYS," SET TO BE CODIFIED WITHIN THE NEXT
 FEW MONTHS. HOWEVER, THE APPLICABLE REQUIREMENTS WILL
 STILL NEED TO BE ADDRESSED:
  
 PURSUANT TO SECTION 94-482 OF THE ZLDR: REQUIRED
 OFF-STREET PARKING SPACES FOR LESS THAN FOUR
 RESIDENTIAL DWELLING UNITS SHALL BE LOCATED ON THE
 PROPERTY ON WHICH THE UNITS ARE CONSTRUCTED. REQUIRED
 PARKING MAY BE LOCATED IN A FRONT YARD; HOWEVER, THE
 LESSER OF 1,000 SQUARE FEET OR 75 PERCENT OF THE FRONT
 YARD AREA MUST BE LANDSCAPED. PARKING AREAS LOCATED IN
 THE FRONT YARD SHALL BE SURFACED WITH A SMOOTH,
 NONDUSTING SURFACE IN COMPLIANCE WITH SUBSECTION
 33-485(E). IT SHALL BE A VIOLATION OF THIS CHAPTER TO
 PARK ON ANY UNPAVED AREAS AS DESCRIBED IN THIS ARTICLE.
  
 PLEASE INDICATE SQUARE FOOTAGE OF ALL IMPERMEABLE
 SURFACES (EXISTING AND PROPOSED) LOCATED WITHIN THE
 FRONT YARD (FROM FRONT PROPERTY LINE TO THE FRONT
 BUILDING FACADE).
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT ME.
  
 LINDA MIA FRANCO
 SENIOR PLANNER
 PLANNING AND ZONING DEPARTMENT
 TEL: (561) 822-1443
 EMAIL: [email protected]
  
  
  
  
  
 DENIED- APPLICANT DOES NOT MEET THE 75% OR 1,000 SQ.
 FT. REQUIREMENT FOR REQUIRED LANDSCAPE IN THE FRONT
 SETBACK (FIRST 25 FEET).
  
 APPLICANT CAN CONTACT
 LINDA MIA FRANCO, SENIOR PLANNER
 561-822-1443
 FOR ADDITIONAL INFORMATION.


Account Summary | Usage Policy | Privacy Policy