| 2010-09-17 16:28:37 | FAILED |
| | |
| | PROVIDE RESPONSES IN WRITING. |
| | |
| | 1) THE SCOPE OF WORK LISTED FOR THE PERMIT IS TO |
| | REPLACE THE ENTRY RAMP AND TO RE-STRIPE THE PARKING |
| | AREA WITH A DIFFERENT LAYOUT, YET THE DEMOLITION AND |
| | CONSTRUCTION PLANS INCLUDE THE REMOVAL OF THE EXISTING |
| | COOLER AND FENCE AND THE INSTALLATION OF A NEW COOLER |
| | AND FENCE AS WELL AS INTERIOR AND EXTERIOR ELECTRICAL |
| | WORK. THE PLANS SHALL CLEARLY SHOW WHAT IS INCLUDED ON |
| | THIS PERMIT SO THAT THE ACTUAL SCOPE OF WORK MAY BE |
| | REVIEWED. |
| | |
| | 2) THE EXISTING/DEMOLITION SITE PLAN DOES NOT MATCH THE |
| | SURVEY, EX. PERIMETER BUFFERS, AREA AROUND THE SIGN AT |
| | SOUTH DIXIE HIGHWAY, NO SIGN SHOWN AT REAR OF PROPERTY |
| | ON SURVEY, DUMPSTER LOCATION, COOLER AREA. |
| | |
| | 3) THE PLANS DO NOT INCLUDE ANY SITE DATA. THE SITE |
| | DATA SHALL INCLUDE THE ACREAGE, THE AMOUNT OF REQUIRED |
| | AND PROPOSED PARKING, TO INCLUDE ADA, LOADING AND |
| | BICYCLE PARKING, AND THE EXISTING AND PROPOSED |
| | PERVIOUS/IMPERVIOUS SURFACE AND LANDSCAPE SQUARE |
| | FOOTAGE. |
| | |
| | 4) THE DEMOLITION NOTES STATE THAT THERE IS LANDSCAPE |
| | BEING REMOVED (NOTE #6) YET THERE IS NO MENTION OF |
| | REPLACEMENT LANDSCAPE. THE SITE APPEARS TO BE DEFICIENT |
| | IN LANDSCAPE PERCENTAGE (MINIMUM 15% REQUIRED); |
| | THEREFORE THE AMOUNT OF LANDSCAPE ON SITE MAY NOT BE |
| | REDUCED. NOTE: THIS ALSO APPLIES TO THE DISCREPANCIES |
| | BETWEEN LANDSCAPE AREA SHOWN ON SURVEY AND LANDSCAPE |
| | AREA SHOWN ON SITE PLAN. |
| | |
| | 5) THE LATEST APPROVED SITE/PARKING PLAN FOR THE SITE |
| | IS FROM PERMIT NUMBER 8900G APPROVED IN 1978. THE |
| | PARKING SHOWN ON THE SUBMITTED EXISTING/DEMOLITION SITE |
| | PLAN DOES NOT MATCH THIS CONFIGURATION. PLEASE NOTE |
| | THAT ANY CHANGE FROM THE LATEST APPROVED PARKING |
| | CONFIGURATION WILL REQUIRE THAT THE PARKING LOT BE |
| | BROUGHT INTO CONFORMITY WITH THE PROVISIONS IN ARTICLE |
| | XIV "LANDSCAPE" AND ARTICLE XV "PARKING" OF THE ZONING |
| | AND LAND DEVELOPMENT REGULATIONS. |
| | |
| | 6) THE RECONFIGURED PARKING LOT REQUIRES INTERIOR |
| | TERMINAL AND TERMINAL PARKING ISLANDS ARE REQUIRED. |
| | |
| | 7) THE RECONFIGURED PARKING LOT REQUIRES PROPER |
| | LANDSCAPE BUFFERS ADJACENT TO THE PARKING AREAS ARE |
| | REQUIRED. |
| | |
| | 8) THE RECONFIGURED PARKING LOT REQUIRES BICYCLE |
| | PARKING. |
| | |
| | 9) THE AERIAL OF THE SITE SHOWS NO PARKING SPACES |
| | CURRENTLY STRIPED. ALL REGULAR PARKING SPACES SHALL BE |
| | STRIPED TO A UNIFORM WIDTH, NOT DIFFERENT SIZES AS |
| | SHOWN ON THE PROPOSED SITE PLAN. |
| | |
| | 10) THE PARKING DETAIL DOES NOT MEET CITY STANDARDS. |
| | THE PARKING DETAIL SHALL ALSO SHOW THE REGULAR PARKING |
| | SPACE DIMENSIONS. |
| | |
| | 11) WHAT IS THE PURPOSE OF THE AREA WITH YELLOW |
| | STRIPING ADJACENT TO THE HC ACCESS AISLE? |
| | |
| | 12) IS THE YELLOW STRIPPED AREA ADJACENT TO THE COOLER |
| | TO BE A LOADING ZONE? IF SO, IT SHALL BE APPROPRIATELY |
| | MARKED AS SUCH. |
| | |
| | 13) SHEET A-2 "ADDITIONAL KEY NOTES" LISTS NEW COOLER, |
| | FENCE AND GATE. NONE OF THESE LISTED ON PERMIT SCOPE OF |
| | WORK. PROVIDE DETAILS ON THE COOLER, INCLUDING |
| | ELEVATION AND MATERIALS. DEPENDING ON THE COOLER |
| | DESIGN, A TALLER FENCE MAY BE REQUIRED TO PROVIDE |
| | PROPER SCREENING. |
| | |
| | 14) FOUNDATION PLANTING AROUND THE COOLER, IN |
| | ACCORDANCE WITH SECTION 94-443(E), IS REQUIRED. |
| | |
| | 15) THE SITE PLAN SHALL CLEARLY DIFFERENTIATE BETWEEN |
| | PAVED AND LANDSCAPED AREAS. |
| | |
| | CONTACT ERIC SCHNEIDER @ (561) 822-1446. |
| | |