Plan Review Details - Permit 10080087
Plan Review Stops For Permit 10080087
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2010-09-08 Cont ID  
Sent By shill Date 2010-09-08 Time 12:53 Rev Time 0.00
Received By shill Date 2010-09-08 Time 12:53 Sent To  
Notes
2010-09-08 12:54:11****PROVISO****
 ****ISSUED AT CONTRACTOR'S RISK****
  
 PROVIDE REVISED INSTALLATION SCHEDULE TO FIELD
 INSPECTOR
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2010-08-12 Cont ID  
Sent By shill Date 2010-08-12 Time 10:19 Rev Time 0.00
Received By shill Date 2010-08-12 Time 09:44 Sent To  
Notes
2010-08-12 10:24:52****PROVISO****
 ****REVISION REQUIRED****
 ****ISSUED AT CONTRACTOR'S RISK****
  
 REVISE INSTALLATION SCHEDULE TO CORRECT THE FOLLOWING:
  
 1. P2, CEILING/FLOOR MOUNT SECTION B REQUIRES A
 DIFFERENT FASTENER THAN THE ONE SPECIFIED IN THE
 INSTALLATION SCHEDULE.
  
 2. "CB" SPECIFIED AS SUBSTRATE ON INSTALLATION
 SCHEDULE, SEE P. 5. IF THE SUBSTRATE IS CONCRETE BLOCK,
 YOU MUST USE MASONRY FASTENING.
  
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2010-08-12 Cont ID  
Sent By shill Date 2010-08-12 Time 10:25 Rev Time 0.00
Received By shill Date 2010-08-09 Time 11:20 Sent To  
Notes
2010-08-09 11:21:00SENT TO MISC. BOX #1.