| Plan Review Stops For Permit 10080087 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2010-09-08 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2010-09-08 |
Time |
12:53 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2010-09-08 |
Time |
12:53 |
Sent To |
|
|
| Notes |
| 2010-09-08 12:54:11 | ****PROVISO**** | | | ****ISSUED AT CONTRACTOR'S RISK**** | | | | | | PROVIDE REVISED INSTALLATION SCHEDULE TO FIELD | | | INSPECTOR | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2010-08-12 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2010-08-12 |
Time |
10:19 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2010-08-12 |
Time |
09:44 |
Sent To |
|
|
| Notes |
| 2010-08-12 10:24:52 | ****PROVISO**** | | | ****REVISION REQUIRED**** | | | ****ISSUED AT CONTRACTOR'S RISK**** | | | | | | REVISE INSTALLATION SCHEDULE TO CORRECT THE FOLLOWING: | | | | | | 1. P2, CEILING/FLOOR MOUNT SECTION B REQUIRES A | | | DIFFERENT FASTENER THAN THE ONE SPECIFIED IN THE | | | INSTALLATION SCHEDULE. | | | | | | 2. "CB" SPECIFIED AS SUBSTRATE ON INSTALLATION | | | SCHEDULE, SEE P. 5. IF THE SUBSTRATE IS CONCRETE BLOCK, | | | YOU MUST USE MASONRY FASTENING. | | | | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2010-08-12 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2010-08-12 |
Time |
10:25 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2010-08-09 |
Time |
11:20 |
Sent To |
|
|
| Notes |
| 2010-08-09 11:21:00 | SENT TO MISC. BOX #1. |
|
|
|