| 2010-07-29 13:53:29 | COMMUNITY HOSPITAL OF THE PALM BEACHES |
| | 2201-45TH STREET |
| | PERMIT NUMBER 10070774 |
| | |
| | |
| | 1. THE PROPOSED FIRE ALARM INSTALLATION TO COMPLY WITH |
| | NFPA 72, THE NATIONAL FIRE ALARM CODE. |
| | |
| | 2. FIRE WATCH ACTIVITIES ARE REQUIRED WHENEVER A |
| | REQUIRED SYSTEM IS OUT OF SERVICE FOR MORE THAN FOUR |
| | HOURS IN A TWENTY FOUR HOUR PERIOD. ALL FIRE WATCH |
| | REQUESTS ARE TO BE IN WRITING TO THE BATTALION CHIEF OF |
| | FIRE PREVENTION OR HIS DESIGNEE. PERSONS PERFORMING |
| | FIRE WATCH ACTIVITIES SHALL BE RADIO OR CELLULAR |
| | TELEPHONE EQUIPPED TO REPORT EMERGENCIES. SUFFICIENT |
| | NUMBER OF PERSONS ARE REQUIRED TO PERFORM FIRE WATCH |
| | ACTIVITIES AND ARE TO HAVE NO OTHER DUTIES. |
| | |
| | 3. THE EXISTING FIRE ALARM EQUIPMENT SHALL REMAIN |
| | ACTIVE AS LONG AS POSSIBLE PRIOR TO THE SWITCH-OVER TO |
| | THE NEW EQUIPMENT. THE NEW SYSTEM COMPONENTS SHOULD BE |
| | INSTALLED WHILE THE EXISTING EQUIPMENT REMAINS IN |
| | SERVICE SO AS TO AVOID A POSSIBLE FIRE WATCH. |
| | |
| | 4. NEW FIRE ALARM SYSTEM LOG BOOKS ARE TO BE |
| | ESTABLISHED FOR THE NEW EQUIPMENT. |
| | |
| | 5. THE NEW EQUIPMENT IS TO BE TESTED WITH |
| | REPRESENTATIVES OF THIS OFFICE TO ENSURE PROPER |
| | FUNCTION. |
| | |
| | 6. THE NEW FIRE ALARM SYSTEM COMPONENTS SHALL BE LISTED |
| | FOR THE PURPOSE FOR WHICH THEY ARE INTENDED. |
| | |
| | 7. THE REMOTE ANNUNCIATOR PANELS SHALL BE PLACED IN |
| | AREAS WHERE THEY WILL NOT BECOME OBSTRUCTED OR DAMAGED. |
| | |
| | 8. ALL FIRE ALARM WORK IS SUBJECT TO FIELD INSPECTION |
| | AND APPROVAL. |
| | |
| | 9. PROPER COORDINATION IS TO BE PROVIDED DURING THE |
| | INSTALLATION OF THE NEW FIRE ALARM EQUIPMENT. |