Plan Review Details - Permit 10040681
| Plan Review Stops For Permit 10040681 |
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
P |
Date |
2010-05-14 |
|
|
Cont ID |
|
| Sent By |
mgonzale |
Date |
2010-05-14 |
Time |
14:37 |
Rev Time |
0.00 |
| Received By |
mgonzale |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2010-05-14 14:37:17 | PASSED WITH A PROVISO: | | | | | | 3" DIAMETER WATERMAIN RUNS ALONG THE BACK OF PROPERTY. | | | USE CAUTION WHEN DIGGING AND OR PLANTING. | | | 5' MINIMUM DISTANCE SHOULD BE MAINTAINED FROM THE | | | WATERMAIN. | | | | | | MANUEL JULIAN GONZALEZ | | | CS ENGINEERING REVIEW | | | ENGINEERING SERVICES DEPARTMENT | | | 401 CLEMATIS STREET, | | | WEST PALM BEACH, FL 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 | | | DIRECT: (561) 494-1085 | | | FAX: (561) 494-1116 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2010-05-04 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2010-05-04 |
Time |
15:55 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2010-05-04 |
Time |
15:55 |
Sent To |
Z |
|
| Notes |
| 2010-05-04 15:55:51 | SENT TO ZONING BOX. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2010-05-17 |
|
|
Cont ID |
|
| Sent By |
lmartine |
Date |
2010-04-29 |
Time |
10:23 |
Rev Time |
0.00 |
| Received By |
lmartine |
Date |
2010-04-27 |
Time |
16:42 |
Sent To |
|
|
| Notes |
| 2010-04-27 16:43:21 | SENT TO ZONING BOX |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
2 |
Status |
P |
Date |
2010-05-06 |
|
|
Cont ID |
|
| Sent By |
rkussner |
Date |
2010-05-06 |
Time |
10:00 |
Rev Time |
0.00 |
| Received By |
rkussner |
Date |
2010-05-06 |
Time |
10:00 |
Sent To |
|
|
| Notes |
| 2010-05-06 10:02:01 | ***LANDSCAPE REVIEW APPROVED*** | | | | | | THIS IS BEING SENT TO ENGINEERING TO CHECK FOR | | | STORMWATER RUNOFF BECAUSE OF THE AMOUNT OF PAVED AREA | | | ON THIS SITE---RAK |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
1 |
Status |
F |
Date |
2010-04-29 |
|
|
Cont ID |
|
| Sent By |
rkussner |
Date |
2010-04-29 |
Time |
14:54 |
Rev Time |
0.00 |
| Received By |
rkussner |
Date |
2010-04-29 |
Time |
14:54 |
Sent To |
|
|
| Notes |
| 2010-04-29 15:37:49 | ***LANDSCAPE REVIEW FAILED*** | | | | | | PLEASE RESPOND TO REVIEW COMMENTS IN WRITTEN FORMAT. | | | | | | 1. THE LANDSCAPE PLAN SHALL INCLUDE THE ENTIRE SITE. | | | PLEASE IDENTIFY ALL NEW AND EXISTING PLANTS AND TREES. | | | | | | 2. PLEASE PROVIDE THE TABULATION NECESSARY FOR THE | | | EVALUATION OF COMPLIANCE WITH ARTICLE XIV OF THE ZONING | | | AND LAND DEVELOPMENT REGULATIONS. OPEN SPACE IS | | | DETERMINED BY TAKING THE TOTAL LOT AREA AND DEDUCTING | | | THE FOOTPRINT OF THE BUILDING. THE DIFFERENCE IS THE | | | OPEN SPACE. BASED UPON THE OPEN SPACE, PLEASE SHOW HOW | | | MANY TREES ARE REQUIRED AND PROPOSED. THE SAME APPLIES | | | FOR THE REQUIRED SHRUBS. | | | | | | 3. THE SUBMITTAL SHALL INCLUDE A COST ESTIMATE, THAT | | | INCLUDES THE TOTAL COST OF ALL LANDSCAPE MATERIALS AND | | | LABOR. BROKEN DOWN INTO UNIT COST. | | | | | | 4. THE BRICK DRIVEWAY APPEARS TO END TOWARD THE EAST | | | SIDE BUT AN APRON IS SHOWN IN THE RIGHT-OF-WAY. PLEASE | | | DEFINE THE LIMITS OF THE DRIVEWAY. PURSUANT TO SECTION | | | 94-482 (A), REQUIRED PARKING MAY BE LOCATED IN A FRONT | | | YARD; HOWEVER, THE LESSER OF 1000 SQUARE FEET OR 75 | | | PERCENT OF THE FRONT YARD AREA MUST BE LANDSCAPED. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT ROBERT | | | KUSSNER @ (561) 822-1462, | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
N |
Date |
2010-05-05 |
|
|
Cont ID |
|
| Sent By |
ajones |
Date |
2010-05-05 |
Time |
16:10 |
Rev Time |
0.00 |
| Received By |
ajones |
Date |
2010-04-28 |
Time |
09:57 |
Sent To |
|
|
| Notes |
|
|
|
Account Summary | Usage Policy | Privacy Policy