Plan Review Details - Permit 10040681
Plan Review Stops For Permit 10040681
Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2010-05-14 Cont ID  
Sent By mgonzale Date 2010-05-14 Time 14:37 Rev Time 0.00
Received By mgonzale Date   Time   Sent To  
Notes
2010-05-14 14:37:17PASSED WITH A PROVISO:
  
 3" DIAMETER WATERMAIN RUNS ALONG THE BACK OF PROPERTY.
 USE CAUTION WHEN DIGGING AND OR PLANTING.
 5' MINIMUM DISTANCE SHOULD BE MAINTAINED FROM THE
 WATERMAIN.
  
 MANUEL JULIAN GONZALEZ
 CS ENGINEERING REVIEW
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET,
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2010-05-04 Cont ID  
Sent By jgomez Date 2010-05-04 Time 15:55 Rev Time 0.00
Received By jgomez Date 2010-05-04 Time 15:55 Sent To Z
Notes
2010-05-04 15:55:51SENT TO ZONING BOX.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2010-05-17 Cont ID  
Sent By lmartine Date 2010-04-29 Time 10:23 Rev Time 0.00
Received By lmartine Date 2010-04-27 Time 16:42 Sent To  
Notes
2010-04-27 16:43:21SENT TO ZONING BOX

Review Stop L LANDSCAPING
Rev No 2 Status P Date 2010-05-06 Cont ID  
Sent By rkussner Date 2010-05-06 Time 10:00 Rev Time 0.00
Received By rkussner Date 2010-05-06 Time 10:00 Sent To  
Notes
2010-05-06 10:02:01***LANDSCAPE REVIEW APPROVED***
  
 THIS IS BEING SENT TO ENGINEERING TO CHECK FOR
 STORMWATER RUNOFF BECAUSE OF THE AMOUNT OF PAVED AREA
 ON THIS SITE---RAK

Review Stop L LANDSCAPING
Rev No 1 Status F Date 2010-04-29 Cont ID  
Sent By rkussner Date 2010-04-29 Time 14:54 Rev Time 0.00
Received By rkussner Date 2010-04-29 Time 14:54 Sent To  
Notes
2010-04-29 15:37:49***LANDSCAPE REVIEW FAILED***
  
 PLEASE RESPOND TO REVIEW COMMENTS IN WRITTEN FORMAT.
  
 1. THE LANDSCAPE PLAN SHALL INCLUDE THE ENTIRE SITE.
 PLEASE IDENTIFY ALL NEW AND EXISTING PLANTS AND TREES.
  
 2. PLEASE PROVIDE THE TABULATION NECESSARY FOR THE
 EVALUATION OF COMPLIANCE WITH ARTICLE XIV OF THE ZONING
 AND LAND DEVELOPMENT REGULATIONS. OPEN SPACE IS
 DETERMINED BY TAKING THE TOTAL LOT AREA AND DEDUCTING
 THE FOOTPRINT OF THE BUILDING. THE DIFFERENCE IS THE
 OPEN SPACE. BASED UPON THE OPEN SPACE, PLEASE SHOW HOW
 MANY TREES ARE REQUIRED AND PROPOSED. THE SAME APPLIES
 FOR THE REQUIRED SHRUBS.
  
 3. THE SUBMITTAL SHALL INCLUDE A COST ESTIMATE, THAT
 INCLUDES THE TOTAL COST OF ALL LANDSCAPE MATERIALS AND
 LABOR. BROKEN DOWN INTO UNIT COST.
  
 4. THE BRICK DRIVEWAY APPEARS TO END TOWARD THE EAST
 SIDE BUT AN APRON IS SHOWN IN THE RIGHT-OF-WAY. PLEASE
 DEFINE THE LIMITS OF THE DRIVEWAY. PURSUANT TO SECTION
 94-482 (A), REQUIRED PARKING MAY BE LOCATED IN A FRONT
 YARD; HOWEVER, THE LESSER OF 1000 SQUARE FEET OR 75
 PERCENT OF THE FRONT YARD AREA MUST BE LANDSCAPED.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT ROBERT
 KUSSNER @ (561) 822-1462,
  
  

Review Stop Z ZONING
Rev No 1 Status N Date 2010-05-05 Cont ID  
Sent By ajones Date 2010-05-05 Time 16:10 Rev Time 0.00
Received By ajones Date 2010-04-28 Time 09:57 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved